Zapote station
Manila Light Rail Transit System | |||||||||||
General information | |||||||||||
Location | Barangay Zapote V, Bacoor, Cavite | ||||||||||
Coordinates | 14°28′19″N 120°58′03″E / 14.472026°N 120.96748°E | ||||||||||
Owned by | Light Rail Transit Authority | ||||||||||
Line(s) | Line 1 | ||||||||||
Construction | |||||||||||
Structure type | At-grade | ||||||||||
History | |||||||||||
Opening | 2031 | ||||||||||
Services | |||||||||||
|
Zapote station is a proposed Light Rail Transit (LRT) station located on the LRT Line 1 (LRT-1) system in Bacoor, Cavite. It will be situated at the line's Zapote Satellite Depot. It differs from other LRT-1 stations in that it will be constructed at grade. It is part of the LRT-1 South Extension Project. It would be the first LRT-1 station outside Metro Manila.
History
[edit]Zapote station was first planned as part of the Line 1 South Extension plan, which calls for a mostly elevated extension of approximately 11.7 kilometers (7.3 mi). The extension will have 8 passenger stations with an option for 2 future stations (Manuyo Uno and Talaba).[1] The project was first approved on August 25, 2000 and the implementing agreement for the project was approved on January 22, 2002.[2] However, construction for the extension was repeatedly delayed until the project was shelved years later.
The plans for the southern extension project were restarted as early as 2012 during the second Aquino administration and was expected to begin construction in 2014, but was delayed due to right of way issues. The issues were resolved in 2016 and the project broke ground on May 4, 2017.[3] Meanwhile, construction works on the south extension began on May 7, 2019 after the right-of-way acquisitions were cleared.[2]
As of April 30, 2024[update], phase 1 is 98.2% complete. Department of Transportation Executive Assistant Jonathan Gesmundo announced the construction of 8 additional stations to the current 20 LRT-1 stations with operations of LRT-1 Cavite Extension Phase 1 are expected by mid-November 2024. Meanwhile, phases 2 and 3 will begin operations by 2031.
See also
[edit]External links
[edit]- Media related to Access Road (Zapote station) at Wikimedia Commons
References
[edit]- ^ "Project Update: The Line 1 South Extension Project". Light Rail Transit Authority. Archived from the original on April 30, 2006. Retrieved March 25, 2012.
- ^ a b Orellana, Faye (May 7, 2019). "Construction of LRT-1 Cavite extension begins". Philippine Daily Inquirer. Retrieved August 9, 2021.
- ^ "LRMC breaks ground on LRT-1 Cavite Extension project". Light Rail Manila Corporation. May 4, 2017. Retrieved August 9, 2021.