Line 4 (Mumbai Metro)

From Wikipedia, the free encyclopedia

Mumbai Metro Green Line 4
Overview
Status
  • Line 4 (under construction)
  • Line 4A (under construction)[1]
OwnerMMRDA
Line number4
LocaleMumbai and Thane, Maharashtra, India
Termini
Stations32 + 2 extended 34
WebsiteLine 4
Service
TypeRapid Transit
SystemMumbai Metro
Operator(s)MMRDA
Depot(s)Mogharpada
History
Planned openingDecember 2025; 1 year's time (2025-12)[2]
Technical
Line length32.32 km (Line 4)
2.7 km (Line 4A)
Number of tracks2
CharacterElevated
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Operating speed90 km/h (56 mph)
Highest elevation3.90 m (12.8 ft)
Route map

Line 4
to Line 10
0.0000
Gaimukh
Mogharpada Depot
1.2830
Gowniwada
2.6679
Kasarvadavali
3.7414
Vijay Garden
4.6502
Dongripada
6.1158
Tikuji-ni-wadi
6.8914
Manpada (Thane)
7.7567
Kapurbawdi on Line 5
9.1459
Majiwada
9.9701
Cadbury Junction
10.7628
Mahapalika Marg
11.7987
RTO Thane
12.4772
Teen Haath Naka (Thane)
13.7135
Mulund Naka
15.0615
Mulund Fire Station
16.1744
Sonapur
17.5651
Shangrila
18.4087
Bhandup Central line
19.4575
Bhandup Mahapalika
20.2368
Naval Housing
20.9286
Gandhi Nagar (Kanjurmarg)
Kanjurmarg on
Central line
Kanjurmarg (West) on Line 3 and Line 6
21.9307
Surya Nagar
22.9354
Vikhroli
23.6585
Godrej Company
24.8213
Shreyas Cinema
Central line
25.4421
Laxmi Nagar
26.5196
Pant Nagar
28.1522
Garodia Nagar
28.7507
Amar Mahal Junction
Santacruz–Chembur Link Road
Harbour line
30.0942
Siddharth Colony
Line 2
31.1486
Suman Nagar
Kurla–Mahul BP Refinery line
32.2269
Anik Nagar Bus Depot
33.0885
Wadala Truck Terminal
34.0885
Bhakti Park (Wadala)
on Line 1 (Mumbai Monorail)
to Line 11

Line 4 (Green Line) is an under construction rapid transit metro line of the Mumbai Metro in the city of Mumbai, Maharashtra, India.

The Mumbai Metropolitan Region Development Authority (MMRDA) and a consortium of international companies are developing the line.[3]

The 32.32 km (20.08 mi) line is planned to be fully elevated, and is expected to consist of 32 stations from Wadala (Mumbai) to Kasarvadavali (Ghodbunder road, Thane) via Chembur, Bhandup Mulund and Teen Hath Naka, a popular traffic crossing in Thane. It is estimated to cost ₹14,549 crore.[4] Its construction was expected to begin by June 2018.

Alstom was initially chosen to provide rolling stock for the line, but the contract was cancelled in 2022.[5][6]

Planning

[edit]

In June 2015, the Mumbai Metropolitan Region Development Authority (MMRDA) proposed building a 32 km Wadala-Thane-Kasarvadavali metro line as part of a plan to build six new metro lines at a total estimated cost of 64,000 crore (US$7.7 billion).[7] Line 4 was approved in June 2016,[8] and was estimated to cost 14,549 crore (US$1.7 billion).[9]

The foundation stone for Metro 4 was laid by Prime Minister Narendra Modi on 24 December 2016.[10] The Maharashtra Coastal Zone Management Authority granted Coastal Regulation Zone (CRZ) clearance to the project in February 2017. Over 1 km (0.62 mi) of the line passes over water bodies in Bhakti Park and Wadala, both areas classified as CRZ II, where regulations limit construction activities. A total of 48 piers are proposed to be built in the CRZ II zone. The MMRDA proposed building metro car depots for the line on a 30 hectare plot at Owala village in Thane district and another in Vikhroli.[11] The agency stated that the line would require two depots due to its length.[12]

The MMRDA used a drone to carry out survey work for Metro 4. The drones were fitted with 360 degrees camera that provide up to 3 millimetres (0.12 in) accuracy. The aerial survey takes less time than a regular survey, achieves greater accuracy and helps protect against false claims for compensation.[13] In February 2017, the MMRDA said it was studying the feasibility of extending the corridor from Kasarvadavali to Gaimukh.[14] In March 2017, the agency said that it was conducting a pre-feasbility study on extending the line from Wadala to Mumbai General Post Office in South Mumbai, via the Mumbai Port Trust. The proposed 8 km (5.0 mi) extension is estimated to cost 300 crore per kilometer.[15][16] The extension from Kasarvadavli to Gaimukh was approved by Fadnavis at the 144th meeting of the MMRDA on 12 January 2018. The 2.7 km extension is estimated to cost 949 crore (US$110 million).[17][18]

The MMRDA appointed Systra MVA Consulting India Pvt. Ltd. as the detail design consultants for Line 4 on 9 November 2017.[19] A consortium of DB Engineering, Louis Berger and Hill International was awarded a project management and construction management services contract for the Metro 4 project in April 2018.[20][21] In October 2018, the MMRDA announced that it would construct Metro 4 along with three flyovers to minimize traffic disruption, with the metro running on the upper deck of the flyover. The three flyovers will be built at Bhayander Pada, Kasarvadavli and Anandnagar near Ghodbunder.[22][23]

In May 2019, MMRDA Metropolitan Commissioner R.A. Rajeev announced a modified plan to use Siddharth Colony as the interchange station with Line 2. The original plan had proposed to use the Eastern Express Highway station on Line 2B and Siddharth Colony on Line 4 as the interchange stations. However, the two stations are approximately 480 metres away from Siddharth Colony and the change was made to simplify passenger transfers.[24]

Depot

[edit]

The MMRDA considered plots in Wadala, Aarey Colony and Gaimukh Nagar in Thane to build a depot for the line.[25] On 16 October 2023, the state urban development allotted a 174 hectare (435 acre) plot of land at Mogharpada in Thane to the MMRDA at no cost. Nine hectares of the plot is reserved for use by the BMC for the Coastal Road and a further 29 hectares is protected mangrove land. The MMRDA will utilize a portion of the remaining plot to build a depot that serves Lines 4, 10 and 11. The land left over after building the depot is zoned for residential and commercial use.[26][27]

Construction

[edit]
A construction barricade along the Line 4 route

The MMRDA invited bids for civil work on the corridor on 4 January 2017.[28][29][30] The tenders for construction of viaducts and stations were divided into five packages - Wadala to Amar Mahal Junction, Garodia Nagar to Surya Nagar, Gandhi Nagar to Sonapur, Mulund Fire Station to Majiwada and Kapurbawdi to Kasarvadavali.[31][32] Metro 4 was tendered alongside Metro 2B. L&T, Afcons Infrastructure, Tata, NCC and JMC, Reliance Infrastructure-RdE, JKumar Group, ITD Cementation, CHEC-TPL bid for packages on both Metro 2B and Metro 4. A total of 10 firms and/or consortia submitted bids for the two lines, two of whom (Simplex Infrastructure and a consortium of GHEC-RCC-JV-China) bid exclusively for Metro 2B packages.[33][34]

The construction work was awarded through the engineering, procurement and construction (EPC) model in April 2018. A joint venture between Reliance Infrastructure and Italian firm Astaldi S.p.A. was awarded three packages between Kasarwadavali and Wadala worth 1,584 crore (US$190 million).[35] The contract for the remaining two packages, worth a combined 1,048 crore (US$130 million), was awarded to a joint venture between Tata Projects Limited and China Harbour Engineering Company.[36] The civil work was expected to be completed in 30 months.[37] Construction began in October 2018.[38] About 80% of soil-investigation works and 66% of utility works had been completed by 3 June 2019.[39]

In September 2019, the MMRDA awarded a 342 crore (US$41 million) contract to J Kumar Infraprojects to build the viaduct and two stations for the Metro 4A extension from Kasarvadavli to Gaimukh.[40][41] In August 2020, the Bombay High Court granted the MMRDA permission to carry out construction in a mangrove buffer zone.[42] Survey work on the land for a depot at Mogharpada began in January 2022.[43]

The MMRDA stated that 37% of total work on Lines 4 and 4A had been completed by June 2022. The agency stated that 43.44% of viaducts and 25.20% of work on stations on Line 4 had been completed. On Line 4A, 39.03% of viaducts and 19.82% of work on stations was completed.[44] By November 2022, 41% of civil works on Line 4 and 45% of work on Line 4A had been completed.[45][46]

The Bombay High Court dismissed two petitions filed by Indo Nippon Chemical Co. Ltd. and Shree Yashwant Co-operative Housing Society Ltd. challenging the alignment for Line 4 in March 2023.[47] In September 2023, the MMRDA awarded a 905 crore (US$110 million) contract to a joint venture between SEW Infrastructure and Vishwa Samudra Engineering to build the depot at Mogharpada. It also awarded a 121 crore (US$14 million) to Apurvakriti Infrastructure Pvt Ltd. lay ballastless railway tracks connecting Mulund Fire Station with Gaimukh and the depot.[48]

Sl No. Package Contractor(s)
1 Wadala to Amar Mahal

(6.2 km Viaduct & 6 Stations)

Reliance-Astaldi JV
2 Garodia Nagar-Surya Nagar

(6.4 km Viaduct & 7 Stations)

TPL-CHEC JV
3 Gandhi Nagar-Sonapur

(6.7 km Viaduct & 6 Stations)

Reliance-Astaldi JV
4 Mulund Fire Station-Majiwada

(7.1 km Viaduct & 7 Stations)

TPL-CHEC JV
5 Kapurbawdi-Kasarvadavali

(6.8 km Viaduct & 6 Stations)

Reliance-Astaldi JV
6 Kasarvadavali to Gaimukh

(2.7 km Viaduct & 2 Stations)

J Kumar Infraprojects Limited

Current status

[edit]
Status as of 21 May 2023 [49]
Sr. No. Name of Work Current Status
1 Pile 89.2%
2 Pile Cap 74.8%
3 Pier(Viaduct+Station up to CL) 64.9%
4 Anti Crash Barrier 56.3%
5 Road Restoration 30.2%
6 Pier Cap Casting 73.6%
7 Pier Cap Erection 67.6%
8 Stitch Concrete 66.7%
9 Stressing 58.8%
10 Bearing Pedestal 56.1%
11 U-Girder Casting for Viaduct 73.1%
12 U-Girder Erection for Viaduct 61.4%
13 I-Girder Casting for Viaduct 27.1%
14 I-Girder Erection for Viaduct 25.5%
15 Deck Slab Over I Girder 25.9%
16 U Girder Casting For Station 37.2%
17 U Girder Erection For Station 31.3%
18 Cast in Situ Pier Head for Station (Concourse level) 59.4%
19 Concourse Level Pier Arm Casting 57.4%
20 Concourse Level Pier Arm Erection 39.8%
21 Platform Level Pier Arm Casting 57.5%
22 Platform Level Pier Arm Erection 50.2%
23 Station L Girder Casting 29.3%
24 Station L Girder Erection 27.0%
25 Station T Girder Casting 36.5%
26 Station T Girder Erection 30.3%
27 Platform Level RCC Beam Casting 29.2%

Green Line 4

[edit]

On 12 April 2023, MMRDA in press release stated that Green Line 4 project status is 49%.[50]

Green Line 4A

[edit]

On 30 December 2022, MMRDA in press release stated that Green Line 4A project status is 45%.[51]

History of Previous Works and Status
Sr. No. Name of Work Description Status as of[49]
21 May 2019 4 July 2019 6 August 2019 21 October 2019 29 November 2019 29 January 2020 8 September 2020 1 January 2021 1 March 2021 31 May 2021 28 July 2021 18 April 2022 30 June 2022 1 September 2022
1 Soil Investigation Works Soil Investigation Work For Pier Foundation Completed 78% 81.0% 82.0% 83.0% 85% 87% 90% 93.20% 90%
2 Utility Works Works Completed 64% 68.2% 70% 71.36% 76% 85% 86%
3 Piling Works Piling Work For

Foundations Completed

17% 22.7% 25.25% 33% 37% 42.56% 55.15% 62.40% 65% 66% 67.78% 65% 69% 69%
4 Pile Cap Works Pile Cap Work Completed 6.5% 12.4% 14.7% 18.60% 21% 24.75% 35.68% 44.85% 49% 52% 51.73% 51.91% 54% 54%
5 Pier Works Piers Cast 3.5% 8.0% 10.2% 15.70% 18.3% 29.23% 29.29% 38.16% 42% 45% 45.92% 46.80% 49%
6 Pier Cap Works Pier Caps Cast Nil Casting of Pier Cap is started

at casting yard and 0.063% casting completed till June 2019

Casting of Pier Cap is started

at casting yard and 0.068% casting completed till July 2019

6% Casting completed. 10% 17.98% 28.99% 40.59% 43% 46% 49.73% 49.36% 51% 57.19%
Pier Caps Erected Nil 0.80% Erection completed. 2.4% 23.34% 23.81% 31.33% 36% 39% 42.65% 45.06% 46% 46.92%
7 Cast-in-situ Pier Cap Nil 89% 89.19%
8 U Girder Casting Casting yard works are in progress Nil Casting of U Girder started

at casting yard and 0.21% casting completed till June 2019

Casting of U Girder started

at casting yard and 0.41% casting completed till July 2019

2.33% 6% 11.83% 20.09% 33.19% 38% 45% 38.13% 38.71% 40% 43.68%
U Girder Erected Nil 0.9% 15.69% 29.97% 24% 31% 26.27% 27.86% 32% 36.63%
9 I Girder Casting Nil 8.83% 19.09% 21% 24.98%
10 I Girder Erection Nil 17.21% 19% 22.42%
11 Desk Slab Nil 14.58% 18% 21.20%
12 Station work Station work in progress Pile Foundation works Started since last month Works are in Progress
Station Pier Head Nil 37% 40.96%
Stn Pier up to Platform level Nil 35% 40.96%
13 Concourse Pier Arm Casting Nil 40% 43.86%
14 Concourse Pier Arm Erection Nil 35% 40.94%
15 Platform Pier Arm Casting Nil 27% 33.97%
16 Platform Pier Arm Erection Nil 24% 30.79%
17 L Girder Casting Nil 11% 15.03%
18 L Girder Erection Nil 3% 4.67%
19 T Girder Casting Nil 15% 20.67%
20 T Girder Erection Nil 15% 23.77%
21 Platform Girder Casting Nil 8% 13.31%

Stations

[edit]

32 stations are being planned on Line 4. Most of them were either in the stage of planning or under early stages of construction (as of November 2018) [52]

2 stations are being planned on Line 4A. Connected to word Gaimukh to Kasarvadavali also connect Metro 10.

Green Line 4
# Station Name Status Connections Layout
English Marathi
1 Gaimukh गायमुख Under Construction Line 10 (Planned) Elevated
2 Gowniwada गोवनीवाडा Under Construction None Elevated
3 Kasarvadavali कासारवडवली Under Construction None Elevated
4 Vijay Gardens विजय गार्डन Under Construction None Elevated
5 Hiranandani Estate हीरानंदानी एस्टेट Under Construction None Elevated
6 Stretford Avenue स्ट्रेटफर्ड ॲव्हेन्यू Under Construction None Elevated
7 Manpada (Thane) मानपाडा Under Construction None Elevated
8 Kapurbawdi कापूरबावडी Under Construction Line 5 (Under Construction) Elevated
9 Majiwada माजिवाडा Under Construction None Elevated
10 Cadbury Junction कॅडबरी जंक्शन Under Construction None Elevated
11 Mahapalika Marg महापालिका मार्ग Under Construction None Elevated
12 Thane RTO आरटीओ ठाणे Under Construction None Elevated
13 Teen Haath Naka, Thane तीन हात नाका (ठाणे) Under Construction None Elevated
14 Mulund Naka मुलुंड नाका Under Construction None Elevated
15 Mulund Fire Station मुलुंड अग्निशमन केंद्र Under Construction None Elevated
16 Sonapur सोनापूर Under Construction None Elevated
17 Shangrila शांग्रीला Under Construction None Elevated
18 Bhandup भांडुप Under Construction None Elevated
19 Bhandup Mahapalika भांडुप महापालिका Under Construction None Elevated
20 Naval Housing नौदल गृहनिर्माण Under Construction None Elevated
21 Gandhi Nagar (Kanjurmarg) गांधी नगर (कांजूरमार्ग) Under Construction Line 6 (Under Construction) Elevated
22 Surya Nagar सूर्य नगर Under Construction None Elevated
23 Vikhroli विक्रोळी Under Construction None Elevated
24 Godrej Company गोदरेज कंपनी Under Construction None Elevated
25 Shreyas Cinema श्रेयस सिनेमा Under Construction None Elevated
26 Laxmi Nagar (Ghatkopar) लक्ष्मी नगर (घाटकोपर) Under Construction None Elevated
27 Pant Nagar पंत नगर Under Construction None Elevated
28 Garodia Nagar गरोडिया नगर Under Construction None Elevated
29 Amar Mahal Junction अमर महाल जंक्शन To be removed None Elevated
30 Siddharth Colony सिध्दार्थ कॉलनी Under Construction Line 2 (Under Construction) Elevated
31 Suman Nagar सुमन नगर To be removed None Elevated
32 Anik Nagar Bus Depot अणिक नगर बस आगार Under Construction None Elevated
33 Wadala Truck Terminal वडाळा ट्रक टर्मिनल Under Construction None Elevated
34 Bhakti Park (Wadala) भक्ति पार्क (वडाळा) Under Construction Line 1 (Mumbai Monorail)
Line 11 (Planned)
Elevated

Cost

[edit]

Line 4 is estimated to cost 14,549 crore (US$1.7 billion),[53] and Line 4A is estimated to cost 949 crore (US$110 million).[18] The Maharashtra Government signed an EUR545 million (₹4,000 crore) loan agreement with German development bank KfW to fund construction of Metro 4 and 4A in November 2020.[54]

Infrastructure

[edit]

Rolling stock

[edit]

The MMRDA awarded a 1,854 crore (US$220 million) contract to Alstom to supply 234 metro coaches for Line 4 and 4A in March 2021.[55] This was Alstom's first order after acquiring Bombardier Transportation in January 2021.[56][57] However, the company cancelled the order in March 2022 citing delays in completing the project.[58]

Depot

[edit]

The depot for the line is located at Mogharpada in Thane. It will also serve as the depot for Line 10 and Line 11. The depot has a maximum capacity for 64 stabling lines, half of which are reserved for future use, in addition to 10 inspection bays lines and 10 workshop lines. The depot also houses the operational control centre, administrative building, maintenance and workshop building, auxiliary substation, and staff quarters.[48]

Pocket track

[edit]

The Bhakti Park station will have a pocket track to enable trains to park off the main line. Line 4's depot at Mogharpada also serves Line 10 and Line 11 which creates the possibility of trains having to run without passengers from the depot to Chhatrapati Shivaji Terminus during morning hours. The pocket track enables trains to park off the main line without traveling to the last station on the line.[59]

References

[edit]
  1. ^ "Mumbai Metro 4A". Archived from the original on 26 November 2018. Retrieved 26 November 2018.
  2. ^ "Mumbai: Metro Lines 2A & 7 likely to be fully opened on August 15 | Mumbai News - Times of India".
  3. ^ "Mumbai Metro Line 4". www.mmrda.maharashtra.gov.in. MMRDA official website. Archived from the original on 1 August 2018. Retrieved 15 November 2018.
  4. ^ "Everything you need to know about Metro 2B and Metro 4 | Free Press Journal". Free Press Journal. Archived from the original on 12 February 2017. Retrieved 12 February 2017.
  5. ^ "Alstom terminates Mumbai Line 4 fleet contract". 10 March 2022. Retrieved 6 April 2022.
  6. ^ "Alstom cancels order bagged from MMRDA for supply of coaches for Mumbai Metro 4". 4 March 2022. Retrieved 6 April 2022.
  7. ^ "Over 130 km of Metro lines to criss-cross city by 2020". The Indian Express. 16 June 2015. Retrieved 9 July 2023.
  8. ^ "Maharashtra Cabinet Gives Go-Ahead For Two Metro Lines". NDTV.com. Archived from the original on 18 October 2016. Retrieved 14 October 2016.
  9. ^ "Mumbai to get two more Metro Rails". Business Standard India. 27 September 2016. Archived from the original on 18 October 2016. Retrieved 14 October 2016.
  10. ^ "MMRDA invites civil work bids for two Metro projects". The Times of India. Archived from the original on 12 February 2017. Retrieved 10 February 2017.
  11. ^ "Wadala-Thane metro line clears CRZ hurdle - Mumbai Mirror -". Mumbai Mirror. Archived from the original on 28 February 2017. Retrieved 27 February 2017.
  12. ^ "Mumbai: MMRDA to acquire private land in Thane for Metro 4 car shed". The Indian Express. 11 November 2018. Retrieved 10 July 2023.
  13. ^ "MMRDA plans drone survey for other Metro lines". The Indian Express. 7 March 2017. Archived from the original on 7 March 2017. Retrieved 7 March 2017.
  14. ^ "Mumbai Metro Phase 4 may cover entire Ghodbunder Road stretch in Thane". Hindustan Times. 2 February 2017. Retrieved 10 July 2023.
  15. ^ "MMRDA plans to extend Metro-IV route from Wadala to GPO". The Times of India. Archived from the original on 16 March 2017. Retrieved 17 March 2017.
  16. ^ "Mumbai Metro's Thane-Wadala line likely to be extended to CST/GPO | Latest News & Updates at Daily News & Analysis". dna. 16 March 2017. Archived from the original on 17 March 2017. Retrieved 17 March 2017.
  17. ^ "Mumbai Metro 4 will now reach Thane's Ghodbunder Road". Hindustan Times. 12 January 2018. Retrieved 10 July 2023.
  18. ^ a b "Kasarvadavali-Gaikmukh metro project in Thane approved". Mumbai Mirror. 27 December 2018. Retrieved 10 July 2023.
  19. ^ "MMRDA's Executive Committee Meeting held today Contractors, consultants appointed for MTHL, Metro-4, Wadala Truck Terminal and flyover on NH-4". MMRDA. 9 November 2017. Retrieved 10 July 2023.
  20. ^ Berger, Louis. "Louis Berger awarded Mumbai Metro Line 4 contract in India". GlobeNewswire News Room. Archived from the original on 9 October 2018. Retrieved 9 October 2018.
  21. ^ "DB Engineering-Louis Berger bags contract for Mumbai Metro 4". dna. 10 April 2018. Archived from the original on 9 October 2018. Retrieved 9 October 2018.
  22. ^ "Metro-4, 9 to be built along with flyovers". The Asian Age. 1 October 2018. Archived from the original on 9 October 2018. Retrieved 9 October 2018.
  23. ^ "Mumbai: MMRDA to build Metro 4 & 9 corridors along with flyovers". Free Press Journal. 4 October 2018. Archived from the original on 9 October 2018. Retrieved 9 October 2018.
  24. ^ Naik, Yogesh (21 May 2019). "MMRDA redrafts plans for better connectivity between Mumbai Metro corridors". Mumbai Mirror. Archived from the original on 6 June 2019. Retrieved 6 June 2019.
  25. ^ "Mumbai: MMRDA to acquire private land in Thane for Metro 4 car shed". The Indian Express. 11 November 2018. Retrieved 10 July 2023.
  26. ^ "Integrated Metro car shed on 435 acres at Thane for Metro Line 4, 4A, 10 & 11". The Times of India. 16 October 2023. ISSN 0971-8257. Retrieved 4 November 2023.
  27. ^ "One car shed for 4 Metro lines to come up in Thane". The Times of India. 17 October 2023. ISSN 0971-8257. Retrieved 4 November 2023.
  28. ^ "MMRDA invites bids for 2 metro projects". dna. 5 January 2017. Archived from the original on 8 January 2017. Retrieved 10 February 2017.
  29. ^ "MMRDA invites tenders for design, construction of stations, viaducts for new Metro routes". The Indian Express. 5 January 2017. Archived from the original on 11 February 2017. Retrieved 10 February 2017.
  30. ^ "Racing against 2021 deadline, Maharashtra opens bids for two more Metro lines". Hindustan Times. 5 January 2017. Archived from the original on 11 February 2017. Retrieved 10 February 2017.
  31. ^ Correspondent, Special. "MMRDA invites tenders for Metro-2B and 4". The Hindu. Archived from the original on 6 January 2017. Retrieved 12 February 2017. {{cite web}}: |last1= has generic name (help)
  32. ^ "Mumbai commute to get faster, firms queue up to build two more Metro lines". Hindustan Times. 13 May 2017. Archived from the original on 14 May 2017. Retrieved 13 May 2017.
  33. ^ "MMRDA receives interest from domestic, foreign firms for metro". India Today. Archived from the original on 14 June 2017. Retrieved 13 May 2017.
  34. ^ "R Infra, 10 others bid for Metro-2B, Metro-4 corridors". Asian Age. 13 May 2017. Archived from the original on 24 May 2017. Retrieved 13 May 2017.
  35. ^ "Reliance Infra bags three packages of Mumbai Metro Line 4". The Economic Times. 13 April 2018. Archived from the original on 9 October 2018. Retrieved 9 October 2018.
  36. ^ "Tata Projects bag Rs 1,048 crore Mumbai Metro packages". The Economic Times. 13 April 2018. Archived from the original on 9 October 2018. Retrieved 9 October 2018.
  37. ^ Pillay, Amritha (14 April 2018). "Reliance Infrastructure, Tata Projects win bids for Mumbai Metro project". Business Standard India. Archived from the original on 9 August 2018. Retrieved 9 August 2018.
  38. ^ "Metro Lines 4, 5 connecting Thane to different cities to be completed only by 2025, says MMRDA official". Hindustan Times. 3 June 2022. Retrieved 10 July 2023.
  39. ^ "Metro lines 4 and 5 to be linked at station in Thane". Hindustan Times. 17 June 2019. Retrieved 10 July 2023.
  40. ^ "Contractor for Metro 4A named". The Times of India. 10 September 2019. ISSN 0971-8257. Retrieved 10 July 2023.
  41. ^ "Mumbai Metro 4A bags civil contracts". Archived from the original on 13 October 2019. Retrieved 30 November 2020.
  42. ^ "High Court gives nod for Metro Line 4 in Mumbai's mangrove buffer zone". Business Standard. Retrieved 10 July 2023.
  43. ^ "Hurdles for Wadala to Thane Metro Line 4 cleared; survey of car shed land begins". Hindustan Times. 28 January 2022. Retrieved 10 July 2023.
  44. ^ "Four years on, Mumbai-Thane Metro Line 4 still only 37% complete". Free Press Journal. Retrieved 10 July 2023.
  45. ^ "Mumbai: Here is latest update of more than dozen Metro projects in the city". Free Press Journal. Retrieved 10 July 2023.
  46. ^ "State of the Mumbai Metro: 14 lines in the works, two nearing completion". The Indian Express. 4 November 2022. Retrieved 10 July 2023.
  47. ^ "Mumbai: Bombay HC dismisses plea challenging Metro Line 4". Free Press Journal. Retrieved 4 November 2023.
  48. ^ a b "Mum-Thane Metro depot construction: Contractor appointed". The Times of India. 27 September 2023. ISSN 0971-8257. Retrieved 4 November 2023.
  49. ^ a b "Mumbai Metropolitan Region Development Authority - Metro Line - 4". Mmrda.maharashtra.gov.in. 28 July 2021. Archived from the original on 5 October 2017. Retrieved 3 June 2023.
  50. ^ "Metro line 4 achieves 49% Physical Work Completion". 12 April 2023. Retrieved 14 May 2023.
  51. ^ "MMRDA Press Release 30th December 2022" (in Marathi). 30 December 2022. Retrieved 20 April 2023.
  52. ^ "Mumbai Metro 4 – Wadala–Ghatkopar-Mulund–Teen Hath Naka–Kasarvadavali Station". Archived from the original on 5 October 2017. Retrieved 7 June 2017.
  53. ^ "Non-confirmation of depot land: Fate of 3 new Mumbai Metro lines hangs in balance". The Indian Express. 8 February 2023. Retrieved 10 July 2023.
  54. ^ "German bank extends credit line for 2 lines of Mumbai Metro". The Indian Express. 7 November 2020. Retrieved 10 July 2023.
  55. ^ "Alstom to make 39 rakes for Metro 4, 4A for Rs 2k cr in Mumbai". The Times of India. 31 March 2021. ISSN 0971-8257. Retrieved 10 July 2023.
  56. ^ "Alstom wins €220-million contract to manufacture 234 metro cars for Mumbai Metro Lines 4, 4A". www.thehindubusinessline.com. 30 March 2021. Retrieved 10 July 2023.
  57. ^ "Mumbai Metro-4 coaches: Bombardier lowest bidder, Chinese manufacturer 'non-responsive'". Hindustan Times. 19 January 2021. Retrieved 10 July 2023.
  58. ^ "Alstom cancels order bagged from MMRDA for supply of coaches for Mumbai Metro 4". Moneycontrol. 4 March 2022. Retrieved 10 July 2023.
  59. ^ "MMRDA to construct pocket track at Mumbai's Bhakti Park Metro Line 4 station". The Indian Express. 17 March 2023. Retrieved 4 November 2023.