Tianhuangping Pumped Storage Power Station
Upper reservoir
CountryChina
LocationTianhuangping, Anji County of Zhejiang Province, China
Coordinates30°28′13″N 119°36′21″E / 30.47028°N 119.60583°E / 30.47028; 119.60583
StatusOperational
Construction began1993
Opening date2004
Construction cost$900 million USD
Upper reservoir
CreatesTianhuangping Upper
Total capacity6,760,000 m3 (5,480 acre⋅ft) (Normal)
Lower reservoir
CreatesTianhuangping Lower
Total capacity6,770,000 m3 (239,000,000 cu ft) (Normal)
Power Station
Hydraulic head887 m (2,910 ft)
Pump-generators6 reversible Francis turbines
Installed capacity1,836 MW
2,016 MW (Planned)

The Tianhuangping Pumped Storage Power Station (Chinese: 天荒坪抽水蓄能电站) is a pumped-storage power station in Tianhuangping, Anji County of Huzhou, Zhejiang Province, China. The power station has an installed capacity of 1,836 megawatts (2,462,000 hp) utilizing 6 reversible Francis turbines. Construction began in 1993 and the power station was completed in 2004.[1][unreliable source?]

Operation

[edit]

Tianhuangping Dam

[edit]

Situated on the Daxi Creek, the Tianhuangping Dam creates the power station's lower reservoir. The concrete face rock-fill dam is 72 metres (236 ft) high and 577 metres (1,893 ft) long. The dam creates a reservoir that can store 6,770,000 cubic metres (5,490 acre⋅ft) of water and contains an uncontrolled side-weir spillway that can discharge a design level of 536 cubic metres per second (18,900 cu ft/s).[2]

Upper reservoir

[edit]

From the lower reservoir, water is pumped up into the upper reservoir which has a normal storage capacity of 6,760,000 cubic metres (5,480 acre⋅ft). The upper reservoir is artificial and cut into the mountain and created with the assistance of four saddle dams. When power is being generated, the water leaves the reservoir and falls through two 882 metres (2,894 ft) long and 7 metres (23 ft) diameter penstocks down towards the power station which is above the lower reservoir. Before reaching the reversible turbines, the water branches off into six branch pipes.[2]

Power station

[edit]

The six branch pipes feed water into the six turbines. Each reversible Francis turbine has a 306 megawatts (410,000 hp) installed capacity and 336 megawatts (451,000 hp) maximum capacity. The turbines and generators are stored in an underground power house measuring 198.7 metres (652 ft) long, 21 metres (69 ft) wide and 47.7 metres (156 ft) high. After power is produced, the water is discharged back into the lower reservoir and the entire process can repeat.[2]

See also

[edit]