Talk:Blythe Mesa Solar Power Project
Appearance
This article is rated Start-class on Wikipedia's content assessment scale. It is of interest to the following WikiProjects: | |||||||||||||||||||||||||||||||||||||
|
Past tense
[edit]Even the NREL Web page looks abandoned. The project looks like it is completely dead. The article probably should be edited to put everything in the past tense. — QuicksilverT @ 19:32, 26 March 2013 (UTC)
- According to this source the project was bought by NextEra and goes through redesigning. However, it seems that there is no current activities to report. The article should be updated and probably past tense should be used, at least in most of cases. Beagel (talk) 09:52, 27 March 2013 (UTC)
Categories:
- Start-Class energy articles
- Mid-importance energy articles
- Start-Class California articles
- Low-importance California articles
- Start-Class Inland Empire articles
- Low-importance Inland Empire articles
- Inland Empire task force articles
- Start-Class Southern California articles
- Low-importance Southern California articles
- Southern California task force articles
- WikiProject California articles
- Start-Class Environment articles
- Unknown-importance Environment articles