Jump to content

Talk:Maltby Main Colliery

Page contents not supported in other languages.
From Wikipedia, the free encyclopedia

Possible closure

[edit]

See http://www.bbc.co.uk/news/uk-england-south-yorkshire-19713588 etc - may need updating after decisionOranjblud (talk) 13:18, 25 September 2012 (UTC)[reply]

Assessment comment

[edit]

The comment(s) below were originally left at Talk:Maltby Main Colliery/Comments, and are posted here for posterity. Following several discussions in past years, these subpages are now deprecated. The comments may be irrelevant or outdated; if so, please feel free to remove this section.

.
  1. Requires infobox
  2. Requires photographs
  3. Needs structuring
  4. Requires addition of inline references using one of the {{Cite}} templates
  5. Requires copy edit for WP:MOS
Keith D (talk) 18:11, 15 August 2008 (UTC)[reply]

Last edited at 18:11, 15 August 2008 (UTC). Substituted at 22:55, 29 April 2016 (UTC)

£180 million for Parkgate seam project

[edit]

Surely this cannot be right ? :

In 1981 a major project commenced to mine the Parkgate seam. Costing £180,000,000 the first coal was brought to the surface just one year later. 

£180 million ? Has the decimal point been put in the wrong place ? ! ?--JustinSmith (talk) 09:14, 21 November 2020 (UTC)[reply]