Jump to content

Madavara metro station

Coordinates: 13°03′27″N 77°28′17″E / 13.05739°N 77.47140°E / 13.05739; 77.47140
From Wikipedia, the free encyclopedia

Madavara
Namma Metro station
General information
LocationMadavara, Bengaluru, Karnataka, 560073
Coordinates13°03′27″N 77°28′17″E / 13.05739°N 77.47140°E / 13.05739; 77.47140
Owned byBangalore Metro Rail Corporation Ltd (BMRCL)
Operated byNamma Metro
Line(s)Green Line
PlatformsSide platform
Platform-1 → Train Terminates Here
Platform-2 → Silk Institute
Tracks2
Construction
Structure typeElevated, Double track
Platform levels2
Parking(TBC)
Accessible(TBC)
Other information
StatusOperational & Staffed
Station code(TBC)
History
Opened7 November 2024; 2 days ago (7 November 2024)
Electrified750 V DC third rail
Previous namesBIEC
Services
Preceding station Namma Metro Following station
Terminus Green Line Chikkabidarakallu
Location
Map

Madavara is the elevated northern terminal metro station on the North-South corridor of the Green Line of Namma Metro in Bangalore, India. Around this metro station holds the main Bengaluru International Exhibition Centre, an important Exhibition Centre for conducting different exhibition events, conferences from all over the world.

As per latest updates, the Madavara - Nagasandra stretch trial run was conducted on August 6 2024[1][2] and with successful trial run, this metro station was opened on November 6 2024 with the commercial run started from November 7 2024.[3][4] This metro station was opened without any inauguration ceremony but will be formally inaugurated at a later stage. [5][6][7]

Station layout

[edit]
Madavara track layout
to Train Terminates Here
P1
P2
Station with two tracks and two side platforms
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform 2
Southbound
Towards → Silk Institute
Next Station: Chikkabidarakallu
Platform 1
Northbound
Towards ← Train Terminates Here
Side platform | Doors will open on the left Disabled access
L2

Entry/Exits

[edit]

Boli maklu shata thara 10 varsha thogondru Metro build madake Jayanagar

See also

[edit]

References

[edit]
  1. ^ Ghoshal, Sudeshna (6 August 2024). "Bengaluru metro update: New trains on Green line for THESE stations in Bangalore; trial run today". Mint. Retrieved 7 August 2024.
  2. ^ Sridhar Vivan (5 August 2024). "Green line trial runs kick off in August". Bangalore Mirror. Retrieved 7 August 2024.
  3. ^ "Extended Namma Metro Green Line operation launch likely on November 6". The Times of India. 5 November 2024. ISSN 0971-8257. Retrieved 6 November 2024.
  4. ^ "Bengaluru Metro's Green Line extension set to open on Nov 7". Deccan Herald. Retrieved 6 November 2024.
  5. ^ "Day before public launch, DK Shivakumar takes metro ride to Madavara". Deccan Herald. Retrieved 7 November 2024.
  6. ^ "After 7 years, extended Green Line opens today". The Times of India. 6 November 2024. ISSN 0971-8257. Retrieved 7 November 2024.
  7. ^ "Extended Metro green line from Nagasandra to Madavara inaugurated - Public TV English". 6 November 2024. Retrieved 7 November 2024.
[edit]