Jump to content

User:Mr.BuriramCN/My subway table

From Wikipedia, the free encyclopedia
Buenos Aires Metro Lines
Line Colour Date opening Original path Current termini Length /km Number of stations Daily passengers
Line A Light Blue 1913 Plaza de Mayo - Plaza Miserere Plaza de Mayo - San Pedrito 9.8 18 307,188
Line B Red 1930 Federico Lacroze - Callao L. N. Alem - Juan Manuel de Rosas 11.75 17 412,882
Line C Blue 1934 Constitución - Diagonal Norte Constitución - Retiro 4.4 9 338,618
Line D Green 1937 Catedral - Tribunales Catedral - Congreso de Tucumán 11.0 16 440,384
Line E Purple 1944 Constitución - Gral. Urquiza Bolívar - Plaza de los Virreyes 9.2 15 135,549
Line H Yellow 2007 Once - Caseros Corrientes - Hospitales 5.0 8 23,853
Line Colour Route Length Stations
red ReumannplatzLeopoldau 14.6 km (9.1 mi) 19
purple KarlsplatzSeestadt 16.7 km (10.4 mi) 20
orange OttakringSimmering 13.5 km (8.4 mi) 21
green HütteldorfHeiligenstadt 16.5 km (10.3 mi) 20
brown SiebenhirtenFloridsdorf 17.4 km (10.8 mi) 24
Name Line Segment Date opened Length Stations
Line 1 1 İçərişəhərHəzi Aslanov 1967 20.1 km 13
Line 2 2 Şah İsmail XətaiDərnəgül 1976 14.5 km 10
# Name (Belarusian/Russian) Opened Length Stations
1 Moskovskaya (Маскоўская/Московская) 1984[1] 17.3 km[1] 14[1]
2 Avtozavodskaya (Аўтазаводская/Автозаводская) 1990[1] 18.1 km[1] 14[1]
Total 35.4 km[1] 28[1]
Line 1 (M) Line 2 (M) Line 3 (T)
  • Esplanade
  • Churchill
Line 4 (T) Line 5 (M) Line 6 (M)
Line 7 (T)
Line Terminals Inauguration Length (km) Stations Length of trip (min) Operation
1 Eldorado ↔ Vilarinho 1 August 1986 28.1[2] 19[3] --- Daily, from 05:45 to 23:00
Line Terminals Opened Length (km) Stations Length of trips (min) Operation
Green Central ↔ Ceilândia 31 March 2001 33 20 40 06:00 to 23:30 Mondays to Fridays; 07:00 to 19:00 on weekends
Orange Central ↔ Samambaia 31 March 2001 42 16 30 06:00 to 23:30 Mondays to Fridays; 07:00 to 19:00 on weekends
Line Start/End Founded Distance (km) Stations Time (Min) Hours
1
Azul
Mercado ↔ São Leopoldo** 1985 39 19 42 05:00 AM to 11:20 PM
Airport Connection
Trensurb ↔ Infraero* 2013 0,8 2 2 06:30 AM to 4:30 PM***

(*) Link the Trensurb's Airport Station to the International Airport Salgado Filho

(**) Extension under construction to Novo Hamburgo with three extra stations

(***) Just during the tests, after, will operate in the same time of line 1.

Line Terminals Start date length (km) Stations Duration (min) Schedule
Center - 1 RecifeCamaragibe 11 of March, 1985 --- 15*(1) 28 Daily, 5 AM to 11 PM
Center - 2 RecifeJaboatão 29 of August, 1987 --- 14 24 Daily, 5 AM to 11 PM
South Recife ↔ Cajueiro Seco 28 of February, 2005 14,3 13 25[4] Daily, 5 AM to 11 PM
Recife Metro Total (C1+C2+S) 11 of March, 1985 39.5 29*(1)** --- ---
Diesel Train*** Cabo ↔ Curado in Recife Since 1988 31,5 9 54 Monday to Saturday, 5 AM to 8 PM

(*) Under construction Stations, (**) The system has overlapping stations, (***) The diesel train isn't included in the metro service, even under the same administration company

Line Color Termini Opened Length Stations Duration of trips (min) Hours of Operation
Line 1 Blue TucuruviJabaquara September 14, 1974 20.2 kilometres (12.6 mi) 23 45 Daily, from 4:40 AM to 0:32 AM
Line 2 Green Vila MadalenaVila Prudente January 25, 1991 14.6 kilometres (9.1 mi) 14 18 Daily, from 4:40 AM to 0:20 AM
Line 3 Red Palmeiras-Barra FundaCorinthians-Itaquera March 10, 1979 22 kilometres (14 mi) 18 36 Daily, from 4:40 AM to 0:35 AM
Line 4[5] Yellow Vila SôniaLuz May 25, 2010 12.8 kilometres (8.0 mi) 11 15 Daily, from 4:40 AM to 0:00 AM
Line 5[6] Lilac Capão RedondoLargo Treze October 20, 2002 8.4 kilometres (5.2 mi) 6 11 Daily, from 4:40 AM to 0:00 AM
Line Terminals Inauguration Length (km) Stations Length of trips (min) Operation
1 Mercado ↔ Bandeira June 5, 1991 13,5 9 30[7] Monday-Friday, 6:00-19:00 hrs
# Opened Planned track Planned stations Current track Current stations U/C track U/C stations
1 1998 29 km 27 20,4 km 16 7,6 km 7
2 2012 17 km 17 10,6 km 11
3 Planned 16 km 19
Total: 62 km 63
Line # Color Termini Year First Built Year Last Changed Length Stations Rush Hour Frequency Off-Peak Frequency
1 Green AngrignonHonoré-Beaugrand 1966 1978 22.1 km 27 2–4 minutes 4–10 minutes
2 Orange Côte-VertuMontmorency 1966 2007 30.0 km 31 2–4 minutes 4–10 minutes
4 Yellow Berri-UQAMLongueuil–Université-de-Sherbrooke 1967 1967 4.25 km 3 4–6 minutes 10 minutes
5 Blue SnowdonSaint-Michel 1986 1988 9.7 km 12 3–5 minutes 6–10 minutes
Line Stations Length[8] Off-peak frequency[9] Rush hour frequency[9]
Bloor–Danforth 31 26.2 kilometres (16.3 mi) 4–5 minutes 2–3 minutes
Scarborough RT 6 6.4 kilometres (4.0 mi) 6–7 minutes 4–5 minutes
Sheppard 5 5.5 kilometres (3.4 mi) 5–6 minutes 5–6 minutes
Yonge–University–Spadina 32 30.2 kilometres (18.8 mi) 4–5 minutes 2–3 minutes
Line Opening Year Route Length [10] Stations Termini Travel Time Frequency Combined Frequency
Peak Off-Peak Peak Off-Peak
Expo Line 1985 28.9 km 20 Waterfront King George 39 min 2.7 min 6–8 min 1.8 min 3–4 min
Millennium Line 2002 42.1 km 1 29 1 Waterfront VCC–Clark 57 min 5.4 min 6–8 min
Canada Line 2009 14.4 km 2 13 2 Waterfront Richmond–Brighouse 25 min 7 min 7–20 min 3.5 min 3.5–10 min
15.1 km 2 13 2 Waterfront YVR–Airport 25 min 7 min 7–20 min

1 Millennium Line is interlined with Expo Line for 16 stations (22 km) between Waterfront and Columbia.
2 Canada Line service is interlined for 10 stations (11.1 km) between Waterfront and Bridgeport.

Line & Colour Terminals
(District)
Opened
[11]
Newest
Extension
Length
km
Stations
(# above ground)
Transfers
01
  Line 1
Pingguoyuan
(Shijingshan)
Sihui East
(Chaoyang)
1969 1999 30.4 23 (2)  2 ,  4 ,  5 ,  10 ,  Batong 
02
  Line 2

loop
Xizhimen
(Xicheng)
Beijing Railway Station (Dongcheng) 1971 1987 23.1 18  1 ,  4 ,  5 ,  6 ,  8 ,  13 ,  Capital Airport 
04
  Line 4

[b]
Anheqiao North
(Haidian)
Gongyixiqiao
(Fengtai)
2009 2010[b] 28.2 24 (1)  1 ,  2 ,  6 ,  9 ,  10 ,  13 ,  Daxing [b]
05
  Line 5
Tiantongyuan North
(Changping)
Songjiazhuang
(Fengtai)
2007 27.6 23 (7)  1 ,  2 ,  6 ,  10 ,  13 ,  Yizhuang 
06
  Line 6
Haidian Wuluju
(Haidian)
Caofang
(Chaoyang)
2012 30.4 20  2 ,  4 ,  5 ,  9 ,  10 
08
  Line 8
Huilongguan Dongdajie
(Changping)
Gulou Dajie
(Dongcheng/Xicheng)
2008 2012 22.0 12[a]  2 ,  10 ,  13 
09
  Line 9
National Library
(Haidian)
Guogongzhuang
(Fengtai)
2011 2012 16.5 12[a]  4 ,  6 ,  10 ,  Fangshan 
10
loop
Xiju
(Fengtai)
Shoujingmao
(Fengtai)
2008 2013 57.1 45  1 ,  4 ,  5 ,  6 ,  8 ,  9 ,  13 ,  14 ,  Yizhuang ,  Capital Airport 
13 Xizhimen
(Xicheng)
Dongzhimen
(Dongcheng)
2002 2003 40.9 16 (15)  2 ,  4 ,  5 ,  8 ,  10 ,  15 ,  Changping ,  Capital Airport 
14 Zhangguozhuang
(Fengtai)
Xiju
(Fengtai)
2013 12.4 06 (2)[a]  10 
15 Wangjing West
(Chaoyang)
Fengbo
(Shunyi)
2010 2011 30.2 12 (4)[a]  13 
BT
  Batong line (through operation to Line 1)
Sihui
(Chaoyang)
Tuqiao
(Tongzhou)
2003 18.9 13 (13)  1 
CP Nanshao
(Changping)
Xi'erqi
(Haidian)
2010 21.24 077 (6)  13 
DX
  Daxing line (through operation to Line 4)

[b]
Gongyixiqiao
(Fengtai)
Tiangongyuan
(Daxing)
2010 21.7 12 (1)  4 [b]
FS Guogongzhuang
(Fengtai)
Suzhuang
(Fangshan)
2010 2011 24.79 11 (9)  9 
YZ Songjiazhuang
(Fengtai)
Ciqu
(Tongzhou)
2010 23.3 13 (8)[a]  5 ,  10 
AE Dongzhimen
(Dongcheng)
Terminal 2 (Chaoyang)
Terminal 3 (Shunyi)
2008 28.1 04 (1)  2 ,  10 ,  13 
Total 457 270[a]
Line Terminals
(District)
Opened Newest
Extension
Length
km
Stations
  Line 1
Shengxian Lake
(Chenghua)
Century City
(Wuhou)
2010 18.50 17
  Line 2
Xipu
(Pixian)
Chengdu Institute of Administration
(Longquanyi)
2012 2013 31.20 26
Total 49.74 43
Line Terminals
(District)
Opened Newest
Extension
Length
km
Stations
01
  Line 1
(Heavy-rail)
Chaotianmen
(Yuzhong)
Daxuecheng
(Shapingba)
2011 2012 36.6 23
01
  Line 2
(Monorail)
Jiaochangkou
(Yuzhong)
Xinshancun
(Dadukou)
2005 2006 19.15 18
01
  Line 3
(Monorail)
Yudong
(Ba'nan)
Jiangbei Airport
(Yubei)
2011 2012 55.5 39
01
  Line 6
(Heavy-rail)
Wulidian
(Jiangbei)
Yuelai (Yubei)
Beibei (Beibei)
2012 2013 56.7 18
Total 168.1 100
Line Terminals
(District)
Opened Newest
Extension
Length
km
Stations
  Line 3
Dalian Station
(Zhongshan)
Jinshitan
(Jinzhou)
2003 49.15 12
  Line 7
Kaifaqu
(Jinzhou)
Jiuli
(Jinzhou)
2008 14.3 7
Total 63.45 18
Line Terminals
(District)
Opened Newest
Extension
Length
km
Stations
Kuiqi Lu
(Chancheng, Foshan)
Xilang
(Liwan, Guangzhou)
2010 20.4 14
Total 20.4 14
Line Terminals Opened Newest
extension
Length
in km
Stations Trains
as of 2010[12]
Heavy rail
Line 1 Guangzhou East Railway Station Xilang 1997 1999 18.5 16 28
Line 2 Jiahewanggang Guangzhou South Railway Station 2002 2010 31.4 24 36
Line 3 Airport South / Tianhe Coach Terminal Tiyu Xilu / Panyu Square 2005 2010 67.3 28 42
Line 4 Huangcun Jinzhou 2005 2010 43.7 16 30
Line 5 Jiaokou Wenchong 2009 31.9 24 30
Line 6 Xunfenggang Changban 2013 24.5 22
Line 8 Fenghuang Xincun Wanshengwei 2003 2010 14.8 13 17
Guangfo Line Kuiqi Lu Xilang 2010 20.4 14 14
People mover
Zhujiang APM Linhexi Canton Tower 2010 3.9 9 6
Line Terminals
(District)
Opened Newest
Extension
Length
km
Stations
01
  Line 1
Hadongzhan
(Daowai)
Hananzhan
(Nangang)
2013 17.47 18
Total 17.47 18
Line Terminals
(District)
Opened Newest
Extension
Length
km
Stations
  Line 1
Xianghu
(Xiaoshan)
Wenze Road (Jianggan)
Linping (Yuhang)
2012 47.97 31
Total 47.97 31
Line and livery Opening Year Latest Extension Termini Length (km) Stations Running time (mins) Depot Gauge Voltage
MTR Train services
East Rail Line 1910 2007 Hung Hom Lo Wu 41.1 14 42 Ho Tung Lau Depot 1435 mm AC 25000 V
Lok Ma Chau 45
Kwun Tong Line 1979 2002 Yau Ma Tei Tiu Keng Leng 11.2 15 28 Kowloon Bay Depot 1432 mm DC 1500 V
Tsuen Wan Line 1982 1982 Central Tsuen Wan 16 16 30 Tsuen Wan Depot
Island Line 1985 1986 Sheung Wan Chai Wan 13.3 14 25 Chai Wan Depot
Tung Chung Line 1998 2005 Hong Kong Tung Chung 31.1 8 26 Siu Ho Wan Depot
Tseung Kwan O Line 2002 2009 North Point Po Lam 11.9 8 15 Tseung Kwan O Depot
LOHAS Park 20
West Rail Line 2003 2009 Hung Hom Tuen Mun 35.4 12 37 Pat Heung Depot 1435 mm AC 25000 V
Ma On Shan Line 2004 2004 Wu Kai Sha Tai Wai 11.4 9 16 Tai Wai Depot
Disneyland Resort Line 2005 2005 Sunny Bay Disneyland Resort 3.3 2 4.5 Siu Ho Wan Depot 1432 mm DC 1500 V
Light rail services
Light Rail (12 routes) 1988 2003 Varies Varies 36.2 68 Varies Tuen Mun Depot 1435 mm DC 750 V
Airport services
Airport Express 1998 2005 Hong Kong AsiaWorld-Expo 35.2 5 29 Siu Ho Wan Depot 1432 mm DC 1500 V
Line Terminals
(District)
Opened Newest
Extension
Length
km
Stations
  Line 1 (through operation to Line 2)
Xiaodongcun
(Guandu)
University Town South
(Chenggong)
2013 22.1 12
  Line 6
East Bus Station
(Panlong)
Airport Center
(Guandu)
2012 18.1 2
Total 40.2 14
Line Terminals
(District)
Opened Newest
Extension
Length
km
Stations
  Line 1
Maigaoqiao
(Qixia)
Olympic Stadium (Jianye)
China Pharmaceutical University (Jiangning)
2005 2010 46.2 31
  Line 2
Youfangqiao
(Jianye)
Jingtianlu
(Qixia)
2010 - 40.8 26
Total 85 57
[13]
Line Terminals
(District)
Opened Newest
Extension
Length
km
Stations
01
  Line 1
Fujin Road
(Baoshan)
Xinzhuang
(Minhang)
1993 2007 36.4 28
02
  Line 2

[note 1]
East Xujing
(Qingpu)
Pudong International Airport
(Pudong)
1999 2010 63.8 30
03
  Line 3
North Jiangyang Road
(Baoshan)
Shanghai South Railway Station
(Xuhui)
2000 2006 40.3 29
04
  Line 4

loop
Yishan Road
(Xuhui)
Yangshupu Road
(Yangpu)
2005 2007 33.7 26
05
  Line 5
Xinzhuang
(Minhang)
Minhang Development Zone
(Minhang)
2003 17.2 11
06
  Line 6
Gangcheng Road
(Pudong)
Oriental Sports Center
(Pudong)
2007 2011 32.3 28
07
  Line 7
Meilan Lake
(Baoshan)
Huamu Road
(Pudong)
2009 2010 44.2 32
08
  Line 8
Shiguang Road
(Yangpu)
Shendu Highway
(Minhang)
2007 2011 37.4 30
09
  Line 9
Songjiang South Railway Station
(Songjiang)
Middle Yanggao Road
(Pudong)
2007 2012 52.1 26
10 Xinjiangwancheng
(Yangpu)
Hongqiao Railway Station (Minhang)
Hangzhong Road (Minhang)
2010 2010 35.4 31
11 North Jiading (Jiading)
Huaqiao (Kunshan, Jiangsu)
Luoshan Road
(Pudong)
2009 2013 72 34
12 Tiantong Road
(Zhabei)
Jinhai Road
(Pudong)
28 Dec
2013
13.14 15
13 Jinyun Road
(Changning)
Jinshajiang Road
(Putuo)
2012 8.3 6
16 Luoshan Road
(Pudong)
Dishui Lake
(Pudong)
28 Dec
2013
51.85 11
Total 468
533 (28 Dec)
[note 2]
303
329 (28 Dec)
[note 3]
Line Terminals
(District)
Opened Newest
Extension
Length
km
Stations
  Line 1
Shisanhaojie
(Tiexi)
Limingguangchang
(Dadong)
2009 2010 27.8 22
  Line 2
Santaizi
(Huanggu & Yuhong)
Quanyunlu
(Dongling)
2012 - 21.86 19
Total 49.66 40
Line Terminals
(District)
Opened Newest
Extension
Length
km
Stations
Luobao
  Line 1
Luohu
(Luohu)
Airport East
(Bao'an)
2004 2011 41.04 30
Shekou
  Line 2
Chiwan
(Nanshan)
Xinxiu
(Luohu)
2010 2011 35.78 29
Longgang
  Line 3
Yitian
(Futian)
Shuanglong
(Longgang)
2010 2011 41.66 30
Longhua
  Line 4
Futian Checkpoint
(Futian)
Qinghu
(Longhua)
2004 2011 19.96 15
Huanzhong
  Line 5
Qianhaiwan
(Nanshan)
Huangbeiling
(Luohu)
2011 40.00 27
Total 178.44 137
Line Terminals
(District)
Opened Newest
Extension
Length
km
Stations
  Line 1
Mudu
(Wuzhong)
Zhongnan Jie
(Gusu)
2012 25.739 24
  Line 2
Suzhou North Railway Station
(Gusu)
Baodaiqiao South
(Wuzhong)
28 Dec
2013
26.557 22
Total 25.739
52.296 (28 Dec)
24
47 (28 Dec)
Line (Operator)
[14]
Terminals
(District)
Opened Newest
Extension
Length
km
Stations
01
  Line 1
(Metro)
Shuanglin
(Jinnan)
Liuyuan
(Beichen)
1984 2006 26.188 22
02
  Line 2
(Metro)
Caozhuang
(Xiqing)
Konggangjingjiqu
(Dongli)
2012 2013 22.657 19
03
  Line 3
(Metro)
Xiaodian
(Beichen)
Gaoxinqu
(Xiqing)
2012 29.655 23
09
  Line 9
(BMT)
Tianjin Railway Station
(Hedong)
Donghai Road
(Binhai)
2004 2012 52.759 19
Total 131.259 82
TEDA (BMT) TEDA
(Binhai)
North of College District
(Binhai)
2007 7.860 14
Line Terminuses
(District)
Opened Newest
Extension
Length
km
Stations
  Line 1
Dijiao
(Jiang'an)
Dongwu Boulevard
(Dongxihu)
2004 2010 28.87 27
  Line 2
Jinyintan
(Dongxihu)
Optics Valley Square
(Hongshan)
2012 27.985 21
  Line 4
Wuchang Railway Station
(Wuchang)
Wuhan Railway Station
(Hongshan)
28 Dec
2013
16.488 15
Total 56.85
73.34 (28 Dec)
47
60 (28 Dec)
Line Terminals
(District)
Opened Newest
Extension
Length
km
Stations
  Line 1
Houweizhai
(Weiyang)
Fangzhicheng
(Baqiao)
2013 25.4 19
  Line 2
Bei Kezhan
(Weiyang)
Huizhan Zhongxin
(Yanta)
2011 20.5 17
Total 45.9 36
Line Terminals
(District)
Opened Newest
Extension
Length
km
Stations
01
  Line 1
Xiliuhu
(Zhongyuan)
Zhengzhou Sports Center
(Jinshui)
2013 26.34 20
Total 26.34 20
Line A
(Metro)

North to South
23.2 km (14.4 mi)[15]
21 stations[15]
Line B
(Metro)

Center to West
5.6 km (3.5 mi)[15]
7 stations[15]
Line J
(Metrocable)

West to Northwest
2.7 km (1.7 mi)[15]
4 stations[15]
Line K
(Metrocable)

North to Northeast
2.0 km (1.2 mi)[15]
4 stations[15]
Line L
(Metrocable)

Northeast to far Northeast
4.6 km (2.9 mi)[15]
2 stations[15]
  • Niquia
  • Bello
  • Madera
  • Acevedo
  • Tricentenario
  • Caribe
  • Universidad
  • Hospital
  • Prado
  • Berrío Park
  • San Antonio
  • Alpujarra
  • Exposiciones
  • Industriales
  • Poblado
  • Aguacatala
  • Ayurá
  • Envigado
  • Itagüí
  • Sabaneta
  • La Estrella
  • San Antonio
  • Cisneros
  • Suramericana
  • Estadio
  • Floresta
  • Santa Lucía
  • San Javíer
  • San Javíer
  • Juan XXIII
  • Vallejuelos
  • La Aurora
  • Acevedo
  • Andalucía
  • Popular
  • Santo Domingo Savio
  • Santo Domingo Savio
  • Arví
# Name Opened Length Stations
A Line A (Linka A) 1978[16] 11.0 km (6.8 mi)[17] 13
B Line B (Linka B) 1985[16] 25.6 km (15.9 mi)[17] 24
C Line C (Linka C) 1974[16] 22.4 km (13.9 mi)[17] 20
Total: 59.4 km (36.9 mi)[18] 57 (transfer stations counted as two; see above)
# Name Planned lines
D Line D (Linka D) would connect the city centre and southern parts
E Line E (Linka E) would have a circle line[citation needed]

Line 1[19]
14.5 km (9.0 mi)[19]
Villa Mella to Centro de los Héroes
16 stations[19]

Line 2[20]
12.85 km (7.98 mi)[20]
Ave. Luperón to Puente de la 17
14 stations[20]
  • Mamá Tingó
  • Gregorio Urbano Gilbert
  • Gregorio Luperón
  • José Francisco Peña Gómez
  • Hermanas Mirabal
  • Máximo Gómez
  • Los Taínos
  • Pedro Livio Cedeño
  • Peña Batlle
  • Centro Olímpico Juan Pablo Duarte
  • Juan Bosch
  • Casandra Damirón
  • Joaquín Balaguer
  • Amín Abel
  • Francisco Alberto Caamaño
  • Centro de los Héroes
  • María Móntez
  • Pedro F. Bonó
  • Francisco G. Billini
  • Ulises F. Espaillat
  • Pedro Mir
  • Freddy Beras Goico
  • Juan U. García F.
  • Centro Olímpico Juan Pablo Duarte
  • Col. Rafael T Fernández D.
  • Mauricio Báez
  • Ramón Cáceres
  • Horacio Vásquez
  • Manuel de Jesús Galván
  • Eduardo Brito
Line Termini Opened Latest extension Length
(km)
Stations
Line 1 Helwan - El Marg 1987 1999 44 34
Line 2 Shobra El Kheima - El Mounib 1996 2005 21 20
Line 3 Attaba - Abbassia 2012 - 4.3 5
Line Colour Opened[21] Length[21] Stations[21] Terminus
A Red 1978 9.2 km (5.7 mi) 14 Perrache - Vaulx en Velin La Soie
B Blue 1978 6.2 km (3.9 mi) 9 Charpennes - Oullins Gare
C Orange 1974 2.4 km (1.5 mi) 5 Hôtel de Ville - Cuire
D Green 1991 12.5 km (7.8 mi) 15 Gare de Vaise - Gare de Vénissieux

References

[edit]
  1. ^ a b c d e f g h Cite error: The named reference Metro-structure was invoked but never defined (see the help page).
  2. ^ Cite error: The named reference data was invoked but never defined (see the help page).
  3. ^ Cite error: The named reference map was invoked but never defined (see the help page).
  4. ^ http://www.cbtu.gov.br/operadoras/sites/menuprincrec.htm
  5. ^ http://www.metro.sp.gov.br/obras/linha-4-amarela/index.aspx
  6. ^ http://www.metro.sp.gov.br/obras/linha-5-lilas/index.aspx
  7. ^ http://www.florianonet.com.br/metro-pi/projeto.htm
  8. ^ Cite error: The named reference TTC 2011 Stats was invoked but never defined (see the help page).
  9. ^ a b Cite error: The named reference Service Summary was invoked but never defined (see the help page).
  10. ^ TransLink; PTV America (February 2007), TransLink’s Rapid Transit Model - An Operations Planning Model under VISUM Project Report and Technical Documentation – Phase A, pp. 12, 63
  11. ^ See "History" section of this article.
  12. ^ "广州地铁二〇一〇年度年报" (in Chinese). Guangzhou Metro Corporation. 2011. Retrieved 2011-07-26. {{cite web}}: Unknown parameter |trans_title= ignored (|trans-title= suggested) (help)
  13. ^ This figure involves counting the two interchanges once for every line that it is part of. If every interchange is only counted once, there will be 55 stations.
  14. ^ "Metro" refers to the Tianjin Metro General Corporation, while "Binhai" refers to the Tianjin Binhai Mass Transit Development Corporation.
  15. ^ a b c d e f g h i j Cite error: The named reference sistema was invoked but never defined (see the help page).
  16. ^ a b c Cite error: The named reference company-history was invoked but never defined (see the help page).
  17. ^ a b c "Metro". Praha.eu. Retrieved 18 January 2014.
  18. ^ Cite error: The named reference company-profile was invoked but never defined (see the help page).
  19. ^ a b c "Línea 1" (in Spanish). Oficina para el Reordenamiento de Transporte (OPRET). Retrieved 2013-09-17. {{cite web}}: Unknown parameter |trans_title= ignored (|trans-title= suggested) (help)
  20. ^ a b c "Línea 2 - 1ra Etapa" (in Spanish). Oficina para el Reordenamiento de Transporte (OPRET). Retrieved 2013-09-17. {{cite web}}: Unknown parameter |trans_title= ignored (|trans-title= suggested) (help)
  21. ^ a b c Cite error: The named reference SYTRAL was invoked but never defined (see the help page).

Notes

[edit]
  1. ^ Currently, Line 2 has two sections running separately: the section west of Guanglan Road towards Hongqiao Airport is served by 8-carriaged trains that run at 5-minute intervals; while the section east of Guanglan Road towards Pudong International Airport is served by 4-carriaged trains that run at 13-minute intervals from 9 am to 4 pm. Any trips that bypass Guanglan Road station requires passengers to transfer to the opposite platform at the station.
  2. ^ Cite error: The named reference exclude-maglev-22 was invoked but never defined (see the help page).
  3. ^ Cite error: The named reference Stncount was invoked but never defined (see the help page).