List of power stations in New South Wales
This is a list of active power stations in New South Wales, Australia. Candidates for this list must already be commissioned and capable of generating 1 MW or more of electricity.
Solar
[edit]Power station | Max. capacity (MW) | Operator | Technology | Completion date | Notes |
---|---|---|---|---|---|
Moree Solar Farm | 56 | Fotowatio Renewable Ventures | Photovoltaic | 2016 | |
Beryl Solar Farm | 87 | New Energy Solar / First Solar | Photovoltaic | 2019 | 110.9 MW DC, 87 MW AC[1][2] |
Finley Solar Farm | 133 | ESCO Pacific / John Laing | Photovoltaic | 2019 | 175MW DC, 133 MW AC[3][4] |
Royalla Solar Farm | 20 | Acciona | Photovoltaic | 2014 | |
Nyngan Solar Plant | 102 | AGL Energy | Photovoltaic | 2016 | |
Broken Hill Solar Plant | 53 | AGL Energy | Photovoltaic | 2016 | |
Mugga Lane Solar Park, Canberra, ACT | 13 | Maoneng | Photovoltaic | 2017 | |
Gullen Range Solar Farm | 10 | Goldwind Australia | Photovoltaic | 2017 | |
Mount Majura Solar Farm Majura, ACT | 2.3 | Solar Choice | Photovoltaic | 2016 | Co-developed by Solar Choice and Solar Fields[5] |
Williamsdale Solar Farm Williamsdale, ACT | 11 | ActewAGL | Photovoltaic | 2017 | |
Coleambally Solar Farm | 150 | Neoen | Photovoltaic | 2018 | Started full scale operations as of 19 October 2018. Production had ramped up over the preceding months.[6] |
Parkes Solar Farm | 55 | Neoen | Photovoltaic | 2018 | 55MW AC, 66MW DC.[7] Farm was operating at full capacity as of March 2018.[8] |
Griffith Solar Farm | 36 | Neoen | Photovoltaic | 2018 | |
Manildra Solar Farm | 48.5 | First Solar | Photovoltaic | 2018 | |
White Rock Solar Farm | 20 | Goldwind Australia | Photovoltaic | 2018 | |
Jemalong CSP Pilot Plant | 1.1 | Vast Solar | Thermal | 2017 | |
Jemalong Solar Farm | 50 | Genex Power | Photovoltaic | 2021 | Developed to approval by Vast Solar, then acquired by Genex Power on 7 September 2018[9] |
Coal fired
[edit]These fossil fuel power stations burn bituminous coal to power steam turbines that generate some or all of the electricity they produce.
Power station | Max. capacity (MW) | CO2 emissions (tCO2e) | Emission intensity (tCO2e/MWh) | Turbines | Operator | Mine type | Conveyance | Cooling water | Scheduled closure[10] |
---|---|---|---|---|---|---|---|---|---|
Bayswater | 2,640 | 13,725,965[11] | 0.88 [11] | 4 | AGL Energy | open cut | conveyors, rail | fresh | 2035 |
Eraring | 2,880 | 14,914,916[11] | 0.87 [11] | 4 | Origin Energy | underground | rail, truck | salt | 19 August 2027 |
Mount Piper | 1,400 | 6,841,302[11] | 0.87 [11] | 2 | EnergyAustralia | underground | road, conveyor | fresh | 2040 |
Vales Point B | 1,320 | 7,015,626[11] | 0.86 [11] | 2 | Delta Electricity | underground | conveyors | salt | 2028 |
- In 2007 Delta Electricity re-rated the two units at Mt Piper at 700 MW capacity.[clarification needed]
- In February 2022, Origin Energy announced plans to bring forward the closure of Eraring to 2025, pending approval by the Australian Energy Market Operator.[12]
Gas turbine
[edit]These fossil fuel power stations are fired with gas or liquid fuels to produce electricity by use of a gas turbine.
Power station | Operator | Max. capacity (MW) | Emission intensity (tCO2e/MWh) | Turbines | Fuel type | Combined cycle |
---|---|---|---|---|---|---|
Colongra | Snowy Hydro | 667 | 0.56[11] | 4 | natural gas | no |
Tallawarra | EnergyAustralia | 435 | 0.37[11] | 2 | natural gas | yes |
Smithfield | Visy[13] | 171 | 0.49[11] | 4 | natural gas | no |
Uranquinty | Origin Energy | 641 | 0.60[11] | 4 | natural gas | no |
Gas reciprocating engines
[edit]These power stations use gas combustion in reciprocating engines to generate some or all of the electricity they produce.
Power station | Max. capacity (MW) | Emission intensity (tCO2e/MWh) | Engines | Fuel type |
---|---|---|---|---|
Appin Mine | 55.6 | 0.73[11] | 54 | coalbed methane+natural gas |
Belrose | 4 | 0.08[11] | 1 | landfill gas |
Earthpower Camellia | 3.9 | 3 | biogas | |
Jacks Gully | 2.3 | 0.06[11] | 1 | landfill gas |
Lucas Heights I | 5.4 | 0.06[11] | 5 | landfill gas |
Lucas Heights II | 17.3 | 0.06[11] | 15 | landfill gas |
Sydney Water, Malabar | 3 | 3 | sewage gas | |
Shoalhaven Landfill Gas Project | 1 | 0.05[11] | 1 | landfill gas |
Tahmoor [1] | 7 | 0.57[11] | 7 | coalbed methane |
Teralba | 8 | 8 | coalbed methane | |
Tower Mine | 41.2 | 40 | coalbed methane+natural gas | |
Wilga | 11 | 0.59[11] | 11 | natural gas |
Woodlawn | 4 | 4 | landfill gas | |
Kincumber Landfill Gas Abatement [14] | 1 | 0.07[11] | 1 | landfill gas |
Woy Woy Landfill Gas Abatement [14] | 1 | 0.06[11] | 1 | landfill gas |
Hydroelectric
[edit]These hydroelectric power stations use the flow of water to generate electricity.
Power station | Max. capacity (MW) | Turbines | Pumped storage |
---|---|---|---|
Bendeela (Shoalhaven) | 80 | 2 | yes |
Blowering | 80 | 1 | no |
Brown Mountain | 4.95 | 2 | no |
Burrendong | 14.5 | 1 | no |
Burrinjuck | 27 | 3 | no |
Copeton | 24 | 1 | no |
Glenbawn | 5.8 | 1 | no |
Guthega | 60 | 2 | no |
Hume | 58 | 2 | no |
Kangaroo Valley (Shoalhaven) | 160 | 2 | yes |
Keepit | 7.2 | 1 | no |
Kembla Grange | 6.8 | 2 | no |
Murray 1 | 950 | 10 | no |
Murray 2 | 550 | 4 | no |
Nymboida | 5 | 7 | no |
Oaky River | 12 | 5 | no |
Pindari | 5.6 | 2 | no |
Snowy 2.0 | 2000 | 6 | yes |
The Drop, Mulwala Canal | 2.5 | 1 | no |
Tumut 1 | 330 | 4 | no |
Tumut 2 | 287 | 4 | no |
Tumut 3 | 1500 | 6 | yes |
Warragamba | 50 | 1 | no |
Williams River Dam (private) | 7 | 1 | no |
Wyangala | 22.5 | 2 | no |
Wind farms
[edit]Biomass combustion
[edit]These power stations burn biomass (biofuel) to generate some or all of the electricity they produce.
Power station | Max. capacity (MW) | Turbines | Fuel type | Conveyance |
---|---|---|---|---|
Broadwater Sugar Mill | 10 | 1 | bagasse | on-site |
Broadwater Biomass Co-Gen | 30 | 1 | bagasse/wood waste | on-site & truck |
Condong Sugar Mill | 3 | 1 | bagasse | on-site |
Condong Biomass Co-Gen | 30 | 1 | bagasse/wood waste | on-site & truck |
Harwood Sugar Mill | 4.5 | 3 | bagasse | on-site |
Visy, Tumut | 21 | 1 | black liquor | on-site |
Cogeneration
[edit]These power stations capture waste heat to generate some or all of the electricity they produce via cogeneration.
Power station | Max. capacity (MW) |
---|---|
Amcor, Bomaderry | 6 |
BlueScope, Port Kembla | 62 |
Macquarie University | 1.5 |
Stadium Australia | 1 |
University of Western Sydney | 1 |
Visy, Smithfield | 6 |
Decommissioned coal-fired stations
[edit]Power station | Max. capacity (MW) | Turbines | Coal type | Mine type | Conveyance | Cooling water |
---|---|---|---|---|---|---|
Balmain | 126.2 | 8 | bituminous | N/A | ship / lighter | salt |
Bunnerong | 375 | 11 | bituminous | N/A | railway | salt |
Liddell | 2051 | 7 | bituminous | open cut | conveyors | fresh |
Lithgow | 38 | 4 | bituminous | open cut | railway | fresh |
Munmorah | 1,400 | 4 | bituminous | underground | conveyors | salt |
Newcastle East | 70.75 | 6 | bituminous | N/A | railway | salt |
Pyrmont | 200 | 4 | bituminous | N/A | railway | salt |
Redbank | 150 | 1 | bituminous (tailings) | open cut | conveyors | fresh |
Ultimo | 79.5 | 6 | bituminous | N/A | railway | salt |
Wallerawang | 1,240 | 2 | bituminous | underground | road, conveyor | fresh |
Wangi | 330 | 6 | bituminous | underground | conveyor | fresh |
White Bay | 100 | 2 | bituminous | N/A | railway | salt |
See also
[edit]References
[edit]- ^ Parkinson, Giles (24 June 2019). "Beryl solar farm reaches full output after single month of commissioning". RenewEconomy. Retrieved 18 November 2019.
- ^ "Beryl Solar Plant". New Energy Solar. 25 July 2018. Retrieved 18 November 2019.
- ^ "Project Details". Finley Solar Farm. Retrieved 18 November 2019.
- ^ Vorrath, Sophie (7 August 2019). "Finley solar farm starts sending power to NSW grid". RenewEconomy. Retrieved 18 November 2019.
- ^ "Mount Majura Solar Farm powers up in ACT". 11 October 2016.
- ^ "Full Scale Operations Commencing – Coleambally Solar Farm". coleamballysolarfarm.com.au. Retrieved 24 November 2018.
- ^ "NSW's solar bonanza about to become reality - Australian Renewable Energy Agency". Australian Renewable Energy Agency. 1 February 2017. Retrieved 26 November 2018.
- ^ "Parkes Solar Farm". parkessolarfarm.com.au. Retrieved 26 November 2018.
- ^ "Jemalong 60MW(DC) Solar Photovoltaic (PV) Project". Vast Solar. Retrieved 24 April 2021.
- ^ "Transmission Annual Planning Report" (PDF). 2018. p. 11. Retrieved 21 September 2018.
- ^ a b c d e f g h i j k l m n o p q r s t u v "Electricity sector emissions and generation data 2017–18". www.cleanenergyregulator.gov.au. Retrieved 22 September 2019.
- ^ "Australia's biggest coal power plant to close as its economics become 'unsustainable'". ABC News. 16 February 2022. Retrieved 17 February 2022.
- ^ "Packager Visy sparks power plant auction, tests buyer appetite". Australian Financial Review. Fairfax Media. 21 May 2018. Retrieved 10 August 2018.
- ^ a b "Hallett Wind Farms | About AGL".
External links
[edit]- NEMMCO List of Generators[permanent dead link] (xls)
- NSW Statement of System Opportunities (pdf)
- NSW Statement of System Opportunities Map (pdf)
- List of Green Power approved generators (pdf)
- Australian Business Council for Sustainable Energy
- BCSE Renewable Energy Power Plant Register 2006 (pdf)
- Map of Power Station Locations in the NEM