Jayadeva Hospital metro station

Coordinates: 12°55′00″N 77°36′00″E / 12.916744°N 77.600117°E / 12.916744; 77.600117
From Wikipedia, the free encyclopedia

Jayadeva Hospital
Namma Metro station
Side view of Under Construction of this metro station under Yellow Line and Pink Line of Namma Metro
General information
LocationJayadeva Junction, BHBCS Layout, BTM Layout Stage 2, Bengaluru, Karnataka 560076
Coordinates12°55′00″N 77°36′00″E / 12.916744°N 77.600117°E / 12.916744; 77.600117
Elevation29 m (95 ft) from Street Level (TBC)
Owned byBangalore Metro Rail Corporation Ltd (BMRCL)
Operated byNamma Metro
Line(s)Yellow Line Pink Line
Platforms  Side platform
Platform-1 → Rashtreeya Vidyalaya Road
Platform-2 → Bommasandra
  Side platform
Platform-3 → Kalena Agrahara
Platform-4 → Nagawara
Platform numbers (TBC)
Tracks4
Construction
Structure typeElevated, Double track x2
Platform levels4
Accessible(TBC)
Other information
Status  Final Stages before Operations
  Under Construction
History
Opening  25 January 2025; 2 months' time (25 January 2025) (TBC)
  December 2025; 12 months' time (December 2025) (TBC)
Electrified750 V DC third rail
Services
Preceding station Namma Metro Following station
Ragigudda Yellow Line
(Operational around January 2025)
BTM Layout
towards Bommasandra
Tavarekere
towards Nagawara
Pink Line
(Operational around December 2025)
JP Nagar 4th Phase
Location
Map

Jayadeva Hospital is an upcoming double-elevated interchange metro station on the North-South corridor of the Yellow Line and Pink Line[1] of Namma Metro in Bangalore, India. This metro station will be the first multi-elevated interchange metro station in the Namma Metro network. This metro station is named after the Sri Jayadeva Institute of Cardiovascular Sciences and Research which is located nearby and serves MICO Layout (BTM), Guruppanpalya, Jayanagar and JP Nagar 3rd Phase.

As per latest reports, the Yellow Line is slated to be operational between 2nd & 4th weeks of January 2025[2] due to lots of trial runs along with more trainsets which are needed for commencement of operations.[3][4][5][6][7][8] Meanwhile, the elevated section of Pink Line covering a distance of 7.5km (Kalena Agrahara - Tavarekere), is expected to be operational around December 2025 [9] instead of September 2025. [10][11][12][13][14][15]

History

[edit]

Yellow Line

[edit]

In December 2016, the Bangalore Metro Rail Corporation Limited (BMRCL) issued a call for bids to construct the Jayadeva Hospital metro station along the 6.340 km Reach 5 – Package 3 section (Central Silk Board - Rashtreeya Vidyalaya Road) of the 18.825 km Yellow Line of Namma Metro. On 16 May 2017, HCC-URC Cementation JV was selected as the lowest bidder for this stretch, with their bid closely aligning with the original cost estimates.[16] Consequently, the contract was successfully awarded to the company, which then commenced construction of the metro station in accordance with the agreements.

Station layout

[edit]

This metro station will consist of five levels from underground to the top level as given below:

  • Level 1 → Underpass connecting Bannerghatta and Dairy Circle
  • Level 2 → Street Level surface connecting Ragigudda and BTM Layout
  • Level 3 → Elevated Flyover from Ragigudda to Central Silk Board
  • Level 4 → Yellow Line Platforms
  • Level 5 → Mezzanine (Concourse)
  • Level 6 → Pink Line Platforms

Station layout (TBC)

[edit]
Jayadeva Hospital track layout (TBC)
P#
P#
Station with two tracks and two side platforms
Jayadeva Hospital track layout (TBC)
P#
P#
Station with two tracks and two side platforms
** Proposed
UG Underpass level Bannerghatta - Dairy Circle Underpass
G Street level Exit/Entrance
L1 Flyover Raggigudda-Silk Board Flyover
L2 Side platform | Doors will open on the left Disabled access
Platform #
Eastbound
Towards → Bommasandra
Next Station: BTM Layout
Platform #
Westbound
Towards ← Rashtreeya Vidyalaya Road
Next Station: Ragigudda
Side platform | Doors will open on the left Disabled access
L3 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L4 Side platform | Doors will open on the left Disabled access
Platform #
Southbound
Towards → Kalena Agrahara
Next Station: JP Nagar 4th Phase
Change at the next station for Orange Line ** (Proposed)
Platform #
Northbound
Towards ← Nagawara
Next Station: Tavarekere
Side platform | Doors will open on the left Disabled access
L4 Platform Numbers (TBC)

See also

[edit]

References

[edit]
  1. ^ "Namma Metro Pink Line: Route, Status, Completion Date & More". timesproperty. Retrieved 15 December 2023.
  2. ^ "Bengaluru: Yellow Line safety clearance by December end, opening after second week of January". Deccan Herald. Retrieved 29 October 2024.
  3. ^ "Bengaluru Metro's Yellow Line to Open in November 2024, Tejasvi Surya Shares Key Details". TimesNow. 9 March 2024. Retrieved 10 March 2024.
  4. ^ DHNS. "Bengaluru metro's Yellow Line to start only after general elections". Deccan Herald. Retrieved 14 December 2023.
  5. ^ "RV Road-Bommasandra Metro stretch to open by April: CM Siddaramaiah". The New Indian Express. Retrieved 11 November 2023.
  6. ^ "Metro Yellow Line to E-City & extended Green Line to open by April 2024: CM Siddramaiah". The Times of India. 21 October 2023. ISSN 0971-8257. Retrieved 11 November 2023.
  7. ^ "Bengaluru metro's yellow line connecting Bommasandra to Silk Board to open by February 2024, says MP Tejasvi Surya". Hindustan Times. 6 October 2023. Retrieved 11 November 2023.
  8. ^ "Titagarh to supply the first train for Bengaluru metro's Electronics City corridor in August 2024". Moneycontrol. 10 May 2024. Retrieved 1 June 2024.
  9. ^ "Bengaluru: Namma Metro pushes Pink Line deadline to December 2026". Deccan Herald. Retrieved 4 November 2024.
  10. ^ Bureau, The Hindu (4 August 2024). "Namma Metro's Pink line likely to open in phases". The Hindu. ISSN 0971-751X. Retrieved 7 August 2024. {{cite news}}: |last= has generic name (help)
  11. ^ "Namma Metro's Pink Line: This Upcoming Corridor Is Set To Redefine The City Commute". TimesNow. 25 June 2023. Retrieved 15 December 2023.
  12. ^ "Namma Metro Phase 2 In Bengaluru To Be Operational By 2025, Announces Karnataka Deputy CM". TimesNow. 10 February 2024. Retrieved 12 February 2024.
  13. ^ Staff Reporter (27 September 2023). "Good News! Pink Line of Bengaluru Metro to be 90% Ready by Second-half of 2024". Metro Rail News. Retrieved 15 December 2023.
  14. ^ "Namma Metro: Bengaluru's Under-Construction Pink Line Slated To Achieve 2 Milestones In a Week". TimesNow. 31 January 2024. Retrieved 1 February 2024.