M12 (Istanbul Metro)
M12 60. Yıl Parkı-Kazım Karabekir | |
---|---|
Overview | |
Status | Under Construction |
Owner | Istanbul Metropolitan Municipality |
Locale | Istanbul, Turkey |
Termini |
|
Stations | 11 |
Service | |
Type | Rapid transit |
System | Istanbul Metro |
Services | 1 |
Operator(s) | Metro İstanbul A.Ş. |
History | |
Planned opening | 2025 |
Technical | |
Line length | 13.03 km (8.10 mi) |
Number of tracks | 2 |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge |
Electrification | 1,500 V DC Overhead line |
Line M12, officially referred to as the M12 60. Yıl Parkı-Kazım Karabekir line, is a proposed rapid transit line of the Istanbul Metro system, currently under construction in the Asian part of Istanbul, Turkey.
Built by the Metropolitan Municipality of Istanbul, the line will be 13.03 km (8.10 mi) long with 11 stations. The travel time between the end stations will be 26 minutes. It is expected that it will carry hourly around 35,000 riders in one direction. The line will run through three districts of Istanbul, namely Kadıköy, Ataşehir and Ümraniye. It will connect to other rapid transit lines at Tütüncü Mehmet Efendi station to Marmaray, at Yenisahra to M4 Kadıköy–Sabiha Gökçen Airport, and at Çarşı to M5 Üsküdar–Çekmeköy.[1]
The investment budget of the construction is ₺ 2.376 billion.[2] The construction of the metro began with work at the end station 60. Yıl Parkı in August 2017.[1] The tender of this project was canceled on 3 January 2018.[3]
The new mayor Ekrem İmamoğlu announced that the metropolitan municipality restarted the construction works. The line is expected to be operational in second half of 2025.
Stations
[edit]No | Station | District | Connections | Type | Notes |
---|---|---|---|---|---|
1 | 60. Yıl Parkı | Kadıköy | İETT Bus: 4, 16, 16D, ER1, ER2, FB1, FB2, GZ1, GZ2 | Underground | Göztepe Park・Caddebostan・Bağdat Avenue |
2 | Tütüncü Mehmet Efendi | (Göztepe) İETT Bus: 4, 16, 16D, ER1, ER2, FB1, FB2, GZ1, GZ2 |
Tütüncü Mehmet Efendi Street | ||
3 | Sahrayıcedit | İETT Bus: 2, 8E, 9K, 10B, 10E, 10G, 14AK, 14B, 14CE, 14ES, 14Y, 14ÇK, 14ŞB, 15SK, 15YK, 15ÇK, 17, 17L, 19ES, 19F, 19K, 19M, 19S, 19Y, 20D, 20K, ER1, ER2, FB1, FB2, GZ1, GZ2 | Sahrayıcedit Mosque・Fahrettin Kerim Gökay Street | ||
4 | Yenisahra | Ataşehir | İETT Bus: 8A, 8Y |
Habire Yahşi Anatolian High School | |
5 | Ataşehir[a] | İETT Bus: 8A, 8K, 8Y, 10A, 13, 13AB, 16M, 19FS, 256, KM46 | Ülker Sports and Event Hall・Palladium Shopping Mall | ||
6 | Finans Merkezi | Ümraniye | (Finanskent)・ İETT Bus: 8K, 8Y, 11M, 13B, 13H, 13M, 13Y, 14BK, 19FS, 20D |
Finance Center | |
7 | Site | İETT Bus: 8K, 8Y, 11M, 13B, 13H, 13M, 19FS, 20D | SOYAK Yenisehir Sites | ||
8 | Atakent | İETT Bus: 9A, 10G, 11M, 13AB, 14B, 20Ü | İstiklal Martyr Lokman Oktay Secondary School・Istiklal Park | ||
9 | Çarşı | İETT Bus: 9A, 9Ç, 9Ş, 9Ü, 9ÜD, 10, 11D, 11G, 11K, 11P, 11V, 13, 13B, 13H, 13TD, 14, 14B, 14DK, 14E, 14ES, 14K, 14YE, 19D, 20, 131, 131A, 131B, 131C, 131T, 131TD, 131YS, 131Ü, 138, 139, 139A, 320, 522 |
Ümraniye Bazaar・Alemdağ Street | ||
10 | SBÜ Hastanesi | İETT Bus: 7, 9, 9K, 9T, 10, 10G, 11, 11A, 11ÇB, 11K, 11P, 11ST, 11ÜS, 13H, 14D, 14E, 14K, 14YK, 15B, 15BK, 15TK, 15TY, 20, 20K, MR9 | Ümraniye Municipality & District Governorate・Istanbul 29 May University Ümraniye Campus・Ümraniye Training & Research Hospital | ||
11 | Kâzım Karabekir | İETT Bus: 7, 11K, 11ST, 14E, 14K, 15B, 15YK 20K | Adem Yavuz Street・Seyrantepe Street |
Notes
[edit]References
[edit]- ^ a b "Ümraniye- Ataşehir- Göztepe metro hattı çalışmaları başladı". NTV Turkey (in Turkish). 2017-08-12. Retrieved 2017-08-13.
- ^ "Metro hattının detayları kesinleşti!". Yeni Akit (in Turkish). Retrieved 2017-08-13.
- ^ "6 metro projesinde ihale iptali". Milliyet (in Turkish). Retrieved 2018-01-03.