Jump to content

Nantong Rail Transit

From Wikipedia, the free encyclopedia
Nantong Rail Transit
Overview
Native name南通轨道交通
LocaleNantong, Jiangsu, China
Transit typeRapid transit
Number of lines2 (in operation)
Number of stations45 (in operation)
Operation
Began operation10 November 2022; 2 years ago (2022-11-10)[1]
Operator(s)Nantong Rail Transit Co., Ltd.
CharacterUnderground (Lines 1 & 2)
Technical
System length60.03 km
System map

Nantong Rail Transit (Chinese: 南通轨道交通; pinyin: Nántōng Guǐdào Jiāotōng) is a rapid transit system in Nantong, Jiangsu Province, China.

In August 2014, China's National Development and Reform Commission approved Nantong Rail Transit's short-term (2014-2020) construction plan, including Line 1 and Line 2.[2][3]

History

[edit]

In October 2011, the third meeting of the Standing Committee of the Municipal People's Congress of Nantong City launched the "Nantong Urban Rail Transit Planning Work" plan. In April 2012, the Nantong Rail Transit plan was released and circulated online.

On 19 August 2014, Nantong's urban rail rapid transit construction plan was approved by the National Development and Reform Commission,[2][3] becoming the sixth in Jiangsu and the 37th city in mainland China approved for rapid transit.[4]

Lines in operation

[edit]
Line Terminals
(District)
Commencement Length
km
Stations
 1  Pingchao
(Tongzhou)
Zhenxing Lu
(Chongchuan)
10 November 2022 39.18 28
 2  Xingfu
(Chongchuan)
Xianfeng
(Tongzhou)
27 December 2023 20.85 17
Total 60.03 45

Line 1

[edit]

Line 1's construction began on 18 December 2017,[5] and opened on 10 November 2022.[1] Line 1 begins at Pingchao Station (平潮站) and ends at Zhenxing Lu Station (振兴路站). The line is 39.182 kilometres (24.3 mi) long, with 28 underground stations.[6]

Line 2

[edit]

Construction for Line 2 began on 26 October 2018. Line 2 is 20.85 km long, with 17 stations. It is opened in 27 December 2023.[7]

Long-term planning

[edit]

In long-term, Nantong Rail Transit will consist of 4 rapid transit lines with a total length of 170.8 kilometres (106.1 mi) and several commuter rail lines totaling 153.2 kilometres (95.2 mi).

References

[edit]
  1. ^ a b "南通轨交1号线将于11月10日开通运营". Archived from the original on 2022-11-08.
  2. ^ a b 迈入地铁时代 引领城市转型. 南通市人民政府 (in Chinese). 2018-01-04. Archived from the original on 2019-12-12. Retrieved 2019-12-12. 2014年8月,国家发改委批复《南通市城市轨道交通近期建设规划(2014-2020年)》
  3. ^ a b 南通市城市轨道交通近期建设规划(2014~2020年) (PDF) (in Chinese). Archived (PDF) from the original on 2019-12-12. Retrieved 2019-12-12 – via cnmn.com.cn. 近期建设方案 建设1号线一期工程和2号线一期工程
  4. ^ Congrong, Ding (2015-12-25). "Nantong Surpasses Goals Set for 12th Five-Year Plan". ChinaDaily.com.cn. Archived from the original on 2018-09-02. Retrieved 2018-09-02.
  5. ^ 南通轨道交通1号线开工建设 一期设28座站点 [Nantong Metro Line 1 construction begins, including 28 subway stations]. 人民网 (in Chinese). 18 December 2017. Archived from the original on 23 December 2017. Retrieved 23 December 2017.
  6. ^ "南通轨道交通1号线一期工程竣工验收". 2022-08-31. Archived from the original on 2022-11-06.
  7. ^ "2号线开通 南通迎来地铁"双线时代"". 360kuai.com (in Chinese). 2023-12-27. Retrieved 2023-12-27.
[edit]

Nantong Metro from UrbanRail.Net