Jump to content

Xiamen Metro

Coordinates: 24°28′47″N 118°04′55″E / 24.479722°N 118.081944°E / 24.479722; 118.081944
From Wikipedia, the free encyclopedia

24°28′47″N 118°04′55″E / 24.479722°N 118.081944°E / 24.479722; 118.081944

Xiamen Metro
AMTR
Overview
OwnerXiamen Rail Transit Construction & Development Group Corporation Limited
LocaleXiamen, Fujian Province, China
Transit typeRapid transit
Number of lines3
Number of stations70
Websitewww.xmgdjt.com.cn
Operation
Began operationDecember 31, 2017; 6 years ago (2017-12-31)
Operator(s)Xiamen Rail Transit Construction & Development Group Corporation Limited
Technical
System length98.4
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Xiamen Metro
Simplified Chinese厦门轨道交通
Traditional Chinese廈門軌道交通
Literal meaningXiamen Rail Transportation
Transcriptions
Standard Mandarin
Hanyu PinyinXiàmén guǐdào jiāotōng
Southern Min
Hokkien POJĒ-mn̂g khuí-tō kau-thong
Commonly abbreviated as
Simplified Chinese厦门地铁
Traditional Chinese廈門地鐵
Literal meaningXiamen Metro
Transcriptions
Standard Mandarin
Hanyu PinyinXiàmén dìtiě
Southern Min
Hokkien POJĒ-mn̂g tē-thih

Xiamen Metro, officially branded as AMTR[1][2] (Amoy Transit Rail,[3][4] or Across Mass Transit Railway[5][6]), is a rapid transit system serving Xiamen, Fujian, China. Line 1 began operation on 31 December 2017.[7] Line 2 began operation on 25 December 2019.[8] Line 3 began operation on 25 June 2021.

Background

[edit]

Planning for a metro system began in the early 2000s, in the meantime the mostly elevated Xiamen BRT opened in 2008.

The initial phase of construction of the metro system was compiled as the Xiamen Urban Rail Transit Construction Plan (2011–2020) on 24 December 2010 and was approved by the National Development and Reform Commission on 11 May 2012.[9][10] The construction started on 13 November 2013.[11] Xiamen Urban Rail Transit Group was founded for the purpose of construction and operation. On 8 October 2016, the National Development and Reform Commission approved phase II of the Xiamen Urban Rail Transit Construction Plan (2016–2022).

The approved phase I metro expansion plan includes three lines (1, 2, 3) with 62 stations, 75.3 kilometres (46.8 mi) in length. The construction cost is projected to be 50.37 billion yuan.[12][13]

The approved phase II metro expansion plan includes four lines (2 Phase II, 3 Phase II, 4, 6) with 67 stations, 152.2 kilometres (94.6 mi) in length. The construction cost is projected to be 100.092 billion yuan.[14][15] The plan was later adjusted to include a Line 3 Southern Extension, which will extend Line 3 further south by 4 stations, 7.35 kilometres (4.57 mi) in length. The construction cost is projected to be 5.769 billion yuan.[16]

In addition, an regional rail system consisting of two lines (Quanzhou–Xiamen–Zhangzhou and Zhangzhou–Gangwei–Xiamen) and 263 kilometres (163 mi) in length was also approved.[17][18]

Network

[edit]
Line Terminals
(District)
Commencement Newest
extension
Length
km
Stations
 1  Zhenhai Road
(Siming)
Yannei
(Jimei)
31 December 2017 30.30 24
 2  Tianzhushan
(Haicang)
Wuyuanwan
(Huli)
25 December 2019 41.64[19] 32
 3  Xiamen Railway Station
(Siming)
Caicuo
(Xiang'an)
25 June 2021 26.5[20] 21
Map of the Xiamen Metro to scale.

Line 1

[edit]
Construction site of Zhenhai Road station, the western terminus of Line 1

Line 1, with 24 stations, 30.3 kilometres (18.8 mi) length, 50 min duration of trip and 20.39 billion yuan cost of construction, was opened on 31 December 2017.[7] The line goes from south to north. The depot is situated at the northern end and is Xiamen Metro's principal depot. The line goes through Xiamen North railway station and connects the island (with 9 stations) and mainland (with 14 stations) parts of the city through a dam (with 1 station). Route: Lundu Ferry Terminal, Old Town, Jimei New Town, Xiamen North Railway Station. Line 1 uses six car CRRC Tangshan rolling stock. Line 1's color is orange.

The view of the platform at Hubin East Road station

Line 2

[edit]

Line 2 is 41.64 kilometres (25.87 mi)[19] in length with 32 stations.[21][22] It was opened on 25 December 2019.[8] It runs from east to west through Xiamen Island and then through Haicang channel to the mainland. Line 2's color is green.

Line 3

[edit]

Line 3 is 26.5 kilometres (16.5 mi)[20] in length with 21 stations that opened on 25 June 2021. It serves the Xiamen Island from southwest to northeast and then crosses over to the mainland.[23] Line 3's color is cyan.

Under construction

[edit]

Line 3 South Extension and Remaining Airport Section

[edit]

Line 3 will ultimately be 45.01 kilometres (27.97 mi) in length with 31 stations, with extensions on both ends of Line 3 currently under construction. A southern extension is 8.29 kilometres (5.15 mi) long with 5 stations,[24] and a remaining 10 kilometer section towards Xiamen's new Xiang'an Airport.

Line 4

[edit]

Line 4 Phase 1 started construction in 2015.[25] It will be 44.8 kilometres (27.8 mi) in length with 12 stations and is scheduled to be complete by 2026.[26] Unlike other lines, which are radial lines that connect Xiamen island to the mainland, Line 4 line is a tangential express line with wide stop spacings and trains running up to 120km/h. The line runs strictly on the mainland around Xiamen Island acting as a suburban arc line. It will connect Xiamen's new Xiang'an Airport to Xiamen North railway station.[25]

Line 6

[edit]

Line 6, after the Jiatong Section became Line 9, is made of three sections: a Xiamen Section, a Zhangzhou Section and a latter additional extension after the removal of the Line 6 Jiatong Section. The three sections total 32.9 kilometres (20.4 mi) in length with 22 stations.[27] Like Line 4, it is a tangential line running strictly on the mainland north of Xiamen Island.

Line 9

[edit]

Line 9 Phase 1 started construction in 2022.[28] It was formerly a section of Line 6 called the Line 6 Jiatong Section but was later split into Line 9 Phase 1.[29][30] The total length of Line 9 Phase 1 is 30.7 kilometres (19.1 mi) kilometers with 17 stations, and runs completely underground.[28][31] The full Line 9 Phase 1 and 2 is 44 kilometres (27 mi) with 24 stations, including 10 transfer stations, with an average station spacing of 1.91 kilometers.[32][33][34]

Future plans

[edit]

Line 4 Phase 2 will extend Line 4 west 14.8 kilometres (9.2 mi) with 5 stations. The project approved as part of the phase II metro expansion plan is planned to start construction in 2025 with a 2028 opening date.[35][36]

A Phase III metro expansion of plan is currently being proposed which will include Phase 1 of Line 5, 7 and 8 Line 8 as well as a Phase 2 extension of Line 9, totalling 88km of new metro line.[37][38][39] All proposed lines will run fully underground. Line 5 Phase 1 is 35km long with 18 stations. Line 7 Phase 1 is 17km long with 13 stations. Line 8 is 18km long with 10 stations. Line 9 Phase 2 will extend Line 9 into Xiamen Island 18 kilometres (11 mi) with 11 stations.[40]

A long term plan, Line 10, spanning 40.4 kilometers (25.1 mi) with 31 stations, is proposed to primarily be reconstructed from the Xiamen BRT. Additionally, Line 4 and Line 10, like Line 1, will intersect at the new central Xiamen North railway station located in Jimei District.[41]

In addition, there are plans to connect the Xiamen Metro with neighboring cities of Zhangzhou and Quanzhou using a new express subway Line R1.[42][43] The plans were approved in 2015 by the NDRC[44]

Network map

[edit]

Map


See also

[edit]

References

[edit]
  1. ^ "Shǒuyè" 首页 [Home]. Xiàmén dìtiě AMTR 厦门地铁AMTR (in Chinese). Archived from the original on 22 June 2021. Retrieved 13 December 2017.
  2. ^ "Xiàmén guǐdào jiāotōng jítuán yǒuxiàn gōngsī". Xiàmén guǐdào jiāotōng jítuán yǒuxiàn gōngsī 厦门轨道交通集团有限公司 (in Chinese). Archived from the original on 15 December 2014. Retrieved 21 August 2016.
  3. ^ "Xiàmén dìtiě logo xuānchuán piàn" 厦门地铁logo宣传片 [Xiamen Metro Logo Promotional Video]. Xiàmén dìtiě AMTR 厦门地铁AMTR (Video) (in Chinese). 27 December 2017. Archived from the original on 26 May 2019. Retrieved 22 May 2019.
  4. ^ "揭秘!那些关于地铁的趣事". Weixin Official Accounts Platform.
  5. ^ "Xiàmén dìtiě Logo xuānchuán piàn" 厦门地铁Logo宣传片. xmgdjt.com.cn (in Chinese). Retrieved 25 May 2024.
  6. ^ ""[Shǒufā] Xiàmén dìtiě Logo xuānchuán piàn" Xiàmén guǐdào jiāotōng jítuán yǒuxiàn gōngsī wēi bó" "【首发】厦门地铁Logo宣传片" 厦门轨道交通集团有限公司微博. weibo.com (in Chinese). Archived from the original on 22 June 2021. Retrieved 15 March 2018.
  7. ^ a b "1 Hào xiàn 31 rì 10 shí kāitōng Xiàmén zhèngshì mài rù dìtiě shídài" 1号线31日10时开通 厦门正式迈入地铁时代. Fènghuáng zīxùn 凤凰资讯 (in Chinese). 28 December 2017. Archived from the original on 30 December 2017. Retrieved 30 December 2017.
  8. ^ a b "Xiàmén dìtiě 2 hào xiàn kāitōng yùnyíng shíjiān qǐdiǎn zhōngdiǎn lùxiàn zhàndiǎn tú wánzhěng bǎn" 厦门地铁2号线开通运营时间 起点终点路线站点图完整版. Mǐnnán wǎng 闽南网 (in Chinese). 20 December 2019. Archived from the original on 20 December 2019. Retrieved 20 December 2019.
  9. ^ "China Approves 25 Urban Rail Projects to Boost Economy". news.xinhuanet.com. 6 September 2012. Archived from the original on 25 November 2012. Retrieved 24 January 2014.
  10. ^ "Xiamen Urban Rail Transit Project Approved by NDRC". whatsonxiamen.com. Archived from the original on 1 February 2014. Retrieved 24 January 2014.
  11. ^ "China's Xiamen Begins Subway Construction". news.xinhuanet.com. 13 November 2013. Archived from the original on 19 February 2014.
  12. ^ "厦门市城市轨道交通近期建设规划通过批准" 中华人民共和国国家发展和改革委员会
  13. ^ "Xiàmén shì chéngshì guǐdào jiāotōng jìnqí jiànshè guīhuà tōngguò pīzhǔn" 厦门市城市轨道交通近期建设规划通过批准. Zhōnghuá rénmín gònghéguó guójiā fāzhǎn hé gǎigé wěiyuánhuì 中华人民共和国国家发展和改革委员会 (in Chinese). 5 September 2012.
  14. ^ "国家发展改革委关于厦门市城市轨道交通第二期建设规划(2016-2022年)的批复" 中华人民共和国国家发展和改革委员会
  15. ^ ""Guójiā fāzhǎn gǎigé wěi guānyú Xiàmén shì chéngshì guǐdào jiāotōng" "dì èr qí jiànshè guīhuà (2016–2022 nián) de pīfù"" "国家发展改革委关于厦门市城市轨道交通" "第二期建设规划(2016–2022年)的批复". Zhōnghuá rénmín gònghéguó guójiā fāzhǎn hé gǎigé wěiyuánhuì 中华人民共和国国家发展和改革委员会 (in Chinese). 8 October 2016. Archived from the original on 13 December 2017. Retrieved 13 December 2017.
  16. ^ "国家发展改革委关于调整厦门市城市轨道交通第二期建设规划(2016-2022年)的批复" 中华人民共和国国家发展和改革委员会
  17. ^ "国家发展改革委关于福建省海峡西岸城际铁路建设规划(2015~2020年)的批复" 中华人民共和国国家发展和改革委员会
  18. ^ ""Guójiā fāzhǎn gǎigé wěi guānyú fújiàn shěng hǎixiá xī'àn chéng jì" "tiělù jiànshè guīhuà (2015~2020 nián) de pīfù"" "国家发展改革委关于福建省海峡西岸城际" "铁路建设规划(2015~2020年)的批复". Zhōnghuá rénmín gònghéguó guójiā fāzhǎn hé gǎigé wěiyuánhuì 中华人民共和国国家发展和改革委员会 (in Chinese). 21 September 2015. Archived from the original on 13 December 2017. Retrieved 13 December 2017.
  19. ^ a b "Xiàmén dìtiě 2 hào xiàn quánxiàn "guǐ tōng"! Yùjì niándǐ qián kāitōng shì yùnyíng" 厦门地铁2号线全线"轨通"!预计年底前开通试运营. news.xmnn.cn (in Chinese). 13 May 2019. Archived from the original on 13 May 2019.
  20. ^ a b "Xiàmén dìtiě 3 hào xiàn 25 rì jiāng kāitōng yùnyíng tóngbù xīn zēng 10 tiáo gōngjiāo jiē bó xiànlù" 厦门地铁3号线25日将开通运营 同步新增10条公交接驳线路. Rénmín wǎng 人民网 (in Chinese). 18 June 2021.
  21. ^ "Xiàmén dìtiě 2 hào xiàn èr qí gōngchéng quánxiàn guàntōng yùjì míngnián 12 yuè tōngchēguò hǎi" 厦门地铁2号线二期工程全线贯通 预计明年12月通车过海. Zhōnghuá wǎng 中华网 (in Chinese). 20 December 2018. Archived from the original on 22 June 2021. Retrieved 16 January 2019.
  22. ^ "Xiàmén "shuāng dìtiě" yào láile kuà dǎo fāzhǎn bùfá gèng wěn gèng kuài" 厦门"双地铁"要来了 跨岛发展步伐更稳更快. Dōngnán wǎng 东南网 (in Chinese). 26 December 2018. Archived from the original on 16 January 2019. Retrieved 16 January 2019.
  23. ^ "Xiàmén dìtiě 3 hào xiàn zài chuán jiébào shǒu gè dùn gòu qūjiān shuāngxiàng guàntōng" 厦门地铁3号线再传捷报 首个盾构区间双向贯通. Dōngnán wǎng 东南网 (in Chinese). 9 December 2018. Archived from the original on 16 January 2019. Retrieved 16 January 2019.
  24. ^ "刚刚!厦门地铁6号线取得重大进展".
  25. ^ a b "Xiàmén dìtiě 4 hào xiàn hòu xī zhì xiáng ān jīchǎng duàn huò pī jiànshè gōngqí 4.5 nián" 厦门地铁4号线后溪至翔安机场段获批 建设工期4.5年. Dōngnán wǎng 东南网 (in Chinese). 11 February 2017. Archived from the original on 16 January 2019. Retrieved 16 January 2019.
  26. ^ "一带四段多节点! 厦门地铁4号线站点提升方案曝光..._机场_建设_景观". www.sohu.com. Retrieved 2 November 2024.
  27. ^ "厦门6号线地铁什么时候通车?厦门地铁6号线地铁站点线路图最新-厦门便民网". m.xmbmw123.com. Retrieved 2 November 2024.
  28. ^ a b "厦门地铁6号线集美至同安段开工_ 民生资讯_福建省人民政府门户网站". www.fujian.gov.cn. Retrieved 2 November 2024.
  29. ^ 腾讯网 (30 July 2024). "地铁6号线集同段建设迎新进展_腾讯新闻". news.qq.com (in Chinese (China)). Retrieved 2 November 2024.
  30. ^ "开工在即!厦门地铁9号线一期(6号线集同段)施工中标公示 总造价74亿元!_工程_土建_嘉庚体育馆". www.sohu.com. Retrieved 2 November 2024.
  31. ^ "厦门地铁6号线迎重大进展,预计2027年通车-厦门楼市吉屋网". xiamen.jiwu.com. Retrieved 2 November 2024.
  32. ^ "厦门地铁9号线即将开工,投405亿,设24个站点,预计2025年12月通车_建设". www.sohu.com. Retrieved 2 April 2022.
  33. ^ "出现了!消失的厦门地铁9/5号线 最新规划终于曝光!-焦点解读-厦门乐居网". xm.leju.com. Retrieved 2 April 2022.
  34. ^ "猛料!厦门再传大利好!重磅方案曝光!全面开挂…_腾讯新闻". new.qq.com. 26 December 2021. Retrieved 2 April 2022.
  35. ^ "厦门地铁4号线二期立项审批!预计2025年建成_马銮湾_新城_线路". www.sohu.com. Retrieved 2 November 2024.
  36. ^ "厦门地铁4号线二期拟明年开工 线路长14.8公里 - 城事 - 东南网厦门频道". xm.fjsen.com. Retrieved 2 November 2024.
  37. ^ "厦门地铁第三期建设规划(2023-2028)环评公示-资讯-隧道网". m.tunnelling.cn. Retrieved 2 November 2024.
  38. ^ "厦门地铁第三期建设规划环评公示 涉及5、7、8、9号线路 _新闻频道_厦门网". news.xmnn.cn. Retrieved 2 November 2024.
  39. ^ "厦门市城市轨道交通第三期建设规划(2023-2028)环评公示_环评公示_焦点_轨道交通网-新轨网". www.rail-transit.com. Retrieved 2 November 2024.
  40. ^ "厦门地铁9号线最新消息(开通时间+站点+线路图) - 漫漫看厦门". xiamen.manmankan.com. Retrieved 2 November 2024.
  41. ^ "Xiàmén běi zhàn xiàn dìtiě biāoshì pái gōngzuò rényuán chēng jiāng qīng" 厦门北站现地铁标示牌 工作人员称将清. xmnn.cn (in Chinese). 4 November 2011. Archived from the original on 2 June 2012.
  42. ^ "【关于福建省海峡西岸城际铁路建设规划(2015~2020年)的批复(发改基础〔2015〕2123号)】-国家发展和改革委员会". www.ndrc.gov.cn. Retrieved 6 February 2022.
  43. ^ "泉州晚报数字报·泉州网". szb.qzwb.com. Retrieved 6 February 2022.
  44. ^ "【关于福建省海峡西岸城际铁路建设规划(2015~2020年)的批复(发改基础〔2015〕2123号)】-国家发展和改革委员会". www.ndrc.gov.cn. Retrieved 6 February 2022.
[edit]