Nobelwind Offshore Wind Farm
Appearance
Nobelwind | |
---|---|
Country |
|
Coordinates | 51°39′47″N 2°50′02″E / 51.6631°N 2.8339°E |
Status | Operational |
Commission date |
|
Wind farm | |
Type | |
Max. water depth |
|
Distance from shore |
|
Rotor diameter |
|
Site area |
|
Power generation | |
Units operational | 50 × 3.3 MW |
Make and model | Vestas V112-3.3 MW (50) |
Nameplate capacity |
|
External links | |
Commons | Related media on Commons |
Nobelwind (also known as Belwind 2 or Bligh Bank Phase II) is an offshore wind farm located on the Bligh Bank in the Belgian part of the North Sea. The wind farm lies directly to the south of the Northwester 2 wind farm and to the north of the Seastar wind farm. The farm was commissioned in 2017 and is the fourth offshore wind project in Belgium. It is built as an extension to the Belwind wind farm.[1]
The wind farm consists of 50 Vestas V112 wind turbines with a capacity of 3.3 MW each, giving the farm a total capacity of 165 MW. The farms submarine electrical export cable is connected to the nearby Northwind offshore wind farm, from where it has a shared connection to the main land.[2][3]
See also
[edit]References
[edit]- ^ "Projects". Belgian Offshore Platform. Retrieved 2023-10-17.
- ^ "Nobelwind". Belgian Offshore Platform. Retrieved 2023-10-17.
- ^ "Nobelwind". Parkwind. Retrieved 2023-10-17.