Jump to content

Thalaghattapura metro station

Coordinates: 12°52′18″N 77°32′20″E / 12.871678475719564°N 77.5387583624092°E / 12.871678475719564; 77.5387583624092
From Wikipedia, the free encyclopedia

Thalaghattapura
Namma Metro station
A Green Line Namma Metro train at this metro station leading towards Silk Institute (southbound) or towards Nagasandra (northbound)
General information
Other namesParamount Gardens
Location15/3, Kanakapura Rd, Paramount Gardens, Talaghattapura, Bengaluru, Karnataka 560062
Coordinates12°52′18″N 77°32′20″E / 12.871678475719564°N 77.5387583624092°E / 12.871678475719564; 77.5387583624092
Owned byBangalore Metro Rail Corporation Ltd (BMRCL)
Operated byNamma Metro
Line(s)Green Line
PlatformsSide platform
Platform-1 → Madavara
Platform-2 → Silk Institute
Tracks2
Construction
Structure typeElevated, double track
Platform levels2
AccessibleYes Disabled access
Other information
StatusStaffed
Station codeTGTP
History
Opened21 January 2021; 3 years ago (2021-01-21)[1]
Electrified750 V DC third rail
Services
Preceding station Namma Metro Following station
Vajarahalli
towards Madavara
Green Line Silk Institute
Terminus
Location
Map

Thalaghattapura is an elevated metro station on the North-South corridor of the Green Line of Namma Metro in Bangalore, India.[1][2] This station was opened on 21 January 2021 to the public. The station was inaugurated along with five other stations, as a part of the Green Line extension.[3][4]

Station layout

[edit]
Thalaghattapura track layout
P1
P2
Station with two tracks and two side platforms
G Street level Exit/entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform 2
Southbound
Towards → Silk Institute
Platform 1
Northbound
Towards ← Madavara
Next station: Vajarahalli
Side platform | Doors will open on the left Disabled access
L2

Entry/exits

[edit]

There are two entry/exit points – A and B. Commuters can use either for their travel.

  • Entry/exit point A: towards post office side
  • Entry/exit point B: towards SJS Enterprises Pvt. Ltd. side

See also

[edit]

References

[edit]
  1. ^ a b Nag, Devanjana (15 January 2021). "Bengaluru's Namma Metro stretch from Yelachenahalli to Silk Institute launched; open for public from today". Financial Express. Retrieved 28 November 2022.
  2. ^ Christin Mathew Philip (16 January 2021). "Bengaluru: 5,000 take Yelachenahalli- Silk Institute Metro line on Day 1 | Bengaluru News - Times of India". The Times of India. Retrieved 1 September 2021.
  3. ^ "Namma Metro's 6 Km Yelachenahalli To Silk Institute Stretch Flagged-off". Moneycontrol. Retrieved 1 September 2021.
  4. ^ Christin Mathew Philip (13 January 2021). "Bengaluru: Namma Metro's Sankranti gift brings cheer to Kanakapura Road residents | Bengaluru News - Times of India". The Times of India. Retrieved 1 September 2021.