Line 5 (Suzhou Rail Transit)
Appearance
Line 5 | |
---|---|
Overview | |
Status | Operational |
Owner | Suzhou Rail Transit Co., Ltd |
Termini | |
Stations | 34 |
Service | |
Type | Rapid transit |
System | Suzhou Rail Transit |
Operator(s) | Suzhou Rail Transit Co., Ltd |
History | |
Opened | 29 June 2021 |
Technical | |
Line length | 44.1 km (27.4 mi)[1] |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Line 5 is a southwest–northeast line of Suzhou Rail Transit. It opened on June 29, 2021. The line is 44.1 kilometers long.[1] Its south-western terminus is at Taihu Xiangshan station[2] in Wuzhong District, with its north-eastern terminus at Yangchenghu South station[2] in Suzhou Industrial Park.[3]
50 six-car Class B fully automated subway trains were ordered for the line.[4]
Stations
[edit]Station name[2] | Connections | Distance km |
Location | |||
---|---|---|---|---|---|---|
English | Chinese | |||||
Taihu Xiangshan | 太湖香山 | 0.00 | 0.00 | Wuzhong | ||
Huadun | 花墩 | |||||
Jinqiao | 津桥 | |||||
Xukou | 胥口 | |||||
Maopenglu East | 茅蓬路东 | |||||
Xujiaqiao | 许家桥 | |||||
Lingyanshan | 灵岩山 | |||||
Duchuanqiao | 渎川桥 | |||||
Dazhiqiao | 大治桥 | |||||
Xikuatang | 西跨塘 | |||||
Shicheng | 石城 | Huqiu | ||||
Luoxingqiao | 落星桥 | |||||
Suoshanqiao West | 索山桥西 | 3 | ||||
Shuangqiao | 双桥 | Gusu | ||||
Laodonglu | 劳动路 | 2 | ||||
Xinshiqiao | 新市桥 | |||||
Nanmen | 南门 | 4 | ||||
Nanyuanbeilu | 南园北路 | |||||
Zhuhuiqiao | 竹辉桥 | |||||
Hehuadang | 荷花荡 | SIP | ||||
Huangtiandang | 黄天荡 | 7 | ||||
Jinsheqiao | 金厍桥 | 3 | ||||
Xingbojie | 星波街 | |||||
Ligongdi South | 李公堤南 | |||||
Jinhu | 金湖 | |||||
Hualian | 华莲 | |||||
Xietang | 斜塘 | 8 | ||||
Suzhou Olympic Sports Centre | 苏州奥体中心 | 6 | ||||
Fangzhougongyuan | 方洲公园 | |||||
Xingtangjie | 星塘街 | 1 | ||||
Longdun | 龙墩 | |||||
Dongshahu | 东沙湖 | |||||
Fengtingdadao | 葑亭大道 | 3 | ||||
Yangchenghu South | 阳澄湖南 | |||||
Rolling stock
[edit]Fleet numbers | Year Built | Time in service | Builder | Class | Number in service | No of car |
Assembly | Rolling stock | Number | Depots | Line assigned | Notes |
---|---|---|---|---|---|---|---|---|---|---|---|---|
300 (50 sets) | 2019-2021 | 2021-present | CRRC Nanjing Puzhen | B | 300 (50 sets) | 6 | Tc+Mp+M - M + Mp+Tc | PM142 | 050101-055006 (0501-0550) | Xukou Depot North Weiting Yard |
5 |
References
[edit]- ^ a b "苏州轨交5号获批复 全长44.1公里". 2015-07-31.
- ^ a b c "这条明年开通的轨交线,站点名定了!". Retrieved 2021-01-21.
- ^ "The introduction of Suzhou Rail Transit stations" (in Chinese). Suzhou Rail Transit Co., Ltd. Archived from the original on 2012-07-13. Retrieved 2012-06-29.
- ^ "江苏首个全自动驾驶!苏州轨道交通5号线首列车今天下线". 2019-09-18.