Jump to content

Tannery Road metro station

Coordinates: 13°00′32″N 77°36′49″E / 13.00899°N 77.613491°E / 13.00899; 77.613491
From Wikipedia, the free encyclopedia

Tannery Road
Namma Metro station
General information
Location601, Nagawara Main Rd, Muslim Colony, Doddama Layout, Venkateshpuram, Bengaluru, Karnataka 560045
Coordinates13°00′32″N 77°36′49″E / 13.00899°N 77.613491°E / 13.00899; 77.613491
Owned byBangalore Metro Rail Corporation Ltd (BMRCL)
Operated byNamma Metro
Line(s)Pink Line
PlatformsIsland platform
Platform-1 → Kalena Agrahara
Platform-2 → Nagawara
Platform numbers (TBC)
Tracks2
Construction
Structure typeUnderground, double track
Platform levels2
Other information
StatusUnder construction
History
OpeningDecember 2026; 2 years' time (December 2026) (TBC)
Electrified(TBC)
Services
Preceding station Namma Metro Following station
Venkateshpura
towards Nagawara
Pink Line
(operational around December 2026)
Pottery Town
Location
Map

Tannery Road is an upcoming underground metro station on the north-south corridor of the Pink Line[1] of Namma Metro in Bangalore, India. This metro station will consist of the main Richards Town suburban area followed by other prime neighbourhood suburban areas like Lingarajapuram, St. Thomas Town, Cooke Town and Williams Town.

As per the latest updates, this metro station, under the second phase, covering the total distance of 13.8km stretch (Dairy Circle - Nagawara) is expected to be operational around December 2026. [2][3][4][5][6][7]

History

[edit]

In June 2017, Bangalore Metro Rail Corporation Limited (BMRCL) sought bids for constructing the Tannery Road metro station along the 4.59 km Shadi Mahal Ramp - North Ramp stretch of the 21.25 km Pink Line of Namma Metro. In November 2019, ITD Cementation India emerged as the lowest bidder for this stretch which aligned closely with the original estimate, thus leading to successful award for this company. They commenced the construction of this metro station as per the agreements.

Station layout

[edit]

Station layout

Tannery Road track layout
P#
P#
Station with two tracks and one island platform
** Under construction
G Street level Exit/entrance
L1 Mezzanine Fare control, station agent, ticket/token, shops
L2 Platform #
Southbound
Towards → Kalena Agrahara
Next station: Pottery Town
Island platform | Doors will open on the right Disabled access
Platform #
Northbound
Towards ← Nagawara
Next station: Venkateshpura
L2

Connections

[edit]

Entry/exit

[edit]

See also

[edit]

References

[edit]
  1. ^ "Namma Metro Pink Line: Route, Status, Completion Date & More". timesproperty. Retrieved 15 December 2023.
  2. ^ "Bengaluru: Namma Metro pushes Pink Line deadline to December 2026". Deccan Herald. Retrieved 4 November 2024.
  3. ^ Bureau, The Hindu (4 August 2024). "Namma Metro's Pink line likely to open in phases". The Hindu. ISSN 0971-751X. Retrieved 7 August 2024. {{cite news}}: |last= has generic name (help)
  4. ^ "Namma Metro's Pink Line: This Upcoming Corridor Is Set To Redefine The City Commute". TimesNow. 25 June 2023. Retrieved 15 December 2023.
  5. ^ "Namma Metro Phase 2 In Bengaluru To Be Operational By 2025, Announces Karnataka Deputy CM". TimesNow. 10 February 2024. Retrieved 12 February 2024.
  6. ^ Staff Reporter (27 September 2023). "Good News! Pink Line of Bengaluru Metro to be 90% Ready by Second-half of 2024". Metro Rail News. Retrieved 15 December 2023.
  7. ^ "Namma Metro: Bengaluru's Under-Construction Pink Line Slated To Achieve 2 Milestones In a Week". TimesNow. 31 January 2024. Retrieved 1 February 2024.
[edit]
  • BMRCL English - BMRCL official website
  • UrbanRail.Net – descriptions of all metro systems in the world, each with a schematic map showing all stations