Line 10 (Mumbai Metro)
Mumbai Metro Green Line 10 Extension | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Overview | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Other name(s) | Versova To Shivaji Chowk (Mira Road) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Status | Approved | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Owner | MMRDA | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Line number | Metro Line 10 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Locale | Western Suburbs | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Termini |
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Stations | 4 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Service | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Type | Rapid Transit | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
System | Mumbai Metro | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operator(s) | Mumbai Metro | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Depot(s) | Owale & Gaimukh | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Daily ridership | 2028 0.9 million 2031 1.4 million | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
History | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Planned opening | 2028 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Technical | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Line length | 9.2 km (5.7 mi) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Number of tracks | 2 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Character | Elevated | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operating speed | 90 km/h (56 mph) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Highest elevation | 3.90 m (12.8 ft) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Green Line 10 (extension) of the Mumbai Metro, also referred to as the Gaimukh-Shivaji Chowk (Mira Road) corridor, is part of the metro system for the city of Mumbai, India. This line is fully elevated.
In February 2017, the MMRDA announced that the DMRC was preparing a detailed project report (DPR) on Metro 10. Preliminary plans were prepared jointly by MMRDA and DMRC. The line will run parallel to Thane - Bhayandar Highway, and will join metro route no 9 at Chhatrapati Shivaji Maharaj Chowk. The project is estimated to cost ₹3,600 crore (US$530 million).[1][2][3]
Prime Minister Narendra Modi in Mumbai on September 7 laid the foundation stone of Mumbai Metro Lines 10 the 9.2 km (5.7 mi) long Gaimukh to Shivaji Chowk (Mira Road) Metro-10.It is expected to be completed in 2028 and is expected to provide interconnectivity among Mira-Bhayander, Thane, Borivali and rest of Mumbai. It will reduce the current travel time by between 50% and 75% depending on road conditions.
Planning
[edit]The proposed Metro Rail at Mumbai has one corridor covering an approximate distance of about 9.209 km (5.722 mi). The corridor will have four stations, all elevated. Some sections of the corridor are underground. Almost all the stations are on the road stations.
The stations have been located so as to serve passenger requirements and to enable convenient integration with other modes of transport. Efforts have been made to propose station locations at a uniform inter-station distance as feasible. The average inter-station distance is ≈2 km, though it varies from 0.873 km to 4.34 km due to land-use and topographic reasons. The minimum inter-station distance is between Shivaji Chowk (Mira Road) Station and Kashimira Metro Station i.e. 872.941 m. The maximum inter-station distance is between Gaimukh Reti Bundar and Varsova Char Phata i.e. 4342.345 m.
Station Type
The stations have been planned with side platforms to avoid the viaduct structure from flaring in and out at stations, which obstructs the road traffic below. Care has been taken to locate stations in straight alignment. However, in some stations, site constraints have become the deciding criteria and a curve of 1000m radius has been introduced in the platform.
List of stations
[edit]# | Station Name | Inter-station Distance (m) | Type of the station |
---|---|---|---|
1 | Gaimukh Reti Bundar | 0 | Elevated |
2 | Varsova Char Phata | 4342.34 | Elevated |
3 | Kashimira | 2684.64 | Elevated |
4 | Shivaji Chowk (Mira Road) | 872.941 | Elevated |
Mumbai Metro Line 4 with Line 10 and Line 11 Extension plan:-
List of stations of Line-11 & Line-4 (CSMT to Gaimukh) and Line-10 (Gaimukh to Shivaji Chowk (Mira Road)) which is the extension of Mumbai Metro is given below: -
S. No. | Name of Station | Station Type | Connections |
---|---|---|---|
1 | Shivaji Chowk (Mira Road) | Elevated | Line 9 (Mumbai Metro) |
2 | Kashimira | Elevated | None |
3 | Varsova Char Phata | Elevated | None |
4 | Gaimukh Reti Bunder | Elevated | None |
5 | Gaimukh | Elevated | Line 4A (Mumbai Metro) |
6 | Gowniwada | Elevated | None |
7 | Kasarvadavali | Elevated | Line 4 (Mumbai Metro) |
8 | Vijay Garden | Elevated | None |
9 | Dongripada | Elevated | None |
10 | Tikuji-ni-wadi | Elevated | None |
11 | Manpada | Elevated | None |
12 | Kapurbawdi | Elevated | Line 5 (Mumbai Metro) |
13 | Majiwada | Elevated | None |
14 | Cadbury Junction | Elevated | None |
15 | Mahapalika Marg | Elevated | None |
16 | RTO Thane | Elevated | None |
17 | Teen Haath Naka (Thane) | Elevated | None |
18 | Mulund Naka | Elevated | None |
19 | Mulund Fire Station | Elevated | None |
20 | Sonapur | Elevated | None |
21 | Shangrila | Elevated | None |
22 | Bhandup | Elevated | None |
23 | Bhandup Mahapalika | Elevated | None |
24 | Naval Housing | Elevated | None |
25 | Gandhi Nagar (Kanjurmarg) | Elevated | Line 6 (Mumbai Metro) |
26 | Surya Nagar | Elevated | None |
27 | Vikhroli | Elevated | None |
28 | Godrej Company | Elevated | None |
29 | Shreyas Cinema | Elevated | None |
30 | Laxmi Nagar | Elevated | None |
31 | Pant Nagar | Elevated | None |
32 | Garodia Nagar | Elevated | None |
33 | Amar Mahal Junction | Elevated | Line 2 (Mumbai Metro) |
34 | Siddharth Colony | Elevated | None |
35 | Suman Nagar | Elevated | None |
36 | Anik Nagar Bus Depot | Elevated | None |
37 | Wadala Truck Terminal | Elevated | None |
38 | Bhakti Park (Wadala) | Elevated | Line 1 (Mumbai Monorail) & Line 11 (Mumbai Metro) |
39 | Ganesh Nagar | Elevated | None |
40 | BPT Hospital | Elevated | None |
41 | Sewri | Underground | None |
42 | Hay Bunder | Underground | None |
43 | Coal Bunder | Underground | None |
44 | Darukhana | Underground | None |
45 | Wadi Tower | Underground | None |
46 | Clock Tower | Underground | None |
47 | Carnac Bunder | Underground | None |
48 | Chhatrapati Shivaji Maharaj Terminus | Underground | Line 3 (Mumbai Metro) |
The car depot will be located at either at Owale or Gaimukh shall be used for this extension of Metro Line 10, Line 11 and Line 4.
Stations
[edit]Line 10 connects Gaimukh in Thane to Shivaji Chowk in Mira road. The line covers four stations in 9.2 kilometers and will run on elevated stations. The stations on this line include
Green Line 10 | |||||||||
---|---|---|---|---|---|---|---|---|---|
# | Station Name | Status | Connections | Layout | |||||
English | Marathi | ||||||||
1 | Shivaji Chowk (Mira Road) | शिवाजी चौक (मिरा रोड) | Approved | Line 9 (Under Construction) | Elevated | ||||
2 | Kashimira | काशिमिरा | Approved | None | Elevated | ||||
3 | Varsova Char Phata | वर्सोवा चार फाटा | Approved | None | Elevated | ||||
4 | Gaimukh Reti Bandar | गायमुख रेती बंदर | Approved | None | Elevated | ||||
5 | Gaimukh | गायमुख | Approved | Line 4 (Under Construction) | Elevated |
This line is expected to cost Rs. 4,476 crore. This line will also connect Borivali, Mira-Bhayander, Thane, and rest of Mumbai.
References
[edit]- ^ "Mira-Bhayander to be connected with Metro". The Times of India. Retrieved 25 February 2017.
- ^ "Plans to extend metro stations to Bhayander may be implemented soon". dna. 25 February 2017. Retrieved 25 February 2017.
- ^ "Dahisar metro extension work to begin in December 2017". Asian Age. 25 February 2017. Retrieved 25 February 2017.