Jump to content

Talk:Sydney–Melbourne rail corridor

Page contents not supported in other languages.
From Wikipedia, the free encyclopedia

Added 9.5km to Melbourne-Albury distance

[edit]

I have added 9.5km to the Melbourne-Albury and therefore Melbourne-Sydney distances, as the current route length is taken via Essendon which is the old broad gauge route! Check out the 9.5km jump back after Tullamarine loop:

http://vicsig.net/infrastructure/line/North-East-SG —Preceding unsigned comment added by 124.180.91.246 (talk) 11:05, 13 May 2010 (UTC)[reply]

Slowest trip?

[edit]

If the slowest trip takes 10.5 hours, how is it that the others take 11? Is this a typo or silliness? Music3149 (talk) 06:57, 22 July 2017 (UTC)[reply]

Request for comment on terminologies

[edit]

Please comment on some proposals potentially affecting "rail corridor" articles »» here. Cheers, SCHolar44 🇦🇺 💬  at 23:58, 13 August 2020 (UTC)[reply]