Jump to content

Thermal Power Plant Kalakote

Coordinates: 33°13′3.36″N 74°25′15.96″E / 33.2176000°N 74.4211000°E / 33.2176000; 74.4211000
From Wikipedia, the free encyclopedia

Thermal Power Plant Kalakote
Map
CountryIndia
LocationKalakote, Jammu and Kashmir
Coordinates33°13′3.36″N 74°25′15.96″E / 33.2176000°N 74.4211000°E / 33.2176000; 74.4211000
StatusClosed
Construction began1963
Commission date1968
Decommission date1987
OwnersPower Development Department Jammu and Kashmir
Thermal power station
Primary fuelCoal
Power generation
Units operational2 × 350 KW
Nameplate capacity22.5 MW

Thermal Power Plant Kalakote was the first coal-fired power station of North India. It is located in the Kalakote town of Rajouri district in the Indian union territory of Jammu and Kashmir.[1]

History

[edit]

Kalakote was a coal rich tehsil with coals mines in different regions of tehsil including Moghla, Metka and Chokkar.[2] To utilize the coal resources, Power Development Department of government of union territory (state then) of Jammu and Kashmir in collaboration with Energoinvest decided to open a power plant in Sair (now Kalakote town) area of Kalakote tehsil. On May 23, 1963, Bakshi Ghulam Mohammad laid the first stone of power plant. With the starting of power plant in 1964, to handle the influx, many shops, hotels, theatres and colonies were settled up.[3]

Commissioning

[edit]

The commissioning of the project was started on trial basis from November 1, 1968. After 3rd commissioning in 1987, the plant held ceased to function. The thickness of the coal of Kalakote coal mines range from 0.15 meters to 0.75 meters in upper coal and between 0.50 meter to 1.5 meter in lower coal with fifty percent ash content, the deposits are neither uniform nor of the required quality in terms of ash content and seam thickness and because of these reasons plant was decided to close on 1989.[4]


After closure

[edit]

The development done due to plant played an important role in the development of Kalakote town. Even after being decommissioned, the government is still spending 1.1 million rupees every year for salaries of around 250 workers of plant.[5] After the closure, there have been reports of theft of iron and machinery parts from plant several times.[6]

See also

[edit]

References

[edit]
  1. ^ * "Thermal Power Plant at Kalakote". Rajouri district. Retrieved 10 March 2023.
  2. ^ "Coal Resources and Its Prospects in Jammu and Kashmir" (PDF). International Journal of Science and Research. Retrieved 10 March 2023.
  3. ^ "Kalakote thermal power station". Testbook. Retrieved 10 March 2023.
  4. ^ "Energy Beyond Water". Kashmir Life. Retrieved 10 March 2023.
  5. ^ * "1000 mw thermal power project coming up in Kathua". Daily Excelsior. Retrieved 10 March 2023.
  6. ^ "Vehicle seized with material of Thermal power plant". Daily Excelsior. Retrieved 10 March 2023.