Talk:Frank & Seder Building (Detroit)
Appearance
This is the talk page for discussing improvements to the Frank & Seder Building (Detroit) article. This is not a forum for general discussion of the article's subject. |
Article policies
|
Find sources: Google (books · news · scholar · free images · WP refs) · FENS · JSTOR · TWL |
This article is rated Start-class on Wikipedia's content assessment scale. It is of interest to the following WikiProjects: | |||||||||||||||||||||||||||||||
|
Further development
[edit]Not sure how much detail to go into regarding the various Frank & Sader building occupancy & renovations, so I'll list here.
- In 1999, credit card processing firm Cardworks assumed one floor of the Pittsburgh Smithfield F&S building, followed by a second floor, with an option on a third.[1] In July 2012, the six-story store was under consideration for extensive remodeling, or replacement by a high-rise tower development.[2]
- ^ Lindeman, Teresa F. (March 19, 2012). "Card manager to add 200 Downtown jobs". Pittsburgh Post-Gazette.
- ^ Rosenblum, Charles (July 18, 2012). "Weighing two redevelopment options for the same parcel of Downtown land". Pittsburgh City Paper.
--Lexein (talk) 14:40, 3 August 2012 (UTC)