GA Review

[edit]
GA toolbox
Reviewing
This review is transcluded from Talk:Interstate 81 in Tennessee/GA1. The edit link for this section can be used to add comments to the review.

Reviewer: Floydian (talk · contribs) 01:25, 19 January 2023 (UTC)[reply]


I will review this article. - Floydian τ ¢ 01:25, 19 January 2023 (UTC)[reply]

RD
  • The use of "later" is a tad excessive. Try alternatives such as "beyond which" or "shortly/soon thereafter".
    •  Fixed - I've also made some other minor changes to this section and elsewhere, please let me know if you think my changes are adequate.
  • The paragraphs are oddly constructed, I suggest rearranging them a bit to make three:
    • "the interstate crosses over a ridge and into Greene County.{split} About five miles (8.0 km) beyond this point" - split the paragraph here and change "this point" to "the Green County boundary" or something similar.
      •  Done
    • "A few miles later, I-81 shifts sharply east and crosses into semi-urban Washington County. Immediately beyond this point is an interchange with SR 93, which provides access to Jonesborough to the south and Fall Branch to the north. I-81 then turns northeast again and, a short distance later, crosses into Sullivan County." - move this into the previous paragraph.
      •  Done
  • We really need something more than just Google maps. Do you have a road map of Tennessee or of the states that you can add?
    •  Done - added county maps from TDOT. These are more detailed than statewide maps.
RJL

Gonna reference exit numbers here

  • 1/57/74 - use of "exit" vs. "Exit" is inconsistent. Usually it is capitalised.
    • I don't think "exit" is a proper name here. I've uncapped all.
  • 63 - remove "Also"
    •  Done
  • 57 - add refs from the article for the "former" bit
    •  Done
Images
  • All check out for free licencing, suggest adding alt text, but not a necessity for GAN
History
  • "The general location of the highway that became I-81 was included in a plan released on August 2, 1947, by the Public Roads Administration of the now-defunct Federal Works Agency for the nationwide highway network that became the Interstate Highway System, which recommended that it terminate east of Knoxville with what became I-40." - Even in my head this is a tongue-twister. There must be a better way to describe the government agencies.
    •  Done - I've reworded and split the run on sentence. Please let me know if this is adequate.
  • "During the planning phase, the highway was also suggested to generally follow the corridor of" - oddly wordy. "During planning, it was suggested that the highway follow the corridor of"
    •  Done - Reworded. I feel like including "also" is important, however, since this wasn't the only (and original) alignment that was suggested during the planning phase. Feel free to suggest a better way to reword this if you have any ideas.
  • "The segment between the southern terminus with I-40 and US 25E near Morristown was contracted in June 1964" - "was contracted" should be expanded upon.
    •  Done - It means the contract for construction was awarded.
  • "who had served as Governor from 1959 to 1963," - "had" is unnecessary
    •  Fixed
  • "Work on the stretch between US 25E near Morristown and US 11E near Mosheim was contracted in August 1967 and February 1968" - again with "contracted", it's an odd use of the verb. Maybe "Contracts were let on the stretch... in August..."
    •  Fixed
  • "what became the final stretch of I-81 in Tennessee to be completed ... The last section of I-81 in Tennessee, located in Greene County" - These don't align well. Also there's the use of contracted as a verb right after, and it makes me feel like I have an STD :)
    •  Done - reworded to distinguish between the last stretch to open (Mosheim to Blountville) and the last stretch to be placed under construction (Greene County), of which the latter was part of the former. Please let me know if you think this is better understandable. I also added a small detail about the Greene County stretch.
  • "Completion of I-81 in Tennessee was expected by late 1973 once all remaining construction had begun," -> "Once all remaining construction began, completion of I-81 in Tennessee was expected by late 1973,"
    •  Done
  • "Initially planned to be completed in late 2000," -> "Initially planned for completion in late 2000,"
    •  Done
  • "on-ramp" -> "onramp"
    •  Done

And that's all I've got. I'm placing this on hold, but I won't hold (lolpun) you to the 7 day limit - Floydian τ ¢ 00:46, 22 January 2023 (UTC)[reply]

    • @Floydian: Thanks. The only real concern I had deals with the alternate alignment that was advocated by some. I haven't found any evidence that this was ever seriously considered by any federal agency, and I don't want the article to give the impression of this. I also don't want the article to give the impression that community opposition, i.e. highway revolts, prevented the highway from being built in Grainger County; I don't think that would have been possible in the 1950s. I wish I could find more sources dealing with the other (weakly proposed) routing, but so far I have been unsuccessful. Another editor a while back added a statement that the highway's alignment resulted from the actions of a U.S. Senator; however, the source they provided didn't support this, and I couldn't find any other sources to corroborate this. I think it may have been an unfounded accusation by someone. Anyways, you can go ahead and pass if you think it's ready, and thanks for reviewing! Bneu2013 (talk) 03:04, 25 January 2023 (UTC)[reply]
      Do you have access to The Wikipedia Library? If not, I can do a search for you and email you some clips. I've got access to Newspapers.com and ProQuest. In either case, reach out to me on my talk page. I'm going to pass this for now! - Floydian τ ¢ 03:50, 25 January 2023 (UTC)[reply]

Did you know nomination

[edit]
The following is an archived discussion of the DYK nomination of the article below. Please do not modify this page. Subsequent comments should be made on the appropriate discussion page (such as this nomination's talk page, the article's talk page or Wikipedia talk:Did you know), unless there is consensus to re-open the discussion at this page. No further edits should be made to this page.

The result was: promoted by Bruxton (talk00:22, 26 January 2023 (UTC)[reply]

  • ... that Interstate 81 in Tennessee was the site of a carjacking that culminated in the Lillelid murders in 1997? Source: DeLozier, Stan (April 9, 1997). "6 suspects in triple slaying caught at U.S.-Mexico border; 'Wild bunch' charged in deaths of Powell family". The Knoxville News-Sentinel. pp. 1A, 3A. Retrieved September 30, 2022 – via Newspapers.com.
    • Reviewed:

Improved to Good Article status by Bneu2013 (talk). Self-nominated at 15:27, 25 January 2023 (UTC). Note: As of October 2022, all changes made to promoted hooks will be logged by a bot. The log for this nomination can be found at Template talk:Did you know nominations/Interstate 81 in Tennessee, so please watch a successfully closed nomination until the hook appears on the Main Page.[reply]

General: Article is new enough and long enough
Policy: Article is sourced, neutral, and free of copyright problems
Hook: Hook has been verified by provided inline citation
QPQ: None required.
Overall: @Bneu2013: Good article. Onegreatjoke (talk) 19:28, 25 January 2023 (UTC)[reply]