User:Feroze Ahmad 2/sandbox6
Continuation of Smaller Articles Backup
[edit]Suratgarh–Bathinda line
[edit]Suratgarh–Bathinda line with Anupgarh and Fazilka–Abohar branch lines | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Overview | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Status | Operational | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Owner | Indian Railways | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Locale | Rajasthan and Punjab | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Termini | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Service | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operator(s) | North Western Railway Northern Railway | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
History | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Opened | 1970 (Main line) 30 March 1929 (Anupgarh branch) 17 July 2012 (Fazilka branch) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Technical | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Line length | Main line 264 km (164 mi) Branch lines: Fazilka–Abohar 43 km (27 mi) Sarupsar–Anupgarh 56 km (35 mi) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Track gauge | 1,676 mm (5 ft 6 in) Broad Gauge | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Old gauge | 1,000 mm (3 ft 3+3⁄8 in) Metre gauge | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operating speed | 100 km/h | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The Suratgarh–Bathinda line or Suratgarh–Shri Ganganagar–Bathinda line is a railway route on the North Western Railway zone and Northern Railway zone of Indian Railways. This route plays an important role in rail transportation of Bikaner division of Rajasthan state and Fazilka district, Sri Muktsar Sahib district and Bathinda district of Punjab.
The corridor passes through the Desert Area of Rajasthan and runs with a stretch of 264 km with consists of two branch lines, the first branch line starts from Sarupsar Junction and ends at Anupgarh with a stretch of 56 km, whereas the second branch line starts from Abohar Junction and ends at Fazilka Junction with a stretch of 43 km.
History
[edit]The main railway line from Suratgarh Junction to Bathinda Junction via Shri Ganganagar was originally built by Bikaner State Railway company of Bikaner Princely State and Southern Punjab Railway of Punjab Province portion as metre-gauge line was constructed on different phases.
- The first phase, from Suratgarh Junction to Rai Singh Nagar was opened on 1 October 1925.
- The second phase, from Rai Singh Nagar to Kesrisinghpur was opened on 1 September 1927.
- The third phase, from Kesrisinghpur to Shri Ganganagar Junction was opened on 1 May 1926.
- The fourth phase, from Bathinda Junction to Hindumalkot (the portion of Delhi–Bathinda–Mcleodganj–Sammasatta line) was opened on 10 November 1897.[1]
- The Fifth phase, from Hindumalkot to Shri Ganganagar Junction was opened on 1970.[2]
Whereas, the branch line from Sarupsar Junction to Anupgarh which comes under the portion of Bikaner State Railway was opened on 30 March 1929.[3]
After that, the conversion of main line into 5 ft 6 in (1,676 mm) broad gauge was sanctioned in 1997-98,[4] Which it was important for military purpose because this railway line also passes through nearest of International border of India, was opened in different sections.[5]
- The first phase, between Shri Ganganagar and Sarupsar Junction was opened on 9 June 2012.[6]
- The second phase, between Suratgarh and Anupgarh was opened on 25 July 2013.[7]
After that, the new branch line between Abohar Junction and Fazilka was started construction on 2004 [8] for easier transport of nearby Indian International borders and after some years it was opened on 12 July 2012.[9]
Trains Passing through this line
[edit]- Kochuveli–Shri Ganganagar Junction Express
- Bikaner–Delhi Sarai Rohilla Superfast Express
- Hazur Sahib Nanded–Shri Ganganagar Weekly Express
- Firozpur Cantonment–Shri Ganganagar Express
References
[edit]- ^ "Indian Railways history" (PDF). Retrieved 2012-11-06.
- ^ "Hindumalkot Railway station in Sri ganganagar district". Patrika.
- ^ "Administration report on Indian Railways 1939" (PDF). Retrieved 2021-07-25.
- ^ "Achievement of Construction Department during year 2016-17". India Rail Info. Retrieved 3 July 2021.
{{cite web}}
: line feed character in|title=
at position 39 (help) - ^ "COMMITTEE ON PETITIONS NINTH REPORT" (PDF). Government of India. Retrieved 17 July 2021.
{{cite web}}
:|archive-date=
requires|archive-url=
(help) - ^ "Broad gauge track at Sriganganagar". Times of India. Retrieved 17 May 2021.
- ^ "Suratgarh Anupgarh Passenger Inauguration" (PDF). North Western Railways. Government of India. Retrieved 17 May 2021.
- ^ "Nitish lays Fazilka-Abohar line foundation". Times of India. 2 February 2004.
- ^ "Abohar Fazilka rail line to be operational soon". Times of India. 11 July 2012.
{{cite web}}
: zero width space character in|title=
at position 1 (help)
Shri Ganganagar–Sadulpur line
[edit]Shri Ganganagar–Sadulpur line | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Overview | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Status | Operational | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Owner | Indian Railways | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Locale | Rajasthan and Haryana | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Termini | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Service | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operator(s) | North Western Railway | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
History | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Opened | 13 November 1930 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Technical | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Line length | Main line 244 km (152 mi) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Track gauge | 1,676 mm (5 ft 6 in) Broad Gauge | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Old gauge | 1,000 mm (3 ft 3+3⁄8 in) Metre gauge | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electrification | Under progress | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operating speed | 100 km/h | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The Shri Ganganagar–Sadulpur line or Sri Ganganagar–Hanumangarh–Sadulpur line is a railway route on the North Western Railway zone of Indian Railways. This route plays an important role in rail transportation of Bikaner division of Rajasthan state and some portion of Sirsa district of Haryana.
The corridor passes through the Desert Area of Rajasthan and some portion of Haryana with a stretch of 244 km with one reversal at Hanumangarh Junction which connects Jodhpur–Bathinda line.
History
[edit]The main railway line from Shri Ganganagar Junction to Sadulpur Junction via Hanumangarh Junction was originally built by Bikaner State Railway company of Bikaner Princely State portion as metre-gauge line was constructed on different phases.
- The first phase, from Sri Ganganagar Junction to Sadulshahr was opened on 1 August 1923.
- The second phase, from Sadulshahr to Hanumanagarh Junction was opened on 27 April 1923.
- The third phase, from Hanumangarh Junction to Nohar was opened on 15 September 1927.
- The fourth phase, from Nohar to Tahsil Bhadra was opened on 16 September 1928.
- The Fifth phase, from Tahsil Bhadra to Suratpura Junction was opened on 13 November 1930.[1]
After that, the conversion of main line into 5 ft 6 in (1,676 mm) broad gauge was sanctioned in 2006-07,[2] Which its an another important line for military purpose because this railway line also connects to the Jodhpur–Bathinda railway line which it lies nearest of International border of India, was opened in different sections.[3]
- The first phase, between Shri Ganganagar and Hanumangarh Junction was opened on 29 January 2014.[4]
- The second phase, between Hanumangarh Juncrion and Suratpura Junction was opened on 24 May 2016.[5]
Electrification
[edit]Currently the electrification is going on dividing the three sections of this route, the first section is Sadulpur Junction–Nohar, the second section is Nohar–Hanumangarh Junction and the third section is Hanumangarh Junction–Shri Ganganagar Junction. The first section is electrified on 31 March 2021.[6] and the second and third section is currently going under progress.[7]
Trains Passing through this line
[edit]- Sri Ganganagar–Tiruchirappalli Humsafar Express
- Kota–Shri Ganganagar Superfast Express
- Hazur Sahib Nanded–Shri Ganganagar Superfast Express via Hanumangarh
- Firozpur Cantonment–Shri Ganganagar Express
- Amrapur Aravali Express
References
[edit]- ^ "Indian Railways history" (PDF). Retrieved 2012-11-06.
- ^ "Achievement of Construction Department during year 2016-17". India Rail Info. Retrieved 3 July 2021.
- ^ "Sriganganagar to get alternate short-distance broad gauge route by may". Government of India. Retrieved 17 July 2021.
{{cite news}}
:|archive-date=
requires|archive-url=
(help) - ^ "Bikaner Division" (PDF). North Western Railway. Retrieved 17 July 2021.
{{cite web}}
:|archive-date=
requires|archive-url=
(help) - ^ "Loksabha Questions on Work" (PDF). Ministry of Railways. Government of India. Retrieved 17 May 2021.
- ^ "Electrification Work Given In Sadulpur Nahar Railway Block". Bhaskar.
- ^ "North Western Railway Completed Electrification Of 566 Km Trek In The Year 2020-21". Navbharat Times.
Laksar–Dehradun line
[edit]Laksar–Dehradun line | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Overview | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Status | Operational | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Owner | Indian Railways | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Locale | Uttarakhand | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Termini | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Service | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operator(s) | Northern Railway | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
History | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Opened | 13 March 1900 (Main line) 2 April 1927 (Rishikesh branch) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Technical | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Line length | Main line 79 km (49 mi) Raiwala–Rishikesh branch line 12 km (7 mi) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Track gauge | 1,676 mm (5 ft 6 in) Broad Gauge | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electrification | Yes | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operating speed | 100 km/h | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The Laksar–Dehradun line is a railway route on the Northern Railway zone of Indian Railways. This route plays an important role in rail transportation of Garhwal division of Uttarakhand state.
The corridor passes through the Hilly Areas of Uttarakhand and some portion are near the bank of Ganges with a stretch of 79 km which connects Laksar Junction situates on Moradabad–Ambala line and Dehradun. It has a branch line which starts from Raiwala Junction and ends at Rishikesh with a stretch of 12 km.
History
[edit]The main railway line from Laksar Junction to Dehradun via Raiwala Junction was originally built by Oudh and Rohilkhand Railway of United Provinces of Agra and Oudh portion as 5 ft 6 in (1,676 mm) broad gauge was constructed on different phases.
- The first phase, from Laksar Junction to Jwalapur was opened on 1 January 1886.
- The second phase, from Jwalapur to Haridwar was opened on 20 August 1886.
- The third phase, from Haridwar to Dehradun was sanctioned on 18 November 1896[1] and opened on 1 March 1900.[2]
Whereas, the branch line between Raiwala Junction and Rishikesh which were comes under the East Indian Railway Garhwal district portion was opened on 2 April 1927.[3] And the extension of the line to Karnaprayag by Rishikesh–Karnaprayag line, the Yog Nagari Rishikesh railway station was inaugurated on 12 January 2021.[4]
Electrification
[edit]The electrification was done on dividing the three sections of this route, the first section is Laksar Junction–Haridwar,[5] the second section is Haridwar–Dehradun[6] and the third section is Raiwala–Rishikesh branch. The First section is electrified on 28 September 2015.[7] The second section is electrified on 20 October 2016.[8] [9]And the third section was opened on 2018.[10]
Trains Passing through this line
[edit]Main
[edit]- Kathgodam–Dehradun Express
- Nanda Devi AC Express
- Doon Express
- Mussoorie Express
- Dehradun–Amritsar Express
- Naini Doon Jan Shatabdi Express
- Dehradun Jan Shatabdi Express
- Dehradun Shatabdi Express
- Rapti Ganga Express
- Bandra Terminus–Dehradun Express
- Upasana Express
- Indore–Dehradun Express
- Ujjaini Express
- Uttaranchal Express
Branch
[edit]- Kalinga Utkal Express
- Yoga Express
- Yog Nagari Rishikesh–Prayagraj Sangam Express
- Yog Nagari Rishikesh–Jammu Tawi Express
- Udaipur City–Yog Nagari Rishikesh Express
- Doon Express
- Kochuveli–Yog Nagari Rishikesh Superfast Express
- Hemkunt Express
References
[edit]- ^ Raturi, Prachi (26 Feb 2015). "The unfulfilled dream of train to Mussoorie | Dehradun News". The Times of India. Retrieved 31 March 2020.
- ^ Singh, Surendra (1995). Urbanization in Garhwal Himalaya: A Geographical Interpretation. M.D. Publications Pvt. Ltd. p. 101. ISBN 978-81-85880-69-3. Retrieved 31 March 2020.
- ^ "Indian Railways history" (PDF). Retrieved 2012-11-06.
- ^ "Rishikesh-Karnprayag rail line: Indian Railways starts train operations from Yog Nagari Rishikesh station". The Financial Express.
- ^ "Rawat Demands Expansion of Rail Network in Uttarkhand". Outlook India.
- ^ "50km Dehradun-Haridwar rail line to be electrified this year". Times of India.
- ^ "electric trains will run between laksar and haridwar". Bhaskar.
- ^ "Railway electrification raises concern over safety of wild animals on track". Times of India.
- ^ "First electric train from Dehradun to Haridwar". Amarujala.
- ^ "Questions and Answers on the Lok Sabha for railway electrification related" (PDF). Ministry of Railways. Government of India.
Amritsar–Khem Karan line
[edit]Amritsar–Khem Karan line with Beas Branch line | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Overview | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Status | Operational | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Owner | Indian Railways | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Locale | Punjab | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Termini |
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Service | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operator(s) | Northern Railway | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
History | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Opened | 4 April 1910 (Main line) 2011 (Beas branch) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Technical | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Line length | Main line 77 km (48 mi) Tarn Taran–Beas branch line 49 km (30 mi) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Track gauge | 1,676 mm (5 ft 6 in) Broad Gauge | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electrification | Yes | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operating speed | 100 km/h | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The Amritsar–Khem Karan line is a railway route on the Northern Railway zone of Indian Railways. This route plays an important role in rail transportation in Punjab state.
The corridor passes through the Plain Areas of Punjab and some portion are near the bank of Beas with a stretch of 77 km which connects Amritsar Junction situates on Ambala–Attari line and Khem Karan. It has a branch line which starts from Tarn Taran Junction and ends at Beas Junction with a stretch of 49 km.
History
[edit]The main railway line from Amritsar Junction to Khem Karan and Kasur via Tarn Taran Junction was originally built by Killick, Nixon and Company with under North Western State Railway Company in Punjab portion as 5 ft 6 in (1,676 mm) broad gauge was constructed on different phases.
- The first phase, from Amritsar Junction to Tarn Taran was opened on 21 September 1906.
- The second phase, from Tarn Taran to Patti was opened on 30 December 1906.
- The third phase, from Patti to Kasur was opened on 4 April 1910.[1]
But due to Partition of India in 1947, The Khem Karan–Kasur link was totally dismantled[2] and the trains run till Khem Karan.[3][4]
Whereas, the branch line between Tarn Taran Junction and Beas Junction which lies on Ambala–Attari line was opened on different phases.
- The first phase, between Beas Junction to Goindwal was opened on 18 December 1997.[5]
- The second phase, between Tarn Taran Junction to Goindwal was approved on 1999[6] and opened on 2011.[7]
Electrification
[edit]The electrification was started on 2019 [8], As the Amritsar–Tarn Taran–Beas section[9] and the remaining section as Tarn Taran–Khem Karan section is going to be electrified.[10]
Project
[edit]Currently the Patti–Mallanwala Khas rail link was sanctioned on 2013 [11] for another direct link between Amritsar and Firozpur and Rest of India is under construction.[12]
References
[edit]- ^ "Administration Report on the Railways in India – corrected up to 31st March 1918; Superintendent of Government Printing, Calcutta; page 110". Retrieved 2016-02-16.
- ^ "International links with India". IRFCA.
- ^ "Separated by Partition, reunited by rail". Hindustan Times.
- ^ "District Census Handbook Tarn Taran" (PDF). Government of India.
- ^ "Manisha Sharma vs Union Of India And Ors. on 21 December, 2012". Indian Kanoon.
- ^ "Ludhiana rail link gets underway". Tribune India. Retrieved 2012-08-14.
- ^ "Duronto, finally, links Chandigarh to Amritsar". Retrieved 2011-08-25.
- ^ "MP urges Goyal to initiate work on Patti-Ferozepore rail line". Tribune India.
- ^ "Railways releases Rs.120 crore for track electrification". Tribune India.
- ^ "Electrification of rly tracks in the pipeline". Tribune India.
- ^ "Questions and Answers in Lok sabha for railway projects" (PDF). Government of India.
- ^ "Patti-Makhu rail link hanging fire for 7 years". Hindustan Times.
Bangur Nagar metro station
[edit]
Bangur Nagar (formerly known as Pahadi Goregaon) is an elevated metro station on the North-South corridor of the Yellow Line 2A of Mumbai Metro in Mumbai, India. This station is located in Goregaon, Mumbai. This station is owned by the Mumbai Metropolitan Region Development Authority (MMRDA) and was inaugurated on 19 January 2023.[1][2][3]
History
[edit]J Kumar Infraprojects was awarded the contract to construct the station in June 2016.[4] The MMRDA announced that electrification of the line had been completed on 26 May 2020.[5][6]
Later it was opened to the public on 19 January 2023, along with the second phase of Line 2A.[7][8] The station was originally named Pahadi Goregaon. The MMRDA renamed the station as Bangur Nagar on 10 April 2023 due to public demand.[9]
Station layout
[edit]G | Street Level | Exit/Entrance |
L1 | Mezzanine | Fare control, station agent, Metro Card vending machines, crossover |
L2 | Side platform | Doors will open on the left | |
Platform 2 Southbound |
Towards → Andheri West next station is Goregaon West | |
Platform 1 Northbound |
Towards ← Dahisar East next station is Lower Malad | |
Side platform | Doors will open on the left | ||
L2 |
Power and signaling system
[edit]Like all other stations and railways of Mumbai metro, Bangur Nagar station also uses 25,000 volt AC power system by overhead catenary to operate the trains.
References
[edit]- ^ "Mumbai Metro: Line 2A, Line 7 launched, check routes, station details here". DNA India. Retrieved 2023-04-18.
- ^ "Mumbai Metro: These 2 lines to get operational today. Check route, other details". mint. 2023-01-19. Retrieved 2023-04-18.
- ^ "Mumbai Metro's 2A & 7 Lines to Cover Andheri to Dahisar in Just 75 Minutes | Know Fare, Routes as Ops Begin Today". News18. 2023-01-20. Retrieved 2023-04-18.
- ^ "Tainted J Kumar Infraporjects bags Dahisar-DN Nagar Metro 2A project". dna. 9 August 2016. Archived from the original on 15 October 2016. Retrieved 14 October 2016.
- ^ "MMRDA to conduct test run for two elevated Metro lines next week". Mumbai Mirror. IANS. May 26, 2021. Retrieved 2023-07-09.
- ^ "Mumbai Metro: These 2 lines to get operational today. Check route, other details". mint. 2023-01-19. Retrieved 2023-04-18.
- ^ "Mumbai: Phase 1 of Metro Line 2A and 7 opened for public". The Indian Express. 2022-04-03. Retrieved 2023-07-09.
- ^ "Mumbai Metro: These 2 lines to get operational today. Check route, other details". mint. 2023-01-19. Retrieved 2023-04-18.
- ^ "Mumbai: Three Metro stations renamed on public demand". Free Press Journal. Retrieved 2023-07-09.