Jump to content

Line 1 (Harbin Metro)

From Wikipedia, the free encyclopedia
Line 1
A Harbin Metro Line 1 train
Overview
StatusOperational
OwnerHarbin
LocaleHarbin, Heilongjiang, China
Termini
Stations23
Service
TypeRapid transit
SystemHarbin Metro
Services1
Operator(s)Harbin Metro Group Corporation
History
Opened26 September 2013; 11 years ago (2013-09-26)
Technical
Line length26.05 km (16.19 mi)[1]
Number of tracks2
CharacterUnderground
Track gauge1,435 mm (4 ft 8+12 in)
Route map
Line 1
Chinese
English
哈尔滨东站
Harbin East Railway Station
桦树街
Huashu Street
交通学院
Jiaotongxueyuan
太平桥
Taipingqiao
Daowai District
Nangang District
工程大学
Harbin Engineering University
烟厂
Tobacco Manufacturer
医大一院
The First Affiliated Hospital of Harbin Medical University
博物馆
Museum of Heilongjiang Province
铁路局
Harbin Railway CO.,Ltd
哈工大
Harbin Institute of Technology
西大桥
Xidaqiao
和兴路
Hexing Road
学府路
Xuefu Road
理工大学
Harbin University of Science and Technology
黑龙江大学
Heilongjiang University
医大二院
The Second Affiliated Hospital of Harbin Medical University
哈达
Hada
哈尔滨南站
Harbin South Railway Station
同江路
Tongjiang Road
Nangang District
Xiangfang District
瓦盆窑
Wapenyao
镜泊路
Jingpo Road
渤海路
Bohai Road
Xiangfang District
Pingfang District
新疆大街
Xinjiang Street

Line 1 of the Harbin Metro (Chinese: 哈尔滨地铁一号线; pinyin: Hārbīn Dìtiě Yī Hào Xiàn) is a rapid transit line running from west to east Harbin. It was open on the 26 September 2013. This line is 26.05 km[1] long with 23 stations.

History

[edit]

The Phase 1 & 2 opened on 26 September 2013.

Museum of Heilongjiang Province station opened as an infill station on 23 September 2014.

The Phase 3 (except Wapenyao station) opened on 10 April 2019.

Wapenyao station opened as an infill station on 28 September 2019.

Opening timeline

[edit]
Segment Commencement Length Station(s) Name
Harbin East Railway Station — Harbin South Railway Station 26 September 2013 17.47 km (10.86 mi) 17 Phase 1 & 2
Museum of Heilongjiang Province 23 September 2014 Infill station 1
Harbin South Railway Station — Xinjiang Street 10 April 2019 8.58 km (5.33 mi) 4 Phase 3
Wapenyao 28 September 2019 Infill station 1

Stations (north to south)

[edit]
Station name Connections Nearby Bus Stops Distance
km
Location First train[2] Last train[2]
English Chinese Harbin East Railway Station Xinjiang Street Harbin East Railway Station Xinjiang Street
Harbin East Railway Station 哈尔滨东站 China Railway VBB 6 27 33 35 90 203 332 Airport-3 0.00 0.00 Daowai 6:00 21:00
Huashu Street 桦树街 27 55 74 76 90 93 116 367 0.90 0.90 6:33 6:02 21:32 21:01
Jiaotongxueyuan 交通学院 74 0.85 1.75 6:31 6:04 21:30 21:03
Taipingqiao 太平桥  3  104 105 0.90 2.65 6:29 6:06 21:28 21:05
Harbin Engineering University 工程大学 1.10 3.75 Nangang 6:27 6:08 21:26 21:07
Tobacco Manufacturer 烟厂 6 14 33 37 55 74 104 1.30 5.05 6:24 6:10 21:24 21:10
The First Affiliated Hospital of Harbin Medical University 医大一院 10 14 33 74 0.80 5.85 6:22 6:11 21:22 21:12
Museum of Heilongjiang Province 博物馆  2  10 104 0.60 6.45
Harbin Railway Co., Ltd 铁路局 104 107 111 1.00 7.45 6:19 6:15 21:19 21:15
Harbin Institute of Technology 哈工大 64 1.00 8.45 6:17 6:17 21:17 21:17
Xidaqiao 西大桥 9 10 11 31 63 75 77 82 82区间
88 90 91 92 104 107 110环线 111 336 336区间
0.85 9.30 6:15 6:19 21:15 21:19
Hexing Road 和兴路 67 90 102 110环线
111 117 363 363支4
0.80 10.1 6:13 6:21 21:13 21:21
Xuefu Road 学府路 104 106 1.25 11.35 6:10 6:23 21:10 21:23
Harbin University of Science and Technology 理工大学 11 31 67 68 87 88 94 104 106
107 209 336 336区间
0.85 12.20 6:09 6:26 21:08 21:25
Heilongjiang University 黑龙江大学 11 31 67 68 83 88 94 104 106
114 202 209 336 336区间 343 363支4
0.90 13.10 6:07 6:27 21:07 21:27
The Second Affiliated Hospital of Harbin Medical University 医大二院  3  11 67 68 69 104 106 114 203
217 218 218支 220 343 369 602
1.05 14.15 6:04 6:29 21:04 21:29
Hada 哈达 68 104 114 218 220 343 369 1.60 15.75 6:02 6:32 21:02 21:32
Harbin South Railway Station 哈尔滨南站 Harbin South railway station VNB 68 104 114 220 343 369 1.50 17.25 6:00 21:00
Tongjiang Road 同江路
Wapenyao 瓦盆窑 Xiangfang
Jingpo Road 镜泊路
Bohai Road 渤海路
Xinjiang Street 新疆大街 Pingfang

References

[edit]
  1. ^ a b 【快讯】官宣!地铁1号线三期开通时间确定!1号线全长26.05公里,用时约50分钟. 163.com (in Chinese). 2019-03-29. Archived from the original on 2021-12-21. Retrieved 2021-12-21.
  2. ^ a b 哈尔滨地铁一号线运营时间(冬季). dthrb.com (in Chinese). 2013-09-27. Archived from the original on 2015-06-11. Retrieved 2015-06-21.