Kalena Agrahara metro station

Coordinates: 12°52′18″N 77°35′37″E / 12.87158°N 77.59363°E / 12.87158; 77.59363
From Wikipedia, the free encyclopedia

Kalena Agrahara
Namma Metro station
Under Construction of Kalena Agrahara metro station under Pink Line as of November 2024
General information
Other namesGottigere
LocationMantri Residency Rd, near Sri Meenakshi Sundareshwara Temple, Classic Orchards Layout, Kalena Agrahara, Bengaluru, Karnataka 560076
Coordinates12°52′18″N 77°35′37″E / 12.87158°N 77.59363°E / 12.87158; 77.59363
Owned byBangalore Metro Rail Corporation Ltd (BMRCL)
Operated byNamma Metro
Line(s)Pink Line
PlatformsSide platform (TBC)
Platform-1 → Train Terminates Here
Platform-2 → Nagawara
Platform Numbers (TBC)
Tracks2 (TBC)
Construction
Structure typeElevated, Double track
Platform levels2 (TBC)
Parking(TBC)
Accessible(TBC)
Other information
StatusUnder Construction
Station code(TBC)
History
OpeningDecember 2025; 12 months' time (December 2025) (TBC)
Electrified(TBC)
Services
Preceding station Namma Metro Following station
Hulimavu
towards Nagawara
Pink Line
(Operational around December 2025)
Terminus
Location
Map

Kalena Agrahara is an upcoming elevated southern terminal metro station on the North-South corridor of the Pink Line[1] of Namma Metro in Bangalore, India. This metro station serves residential properties and a few other locations including Prestige Elysian, Holy Spirit School (ICSE), Doddakammanahalli suburban area and Decathlon (Bannerghatta Road).

As per the latest updates, this metro station, under the first phase, covering a total distance of 7.5km elevated stretch (Kalena Agrahara - Tavarekere), is expected to be operational around December 2025 [2] instead of September 2025. [3][4][5][6][7]

History

[edit]

In March 2017, the Bangalore Metro Rail Corporation Limited (BMRCL) sought bids for building the Kalena Agrahara metro station on the 7.5 km Kalena Agrahara - South Ramp section of the 21.25 km Pink Line of Namma Metro. This section comprises 5 stations, excluding Jayadeva Hospital, which was part of a joint venture between HCC - URC Constructions. Initially, Simplex Infrastructures won the tender in September 2017 but due to slow progress, their contract was terminated. [8] In July 2021, GR Infraprojects became the lowest bidder and was awarded the Rs 364.87 Crore contract for this section. They commenced the construction of this metro station as per the agreement. [9]

Station layout

[edit]

Station Layout - To Be Confirmed [10]

Kalena Agrahara track layout (TBC)
P#
P#
to Train Terminates Here
P#
P#
to Hulimavu / Kothanur Depot
Station with three tracks | One Side & Island platform
G Street Level Exit/ Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform #
Southbound
Towards → Train Terminates Here
Platform #
Northbound
Towards ← Nagawara
Next Station: Hulimavu
Island platform | P# Doors will open on the left | P# Doors will open on the right Disabled access
Platform #
Northbound
Towards ← Nagawara / Kothanur Depot
Next Station: Hulimavu
L2 Note: (Towards Nagawara - Operational during peak hours)

Connections

[edit]

Entry/Exit

[edit]

See also

[edit]

References

[edit]
  1. ^ "Namma Metro Pink Line: Route, Status, Completion Date & More". timesproperty. Retrieved 15 December 2023.
  2. ^ "Bengaluru: Namma Metro pushes Pink Line deadline to December 2026". Deccan Herald. Retrieved 4 November 2024.
  3. ^ Bureau, The Hindu (4 August 2024). "Namma Metro's Pink line likely to open in phases". The Hindu. ISSN 0971-751X. Retrieved 7 August 2024. {{cite news}}: |last= has generic name (help)
  4. ^ "Namma Metro's Pink Line: This Upcoming Corridor Is Set To Redefine The City Commute". TimesNow. 25 June 2023. Retrieved 15 December 2023.
  5. ^ "Namma Metro Phase 2 In Bengaluru To Be Operational By 2025, Announces Karnataka Deputy CM". TimesNow. 10 February 2024. Retrieved 12 February 2024.
  6. ^ Staff Reporter (27 September 2023). "Good News! Pink Line of Bengaluru Metro to be 90% Ready by Second-half of 2024". Metro Rail News. Retrieved 15 December 2023.
  7. ^ "Namma Metro: Bengaluru's Under-Construction Pink Line Slated To Achieve 2 Milestones In a Week". TimesNow. 31 January 2024. Retrieved 1 February 2024.
  8. ^ "Bangalore Metro Terminates Simplex Infra's Pink Line Contract". The Metro Rail Guy. 4 February 2021. Retrieved 29 March 2024.
  9. ^ "GR Infra Wins Bangalore Metro Pink Line's Pending Work". The Metro Rail Guy. 16 July 2021. Retrieved 29 March 2024.
  10. ^ "Bengaluru Metro: Track-Laying Work Is Expected To Complete By Second Half Of 2024". News18. 28 September 2023. Retrieved 15 December 2023.
[edit]