Rashtreeya Vidyalaya Road metro station
Rashtreeya Vidyalaya Road | ||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Namma Metro station | ||||||||||||||||
General information | ||||||||||||||||
Other names | R. V. Road, Rashtreeya Vidyalaya Raste, R. V. Raste, Jayanagara 5th Block, Jayanagar 5th Block | |||||||||||||||
Location | Rashtreeya Vidyalaya Road, 5th Block, Jayanagar, Bengaluru, Karnataka 560041 | |||||||||||||||
Coordinates | 12°55′17″N 77°34′49″E / 12.921458°N 77.580375°E | |||||||||||||||
Owned by | Bangalore Metro Rail Corporation Ltd (BMRCL) | |||||||||||||||
Operated by | Namma Metro | |||||||||||||||
Line(s) | Green Line Yellow Line | |||||||||||||||
Platforms | Side platform Platform-1 → Madavara Platform-3 → Train terminates here Platform-4 → Bommasandra Platform numbers (TBC) | |||||||||||||||
Tracks | 2 + 2 (U/C) | |||||||||||||||
Connections | Upcoming Yellow Line | |||||||||||||||
Construction | ||||||||||||||||
Structure type | Elevated, Double track | |||||||||||||||
Platform levels | 2 | |||||||||||||||
Accessible | Yes | |||||||||||||||
Other information | ||||||||||||||||
Status | Staffed | |||||||||||||||
Station code | RVR | |||||||||||||||
History | ||||||||||||||||
Opened | 18 June 2017 | |||||||||||||||
Opening | January 2025 (TBC) | |||||||||||||||
Electrified | 750 V DC third rail | |||||||||||||||
Services | ||||||||||||||||
| ||||||||||||||||
|
Rashtreeya Vidyalaya Road is an elevated interchange metro station on the North-South corridor of the Green Line and the East-West corridor of the upcoming Yellow Line of Namma Metro serving the 5th and 8th Block of Jayanagar area of Bangalore, India. It was opened to the public on 18 June 2017.[1]
As per latest reports, the Yellow Line is slated to be operational between 2nd & 4th weeks of January 2025[2] due to lots of trial runs along with more trainsets which are needed for commencement of operations.[3][4][5][6][7]
History
[edit]In December 2016, the Bangalore Metro Rail Corporation Limited (BMRCL) issued a call for bids to construct the terminal metro station (Rashtreeya Vidyalaya Road) along the 6.340 km Reach 5 – Package 3 section (Central Silk Board - Rashtreeya Vidyalaya Road) of the 18.825 km Yellow Line of Namma Metro. On 16 May 2017, HCC-URC Cementation JV was selected as the lowest bidder for this stretch, with their bid closely aligning with the original cost estimates.[8] Consequently, the contract was successfully awarded to the company, which then commenced construction of the metro station in accordance with the agreements.
Station layout
[edit]Rashtreeya Vidyalaya Road track layout | ||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||||||||||||||||||||||||||||||||||
Station with two tracks and two side platforms
|
Rashtreeya Vidyalaya Road track layout ** | ||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||||||||||||||||||||||||||||||||||
Station with two tracks and two side platforms
** (Final Stages before Operations) |
G | Street level | Exit/Entrance |
L1 | Mezzanine | Fare control, station agent, Metro Card vending machines, crossover |
L2 | Side platform | Doors will open on the left | |
Platform 2 Southbound |
Towards → Silk Institute Next Station: Banashankari | |
Platform 1 Northbound |
Towards ← Madavara Next Station: Jayanagar | |
Island platform | P1 & P# doors will open on the left Yellow Line Station Layout & Platform Numbers - (TBC) | ||
Platform # Southbound |
Towards → Bommasandra Next Station: Ragigudda | |
Platform # Northbound |
Towards ← Train Terminates Here | |
Side platform | Doors will open on the left | ||
L2 |
Entry/Exits
[edit]There are 2 Entry/Exit points – A and B. Commuters can use either of the points for their travel.
- Entry/Exit point A: Towards Jayanagar 5th Block side
- Entry/Exit point B: Towards Jayanagar 7th/8th Blocks side with wheelchair accessibility
See also
[edit]- Bangalore
- List of Namma Metro stations
- Transport in Karnataka
- List of metro systems
- List of rapid transit systems in India
References
[edit]- ^ "Nagasandra-Puttenahalli Metro line to open by May-end, says KJ George". The Times of India. 3 May 2017. Retrieved 2 July 2017.
- ^ "Bengaluru: Yellow Line safety clearance by December end, opening after second week of January". Deccan Herald. Retrieved 29 October 2024.
- ^ "Bengaluru Metro's Yellow Line to Open in November 2024, Tejasvi Surya Shares Key Details". TimesNow. 9 March 2024. Retrieved 10 March 2024.
- ^ DHNS. "Bengaluru metro's Yellow Line to start only after general elections". Deccan Herald. Retrieved 14 December 2023.
- ^ "RV Road-Bommasandra Metro stretch to open by April: CM Siddaramaiah". The New Indian Express. Retrieved 11 November 2023.
- ^ "Metro Yellow Line to E-City & extended Green Line to open by April 2024: CM Siddramaiah". The Times of India. 21 October 2023. ISSN 0971-8257. Retrieved 11 November 2023.
- ^ "Bengaluru metro's yellow line connecting Bommasandra to Silk Board to open by February 2024, says MP Tejasvi Surya". Hindustan Times. 6 October 2023. Retrieved 11 November 2023.
- ^ "HCC-URC JV Lowest Bidder for Bangalore Metro's RV Rd - HSR Layout". The Metro Rail Guy. 16 May 2017. Retrieved 23 October 2024.
External links
[edit]- Bangalore Metro Rail Corporation Ltd. (Official site)
- UrbanRail.Net – descriptions of all metro systems in the world, each with a schematic map showing all stations.