Talk:A5 (Croatia)/GA1
Appearance
GA Review
[edit]GA toolbox |
---|
Reviewing |
Article (edit | visual edit | history) · Article talk (edit | history) · Watch
Reviewer: 12george1 (talk · contribs) 01:44, 29 November 2011 (UTC)
- "across Sava and Drava rivers as the motorway is extended south and north respectively." - switch to "across Sava and Drava rivers as the motorway extends south and north respectively."
- "There are 4 exits and 4 rest areas operating along the route." - Per MoS standards, some numbers less than 10 should be spelled out; this not not include the road numbers (e.g. A5), units of measure, dates (e.g. December 1), units of measure, or non-whole numbers.
- "will include the A5, and its completion will will highlight the importance of the A5 motorway." - Double word
- "Toll collection systems along the A5 and A3 are unified; vehicles switching from one motorway to the other at Sredanci, for example, do not pass toll plazas at the interchange." - Unsourced
- "directions of the motorway and operate 24 hours a day, 7 days a week." - 7 should be spelled out
- On reference #7, move the page numbers to the Page parameter to the cite web template.
- Thank you very much for reviewing the article. I found your comments constructive and helpful in terms of improving the article. I believe all of the above are addressed satisfactorily by now.--Tomobe03 (talk) 10:58, 29 November 2011 (UTC)
- Good work on this article. I am satisfied with this article at this point in time. Therefore, I am going to passing this GAN.--12george1 (talk) 03:27, 30 November 2011 (UTC)
- Thank you very much for reviewing the article. I found your comments constructive and helpful in terms of improving the article. I believe all of the above are addressed satisfactorily by now.--Tomobe03 (talk) 10:58, 29 November 2011 (UTC)