Jump to content

Kengzi station

Coordinates: 22°44′53″N 114°21′58″E / 22.74795°N 114.36606°E / 22.74795; 114.36606
From Wikipedia, the free encyclopedia
Kengzi

坑梓
Shenzhen Metro
Exit B
General information
LocationKengzi Subdistrict [zh], Pingshan District, Shenzhen, Guangdong
China
Coordinates22°44′53″N 114°21′58″E / 22.74795°N 114.36606°E / 22.74795; 114.36606
Operated bySZMC (Shenzhen Metro Group)
Line(s)     Line 14
Platforms2 (1 island platform)
Tracks2
Construction
Structure typeUnderground
AccessibleYes
History
Opened28 October 2022
Services
Preceding station SZM Shenzhen Metro Following station
Pingshan Center Line 14 Shatian
Terminus

Kengzi station (Chinese: 坑梓站; pinyin: Kēngzǐ Zhàn) is a station on Line 14 of Shenzhen Metro in Shenzhen, Guangdong, China, which is opened on 28 October 2022.[1][2][3] It is located at the east of the intersection of Pingshan Avenue and Guangzu North Road, Kengzi Subdistrict [zh], Pingshan District. The station lies east-west along Pingshan Avenue.

History

[edit]

In March 2018, Shenzhen Metro Group Co., Ltd. released the Environmental Impact Report of Shenzhen Urban Rail Transit Line 14 Project, which includes this station.[4]

On April 22, 2022, Shenzhen Municipal Bureau of Planning and Natural Resources issued the Announcement on the Approval Scheme of Shenzhen Rail Transit Phase IV Station Name Plan, in which the station will continue to use the name, Kengzi Station.[5]

The station's main structure was topped out on 28 August 2020, making it the fourth station on Shenzhen Metro Line 14 to be topped out.[6]

On October 28, 2022, the station was opened together with Shenzhen Metro Line 14.[7]

Station layout

[edit]

The station has an area of 17,312 square meters.[6]

G - Exit
B1F
Concourse
Lobby Customer Service, Shops, Vending machines, ATMs
B2F
Platforms
Platform arrow for L 14 towards Gangxia North (Pingshan Center)
Island platform, doors will open on the left
Platform arrow for R 14 towards Shatian (Terminus) arrow for R

Exits

[edit]

Kengzi station has four exits,[6] of which Exit A and C are equipped with elevators and Exit C is equipped with toilets.

Exits Picture of exit Picture of elevator Destination
South side of Pingshan Blvd(W), East side of Guangzu North Road, Pingshan District Kengzi Sub-district Office, Pingshan District Guangzu Middle School
Not applicable South side of Pingshan Blvd(E), West side of Zixing Road, Jintian Fenghuayuan
North side of Pingshan Blvd(E), Longtian House
Not applicable North side of Pingshan Blvd(W), East side of Longxing South Road, Pingshan District Maternity & Child Healthcare Hospital

Location

[edit]

The station is on Pingshan Avenue, Pingshan District, Shenzhen.[6] It is near Guangzu Middle School (光祖中学), Kengzi Central Primary School (坑梓中心小学), Pingshan District Maternal and Child Hospital (坪山区妇幼保健院), and Pingle Bone Trauma Hospital (平乐骨伤科医院).[8]

References

[edit]
  1. ^ ""两线三枢纽"开通!深圳首条地铁14号线今日正式迎客". 2022-10-28. 地铁14号线起于岗厦北枢纽,延伸至沙田站,线路全长50.34公里
  2. ^ "深圳地铁14号线今日开通,便民"黑科技"上岗". (in Chinese) 光明网. 2022-10-28.
  3. ^ "深圳地铁14号线坑梓站:坪山坑梓中心,坐拥高端教育与医疗配套!_坑梓街道". 2021-09-08. Retrieved 2022-12-08.
  4. ^ "深圳市轨道交通14号线工程环境影响报告书(公示版)" (PDF). (in Chinese) Shenzhen Metro. Retrieved 2018-03-01.
  5. ^ "关于《深圳市轨道四期相关线路站名规划》批准方案的公告". (in Chinese) 深圳政府在线. Retrieved 2022-04-22.
  6. ^ a b c d "14号线坪山段车站全部封顶!预计2022年建成通车". 深圳新闻网. Retrieved 9 December 2022.
  7. ^ "深圳地铁14号线坑梓站介绍". 2022-08-15. Retrieved 2022-12-08.
  8. ^ "今年通车,坪山"11号线"来袭,沿线地铁盘最低"2字头"起?". 界面新闻. Retrieved 9 December 2022.
[edit]