NTPL Thermal Power Station
Appearance
NTPL Thermal Power Station | |
---|---|
Country | India |
Location | Harbour Estate, Thoothukudi, Tamil Nadu |
Coordinates | 8°45′32″N 78°10′54.8″E / 8.75889°N 78.181889°E |
Status | Operational |
Commission date | Unit 1: March 2012 Unit 2: August 2012 |
Operators | TANGEDCO, NLC India Limited |
Thermal power station | |
Primary fuel | Coal |
Power generation | |
Units operational | 2 X 500 MW |
Nameplate capacity | 1000 MW |
External links | |
Website | www |
NTPL Thermal Power Station is a 1000 MW (2×500 MW) coal-based thermal plant in the Tuticorin District of Tamil Nadu. The project is a joint venture of TANGEDCO and NLC India Limited. The units were commissioned in March and April 2015, respectively.[1]
References
[edit]- ^
- Broad Status Report, Archived 2012-05-10 at the Wayback Machine India Central Electrical Authority, February 2015
- "It is a victory for people of Uttara Kannada district: Hanakon plant shifted to Tuticorin", Deccan Herald, January 2, 2010.