Pingshanwei station
Chinese name | ||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
General information | ||||||||||||||||
Location | Intersection of Pingshan Boulevard and Shenxian Road, Pingshan District, Shenzhen, Guangdong China | |||||||||||||||
Coordinates | 22°41′38″N 114°20′19″E / 22.6940°N 114.3387°E | |||||||||||||||
Operated by | SZMC (Shenzhen Metro Group) | |||||||||||||||
Line(s) | ||||||||||||||||
Platforms | 4 (2 island platforms) | |||||||||||||||
Tracks | 4 | |||||||||||||||
Construction | ||||||||||||||||
Structure type | Underground | |||||||||||||||
Accessible | Yes | |||||||||||||||
History | ||||||||||||||||
Opened | October 28, 2022 December 28, 2022 (Line 16) | (Line 14)|||||||||||||||
Services | ||||||||||||||||
|
Pingshanwei station (Chinese: 坪山围站; pinyin: Píngshānwéi Zhàn) is an interchange station for Line 14 and Line 16 of the Shenzhen Metro. It is located in Pingshan District.[1] Line 14 platforms is opened on 28 October 2022 and Line 16 platforms opened on 28 December 2022.[2] [3]
History
[edit]In July 2017, the National Development and Reform Commission of the People's Republic of China approved the Fourth Phase Construction Plan of Shenzhen Urban Rail Transit (2017-2022). Shenzhen Metro Line 14 and Shenzhen Metro Line 16 were approved for construction, of which Pingshanwei Station is a transfer station for two lines.[4]
In December 2018, the station floor of Pingshanwei Station Line 16 entered the main structure construction stage.[5]
On May 15, 2020, the diaphragm wall of the main enclosure structure of Pingshanwei Line 16 station floor was completed.[6]
In May 2021, the main structure of the station floor of Line 14 and Line 16 of Pingshanwei Station will be capped.
On April 22, 2022, Shenzhen Municipal People's Government approved the Plan for Station Names of Relevant Lines of Shenzhen Rail Transit Phase IV, and the station was named 'Pingshanwei Station'.[7] In September, Pingshanwei Station passed the fire acceptance. On October 28, Pingshanwei Station was put into operation with the opening of Shenzhen Metro Line 14 Phase I Project.
On October 28, 2022, the station was opened together with Shenzhen Metro Line 14.
On December 28, 2022, Line 16 station opened.[8][9][10]
Station layout
[edit]G | - | Exit |
B1F Concourse |
Lobby | Customer Service, Shops, Vending machines, ATMs |
B2F Platforms |
Platform | 14 towards Gangxia North (Jinlong) |
Island platform, doors will open on the left | ||
Platform | 14 towards Shatian (Pingshan Square) | |
B3F Platforms |
Platform | 16 towards Universiade (Liuhe) |
Island platform, doors will open on the left | ||
Platform | 16 towards Tianxin (Pinghuan) |
Exits
[edit]Pingshanwei station has eight exits. Before Line 16 opened, the station only opened Exit A and Exit B.
Gallery
[edit]-
Concourse
-
Line 16 platforms
-
Transfer passageway
References
[edit]- ^ "地铁14号线开通后 坪山这些轨道将"上新"". 腾讯网. 2022-10-31.
- ^ ""两线三枢纽"开通!深圳首条地铁14号线今日正式迎客". 2022-10-28.
地铁14号线起于岗厦北枢纽,延伸至沙田站,线路全长50.34公里
- ^ "深圳地铁16号线28日开通运营 城市轨道交通线网规模达559公里". news.southcn.com.
- ^ "国家发展改革委关于深圳市城市轨道交通第四期建设规划(2017-2022年)的批复". (in Chinese) 国家发展改革委. Retrieved 2017-07-07.
- ^ "16号线坪山围站开启主体结构施工 将建成坪山最大最美换乘站". (in Chinese) 深圳新闻网. 2022-10-28.
- ^ "深圳地铁16号线进展再更新!设站24座 预计2023年建成通车". (in Chinese) 深圳新闻网. 2020-05-27.
- ^ "关于《深圳市轨道四期相关线路站名规划》批准方案的公告". (in Chinese) 深圳政府在线. Retrieved 2022-04-22.
- ^ "深圳地铁16号线28日开通运营 城市轨道交通线网规模达559公里". news.southcn.com (in Simplified Chinese). Archived from the original on 2023-12-04. Retrieved 2024-07-06.
- ^ "Automated Line 16 serves Shenzhen's eastern suburbs". Metro Report International. 2023-01-12. Retrieved 2024-07-06.
- ^ "Shenzhen Metro opens Line 16". International Railway Journal. 2023-01-04. Archived from the original on 2023-04-24. Retrieved 2024-07-06.
External links
[edit]- Shenzhen Metro official page (Chinese)
- Shenzhen Metro official page (English)
- Street map
- Shenzhen Metro official page (Chinese)
- Shenzhen Metro official page (English)
- Street map