Jump to content

List of major power stations in Sichuan

From Wikipedia, the free encyclopedia

3*140 This page lists the major power stations located in Sichuan Province.

Non-renewable

[edit]

Coal-based

[edit]
Station Name in Chinese Coordinates Capacity (MW) Operational units and (type) Under construction units Reference
Guang'an Power Station 广安电厂 30°31′40″N 106°49′34″E / 30.52778°N 106.82611°E / 30.52778; 106.82611 (Guang'an Power Station) 2,400 4*300MW, 2*600MW [1][2]
Tianming Power Station 天明电厂 31°52′12″N 104°54′35″E / 31.87000°N 104.90972°E / 31.87000; 104.90972 (Tianming Power Station) 2,000 2*1,000MW [3]
China Coal Energy Guangyuan Power Station 中煤广元电厂 2,000 2*1,000MW [4]
Jiangyou Power Station 江油电厂 31°48′17″N 104°46′10″E / 31.80472°N 104.76944°E / 31.80472; 104.76944 (Jiangyou Power Station) 1,260 2*300MW, 2*330MW [5]
Luzhou Power Station 泸州电厂 28°46′31″N 105°17′01″E / 28.77528°N 105.28361°E / 28.77528; 105.28361 (Luzhou Power Station) 1,200 2*600MW [6]
Jintang Power Station 金堂电厂 30°42′20″N 104°34′47″E / 30.70556°N 104.57972°E / 30.70556; 104.57972 (Jintang Power Station) 1,200 2*600MW [7]
Fuxi Power Station 福溪电厂 28°39′49″N 104°41′01″E / 28.66361°N 104.68361°E / 28.66361; 104.68361 (Fuxi Power Station) 1,200 2*600MW [8]
Gongxian Power Station 珙县电厂 28°16′08″N 104°40′26″E / 28.26889°N 104.67389°E / 28.26889; 104.67389 (Gongxian Power Station) 1,200 2*600MW [9]
Baima Power Station 白马电厂 29°31′30″N 105°00′47″E / 29.52500°N 105.01306°E / 29.52500; 105.01306 (Baima Power Station) 600 1*600MW
Huayinshan Power Station 华蓥山发电厂 30°53′31″N 107°03′03″E / 30.89194°N 107.05083°E / 30.89194; 107.05083 (Huayinshan Power Station) 600 2*300MW [10][11]

Gas-based

[edit]
Station Name in Chinese Coordinates Capacity (MW) Operational units and (type) Under construction units Reference
Ziyang Natural Gas Power Station 资阳燃气电厂 30°4′42″N 105°25′19″E / 30.07833°N 105.42194°E / 30.07833; 105.42194 (Ziyang Natural Gas Power Station) 1,400 2*700MW [12][13]
Guangyuan Natural Gas Power Station 广元燃机工程 32°22′23″N 105°43′13″E / 32.37306°N 105.72028°E / 32.37306; 105.72028 (Guangyuan Natural Gas Power Station) 1,400 2*700MW [14]
Luzhou Natural Gas Power Station 泸州燃机工程 28°46′45″N 105°17′7″E / 28.77917°N 105.28528°E / 28.77917; 105.28528 (Luzhou Natural Gas Power Station) 1,400 2*700MW [15]
Anju Natural Gas Power Station 安居燃气发电 1,400 2*700MW [16]
Dazhou Natural Gas Power Station 达州燃气电厂 31°06′54″N 107°29′05″E / 31.11500°N 107.48472°E / 31.11500; 107.48472 (Dazhou Natural Gas Power Station) 700 2*350MW

Renewable

[edit]

Hydroelectric

[edit]

The installed conventional hydropower capacity in Sichuan province has broken through 31,000MW in present.[17] By 2020, The hydropower installed capacity in Sichuan province will increase to over 90,000 MW, accounting for a quarter share of whole Chinese hydropower installed capacity.

Conventional

[edit]
Station Name in Chinese Coordinates River Total capacity (MW) Dam height (meters) Status Units Reference
Xiangjiaba Hydro Power Station 向家坝水电站 28°38′41″N 104°23′32″E / 28.64472°N 104.39222°E / 28.64472; 104.39222 (Xiangjiaba Hydro Power Station) Yangtze (Jinsha) 7,750 161 Operational 8*800MW, 3*450MW
Xiluodu Hydro Power Station 溪洛渡水电站 28°15′30″N 103°39′00″E / 28.25833°N 103.65000°E / 28.25833; 103.65000 (Xiluodu Hydro Power Station) Yangtze (Jinsha) 13,860 278 Operational 18*770MW
Baihetan Hydro Power Station 白鹤滩水电站 27°13′22″N 102°54′10″E / 27.22278°N 102.90278°E / 27.22278; 102.90278 (Baihetan Hydro Power Station) Yangtze (Jinsha) 16,000 289 Operational 16*1,000MW
Wudongde Hydro Power Station 乌东德水电站 26°19′28″N 102°38′03″E / 26.32444°N 102.63417°E / 26.32444; 102.63417 (Wudongde Dam) Yangtze (Jinsha) 10,200 270 Operational 12*850MW
Yinjiang Hydro Power Station 银江水电站  26°35′28″N 101°46′16″E / 26.59111°N 101.77111°E / 26.59111; 101.77111 (Yinjiang Dam) Yangtze (Jinsha) 390 73 Under construction 6*65MW [18]
Jinsha Hydro Power Station 金沙水电站 26°34′24″N 101°38′34″E / 26.57333°N 101.64278°E / 26.57333; 101.64278 (Jinsha Dam) Yangtze (Jinsha) 560 66 Operational 4*140MW [19]
Guanyinyan Hydro Power Station 观音岩水电站 26°31′13″N 101°26′15″E / 26.52028°N 101.43750°E / 26.52028; 101.43750 (Guanyinyan Hydro Power Station) Yangtze (Jinsha) 3,000 159 Operational 5*600MW
Tuoding Hydro Power Station 拖顶水电站 Jinsha 2,060 In prep
Rimian Hydro Power Station 日冕水电站 Jinsha 2,700 In prep
Baiqiu Hydro Power Station 白丘水电站 Jinsha 1,500 Proposed
Enan Hydro Power Station 俄南水电站 Jinsha 900 Proposed
Xulong Hydro Power Station 旭龙水电站 Jinsha 2,400 213 Under Construction 4*600MW [20]
Changbo Hydro Power Station 昌波水电站 Jinsha 826 45 Under Construction [21]
Suwalong Hydro Power Station 苏洼龙水电站 29°26′05″N 99°03′39″E / 29.43472°N 99.06083°E / 29.43472; 99.06083 (Suwalong Hydro Power Station) Jinsha 1,200 112 Operational 4*300MW [22]
Batang Hydro Power Station 巴塘水电站 Jinsha 750 69 Under Construction [23]
Lawa Hydro Power Station 拉哇水电站 30°05′14″N 099°02′26″E / 30.08722°N 99.04056°E / 30.08722; 99.04056 (Lawa Dam) Jinsha 2,000 239 Under Construction
Yebatan Hydro Power Station 叶巴滩水电站 Jinsha 2,440 217 Under Construction 4*510MW, 2*200MW [24]
Boluo Hydro Power Station 波罗水电站 Jinsha 960 134 Proposed 3*320MW [25]
Yanbi Hydro Power Station 岩比水电站 Jinsha 300 Proposed
Gangtuo Hydro Power Station 岗托水电站 Jinsha 1100 Proposed
Tongzilin Hydro Power Station 桐子林水电站 26°42′25″N 101°51′01″E / 26.70694°N 101.85028°E / 26.70694; 101.85028 (Tongzilin Hydro Power Station) Yalong 600 71.3 Operational 4*150MW
Ertan Hydro Power Station 二滩水电站 26°49′15″N 101°46′52″E / 26.82083°N 101.78111°E / 26.82083; 101.78111 (Ertan Hydro Power Station) Yalong 3,300 240 Operational 6*550MW [26]
Guandi Hydro Power Station 官地水电站 27°49′18″N 101°52′54″E / 27.82167°N 101.88167°E / 27.82167; 101.88167 (Guandi Hydro Power Station) Yalong 2,400 168 Operational 4*600MW
Jinping II Hydro Power Station 锦屏二级水电站 28°14′3″N 101°38′44″E / 28.23417°N 101.64556°E / 28.23417; 101.64556 (Jinping 2 Hydro Power Station Dam)Inlet 28°13′12″N 101°38′42″E / 28.22000°N 101.64500°E / 28.22000; 101.64500 (Jingping II, inlet), Outlet 28°08′16″N 101°47′32″E / 28.13778°N 101.79222°E / 28.13778; 101.79222 (Jingping II, outlet) Yalong 4,800 34 Operational 8*600MW
Jinping I Hydro Power Station 锦屏一级水电站 28°10′53″N 101°37′45″E / 28.18139°N 101.62917°E / 28.18139; 101.62917 (Jingping I Hydro Power Station) Yalong 3,600 305 Operational 6*600MW
Kala Hydro Power Station 卡拉水电站 28°24′05″N 101°16′37″E / 28.40139°N 101.27694°E / 28.40139; 101.27694 (Kala Hydro Power Station) Yalong 1,080 128 Under construction
Yangfanggou Hydro Power Station 杨房沟水电站 28°39′05″N 101°12′02″E / 28.65139°N 101.20056°E / 28.65139; 101.20056 (Yangfanggou Hydro Power Station) Yalong 1,500 158 Operational
Mengdigou Hydro Power Station 孟底沟水电站 28°56′54″N 101°10′47″E / 28.94833°N 101.17972°E / 28.94833; 101.17972 (Mendigou Power Station) Yalong 2,400 198 Under construction 4*600MW [27]
Lenggu Hydro Power Station 楞古水电站 29°24′58″N 101°08′29″E / 29.41611°N 101.14139°E / 29.41611; 101.14139 (Lenggu Hydro Power Station) Yalong 2,718 174 In prep
Yageng I Hydro Power Station 牙根一级水电站 30°05′25″N 101°00′17″E / 30.09028°N 101.00472°E / 30.09028; 101.00472 (Yageng I Hydro Power Station) Yalong 300 In prep 3*100MW [28]
Yageng II Hydro Power Station 牙根二级水电站 29°40′04″N 101°05′02″E / 29.66778°N 101.08389°E / 29.66778; 101.08389 (Yageng II Hydro Power Station) Yalong 990 In prep
Lianghekou Hydro Power Station 两河口水电站 30°11′40″N 101°00′35″E / 30.19444°N 101.00972°E / 30.19444; 101.00972 (Lianghekou Hydro Power Station) Yalong 4,200 293 Under Construction 6*500MW, 4*300MW [29]
Gongbagou Hydro Power Station 龚坝沟水电站 Yalong 500 Proposed
Gongke Hydro Power Station 共科水电站 Yalong 400 Proposed
Xinlong Hydro Power Station 新龙水电站 Yalong 500 Proposed
Yingda Hydro Power Station 英达水电站 Yalong 500 Proposed
Tongha Hydro Power Station 通哈水电站 Yalong 200 Proposed
Geni Hydro Power Station 格尼水电站 Yalong 200 Proposed
Ada Hydro Power Station 阿达水电站 Yalong 250 Proposed
Reba Hydro Power Station 热巴水电站 Yalong 250 Proposed
Renqingling Hydro Power Station 仁青岭水电站 Yalong 300 Proposed
Angu Hydro Power Station 安谷水电站 29°30′05″N 103°37′52″E / 29.50139°N 103.63111°E / 29.50139; 103.63111 (Angu Hydro Power Station) Dadu 772 40.7 Operational 4*190MW, 1*12 [30]
Shawan Hydro Power Station 沙湾水电站 29°20′05″N 103°36′38″E / 29.33472°N 103.61056°E / 29.33472; 103.61056 (Shawan Hydro Power Station) Dadu 480 Operational 4*120MW [31]
Tongjiezi Hydro Power Station 铜街子水电站 29°15′24″N 103°37′58″E / 29.25667°N 103.63278°E / 29.25667; 103.63278 (Tongjiezi Hydro Power Station) Dadu 600 82 Operational 4*150MW [citation needed]
Gongzui Hydro Power Station 龚嘴水电站 29°18′12″N 103°28′45″E / 29.30333°N 103.47917°E / 29.30333; 103.47917 (Gongzui Hydro Power Station) Dadu 770 85.5 Operational 7*110MW
Shaping II Hydro Power Station 沙坪二级水电站 29°14′12″N 103°12′28″E / 29.23667°N 103.20778°E / 29.23667; 103.20778 (Shaping II Hydro Power Station) Dadu 348 63 Operational 6*58MW
Shaping I Hydro Power Station 沙坪一级水电站 29°17′39″N 103°06′31″E / 29.29417°N 103.10861°E / 29.29417; 103.10861 (Shaping II Hydro Power Station) Dadu 360 Under construction 6*60MW [32]
Zhengtouba II Hydro Power Station 枕头坝二级水电站 29°14′09″N 103°04′40″E / 29.23583°N 103.07778°E / 29.23583; 103.07778 (Zhengtouba II) Dadu 300 Under construction
Zhengtouba I Hydro Power Station 枕头坝一级水电站 29°14′11″N 103°02′42″E / 29.23639°N 103.04500°E / 29.23639; 103.04500 (Zhengtouba I Hydro Power Station) Dadu 720 Operational 4*180MW
Yongle Hydro Power Station 永乐级水电站 Inlet 29°17′15″N 103°01′36″E / 29.28750°N 103.02667°E / 29.28750; 103.02667 (Yongle Hydro Power Station, inlet), Outlet 29°15′59″N 103°04′53″E / 29.26639°N 103.08139°E / 29.26639; 103.08139 (Yongle Hydro Power Station, outlet) Dadu 58 Operational
Shenxigou Hydro Power Station 深溪沟水电站 29°17′58″N 102°55′56″E / 29.29944°N 102.93222°E / 29.29944; 102.93222 (Shenxigou Hydro Power Station) Dadu 660 49.5 Operational 4×165MW
Pubugou Hydro Power Station 瀑布沟水电站 29°12′34″N 102°50′11″E / 29.20944°N 102.83639°E / 29.20944; 102.83639 (Pubugou Hydro Power Station) Dadu 3,600 186 Operational 6*600MW
Laoyingyan I Hydro Power Station 老鹰岩一级水电站 Dadu 300 In prep [33]
Laoyingyan II Hydro Power Station 老鹰岩二级

水电站

Dadu 420 Under construction 3*140MW [34]
Longtoushi Hydro Power Station 龙头石水电站 29°20′06″N 102°15′18″E / 29.33500°N 102.25500°E / 29.33500; 102.25500 (Longtoushi Hydro Power Station) Dadu 700 72.5 Operational 4*175MW
Dagangshan 大岗山水电站 29°26′54″N 102°13′10″E / 29.44833°N 102.21944°E / 29.44833; 102.21944 (Dagangshan) Dadu 2,600 210 Operational 4*650MW
Yingliangbao Hydro Power Station 硬梁包水电站 Inlet 29°44′18″N 102°12′13″E / 29.73833°N 102.20361°E / 29.73833; 102.20361 (Yingliangbao, inlet), Outlet 29°38′06″N 102°10′33″E / 29.63500°N 102.17583°E / 29.63500; 102.17583 (Yingliangbao, outlet) Dadu 1,160 (run-of-the-river, 15.1 km tunnel) Under construction 4*270MW, 1*36MW [35]
Luding Hydro Power Station 泸定水电站 29°56′47″N 102°13′37″E / 29.94639°N 102.22694°E / 29.94639; 102.22694 (Luding) Dadu 920 85.5 Operational 4*230MW
Huangjinping Hydro Power Station 黄金坪水电站 30°08′51″N 102°10′25″E / 30.14750°N 102.17361°E / 30.14750; 102.17361 (Huanjinping) Dadu 850 95.5 Operational 4*200MW, 2*25MW [36]
Changheba Hydro Power Station 长河坝水电站 30°15′43″N 102°11′43″E / 30.26194°N 102.19528°E / 30.26194; 102.19528 (Changheba Hydro Power Station) Dadu 2,600 240 Operational 4*650MW
Houziyan Hydro Power Station 猴子岩水电站 30°33′13″N 102°03′24″E / 30.55361°N 102.05667°E / 30.55361; 102.05667 (Houziyan Hydro Power Station) Dadu 1,700 223.5 Operational 4*425MW
Badi Hydro Power Station 巴底水电站 Dadu 680 112 Proposed
Jinchuan Hydro Power Station 金川水电站 31°35′09″N 102°04′39″E / 31.58583°N 102.07750°E / 31.58583; 102.07750 (Jinchuan Hydro Power Station) Dadu 860 111.5 Under construction 4*215MW
Shuangjiankou Hydro Power Station 双江口水电站 31°47′53″N 101°54′50″E / 31.79806°N 101.91389°E / 31.79806; 101.91389 (Shuangjiankou Hydro Power Station) Dadu 2,000 314 Under construction 4*500MW
Busigou Hydro Power Station 卜寺沟水电站 Dadu 360 130 Proposed
Dawei Hydro Power Station 达维水电站 Dadu 270 107 Proposed 2*135MW
Bala Hydro Power Station 巴拉水电站 32°15′26″N 101°36′35″E / 32.25722°N 101.60972°E / 32.25722; 101.60972 (Bala Hydro Power Station) Dadu 700 220 Under construction
Xiaerjia Hydro Power Station 下尔呷水电站 Dadu 540 Proposed
Kajiwa Hydro Power Station 卡基娃水电站 28°42′41″N 100°53′18″E / 28.71139°N 100.88833°E / 28.71139; 100.88833 (Kajiwa Hydro Power Station) Muli 452.4 171 Operational 4*110MW
Lizhou Hydro Power Station 立洲水电站 28°05′22″N 100°56′03″E / 28.08944°N 100.93417°E / 28.08944; 100.93417 (Lizhou Hydro Power Station) Muli 355 132.5 Operational 3*115MW, 1*10MW
Shangtongba Hydro Power Station 上通坝水电站 Muli 240 Operational 3*80MW
Muli Shawan Hydro Power Station 木里河沙湾水电站 Muli 280 Operational
Zipingpu Hydro Power Station 紫坪铺水电站 31°02′06″N 103°34′27″E / 31.03500°N 103.57417°E / 31.03500; 103.57417 (Zipingpu Hydro Power Station) Min 760 156 Operational 4*190MW
Taipingyi Hydro Power Station 太平驿水电站 31°13′33″N 103°29′11″E / 31.22583°N 103.48639°E / 31.22583; 103.48639 (Taipingyi Hydro Power Station) Min 260 Operational 4*65MW
Futang Hydro Power Station 福堂水电站 31°29′03″N 103°36′12″E / 31.48417°N 103.60333°E / 31.48417; 103.60333 (Futang Hydro Power Station) Min 360 Operational 4*90MW
Qianwei Hydro Power Station 犍为航电枢纽 29°14′18″N 103°55′19″E / 29.23833°N 103.92194°E / 29.23833; 103.92194 (Jianwei Hydro Power Station) Min 500.4 Operational 9*55.6MW
Longxikou Hydro Power Station 龙溪口航电枢纽 29°03′39″N 104°08′34″E / 29.06083°N 104.14278°E / 29.06083; 104.14278 (Longxikou Hydro Power Station) Min 480 Under Construction 9*53.3MW
Baozhusi Hydro Power Station 宝珠寺水电站 32°31′12″N 105°36′43″E / 32.52000°N 105.61194°E / 32.52000; 105.61194 (Baozhusi Hydro Power Station) Bailong 700 132 Operational 4*175MW
Qiaoqi Hydro Power Station 硗碛水电站 Baoxinghe 240 125 Operational 3*80MW
Yele Hydro Power Station 冶勒水电站 28°55′08″N 102°13′03″E / 28.91889°N 102.21750°E / 28.91889; 102.21750 (Baozhusi Hydro Power Station) Nanyahe 240 124.5 Operational
Jinwo Hydro Power Station 金窝水电站 Tianwanhe 280 124.5 Operational 2*130MW
Renzonghai Hydro Power Station 仁宗海水电站 Tianwanhe 240 56 Operational
Xiaotiandu Hydro Power Station 小天都水电站 Wasigou 240 39 Operational
Tingzikou Hydro Power Station 亭子口水电站 31°49′24″N 105°52′07″E / 31.82333°N 105.86861°E / 31.82333; 105.86861 (Tingzikou Hydro Power Station) Jialing 1,100 116 Operational 4*275MW
Dusong Hydro Power Station 独松水电站 Big Jinchuan 1,360 111.5 Proposed
Maoergai Hydro Power Station 毛尔盖水电站 32°03′56″N 103°13′55″E / 32.06556°N 103.23194°E / 32.06556; 103.23194 (Maoergai Hydro Power Station) Heishui 420 147 Operational 3*140MW
Jianke Hydro Power Station 剑科水电站 Maoergai 246 83 Under construction 3*82MW
Jiangbian Hydro Power Station 江边水电站 28°36′18″N 101°41′58″E / 28.60500°N 101.69944°E / 28.60500; 101.69944 (Jiangbian Hydro Power Station) Jiulong 330 Under construction 3*110MW
Xigu Hydro Power Station 溪古水电站 Jiulong 249 Under construction 3*83MW
Guanzhou Hydro Power Station 关州水电站 Xiaojinchuan 240 Under construction 3*80MW
Jiniu Hydro Power Station 吉牛水电站 Geshizha 240 Operational 2*120MW
Chuosijia Hydro Power Station 绰斯甲水电站 Chuosijia 392 Under construction
Quxue Hydro Power Station 去学水电站 Shuoqu 246 164.2 Under construction 2*123MW
Guwa Hydro Power Station 古瓦水电站 Shuoqu 222 150 Operational 3*74MW
Gungqiao Hydro Power Station 锅浪跷水电站 30°0′15″N 102°28′05″E / 30.00417°N 102.46806°E / 30.00417; 102.46806 (Guolangqiao Hydro Power Station) Tianquanhe 220 186.3 Under construction 3*70MW

*Jingping II Hydro Power Station is a Run-of-the-river type of power station. There are 4 water tunnels which are 16.6 km long in average each to divert the water through the Jingping mountains. The deepest point of the tunnel is 2,525 meters from the top of mountain.

Pumped-storage

[edit]
Station Name in Chinese Coordinates Capacity (MW) Rated Head (meters) Status Generator units Under construction units
Daofu Pumped Storage Power Station 道孚抽水蓄能电站 2,100 760.7 UC 6*350MW
Lianghekou Pumped Storage Power Station 两河口混合式抽水蓄能电站 1,200 UC 4*300MW

Wind

[edit]
Station Name in Chinese Coordinates Operational capacity (MW) Status Units
Decang 德昌风电场 16 Underconstruction 8*2MW

References

[edit]
  1. ^ "四川广安发电有限责任公司". ccpi.gov.cn. Archived from the original on 2010-04-05. Retrieved 2020-12-09.
  2. ^ "四川广安电厂240万千瓦规划装机容量全投产". China Radio International. 2007-07-05.
  3. ^ "四川首座百万千万级火电厂第2台机组投运 - 北极星火力发电网". news.bjx.com.cn. Retrieved 2021-11-07.
  4. ^ "中煤广元燃煤发电项目开工 项目总投资72.72亿元-广元市人民政府". www.cngy.gov.cn. Retrieved 2024-05-24.
  5. ^ "受灾严重的省属企业 江油电厂全面复发电". sichuan.scol.cn. 2009-03-04. Archived from the original on 2011-07-07.
  6. ^ "四川泸州电厂投运". power.in-en.com. 2008-02-28. Archived from the original on 2012-03-13.
  7. ^ "国电成都金堂电厂正式投入运营". power.in-en.com. 2007-09-25. Archived from the original on 2010-12-30.
  8. ^ "投资46亿 四川中电(宜宾)福溪电厂600MW火电项目开工(组图)". 163.com. 2009-11-18. Archived from the original on 2012-03-07.
  9. ^ "华电珙县电厂火电工程开建".
  10. ^ "国电—四川华蓥山电厂 - 煤炭通 MeiTanTong.com". Archived from the original on 2011-07-14. Retrieved 2010-10-08.
  11. ^ "Archived copy". Archived from the original on 2011-07-07. Retrieved 2010-10-08.{{cite web}}: CS1 maint: archived copy as title (link)
  12. ^ "2×700MW!川投集团资阳燃气电站开工 - 北极星火力发电网". news.bjx.com.cn. Retrieved 2022-04-10.
  13. ^ "我国西南地区首个9H级燃气电站项目投产-新华网". www.sc.news.cn. Retrieved 2024-06-18.
  14. ^ "2×700MW!四川能投广元燃机工程桩基础施工全面启动-北极星火力发电网". news.bjx.com.cn. Retrieved 2022-07-02.
  15. ^ "2×700MW!川投四川泸州天然气发电项目开工-北极星火力发电网". news.bjx.com.cn. Retrieved 2023-08-15.
  16. ^ power.in-en.com https://power.in-en.com/html/power-2445217.shtml. Retrieved 2024-03-18. {{cite web}}: Missing or empty |title= (help)
  17. ^ "占全国1/4四川水电装机容量未来十年翻一番". news.china.com.cn. 2010-09-10. Archived from the original on 2012-03-04.
  18. ^ "银江水电站大坝已修筑50米高_要闻_新闻中心_长江网_cjn.cn". news.cjn.cn. Retrieved 2024-07-19.
  19. ^ "金沙水电站4号机组通过验收 - 北极星水力发电网". news.bjx.com.cn. Retrieved 2021-10-10.
  20. ^ "总装机240万千瓦!金沙江旭龙水电站开工-北极星水力发电网". news.bjx.com.cn. Retrieved 2022-09-27.
  21. ^ "金沙江上游昌波水电站开工建设-新华网". tibet.news.cn. Retrieved 2024-07-19.
  22. ^ "金沙江上游苏洼龙水电站首台机组进入72小时试运行". www.sc.chinanews.com.cn. Retrieved 2022-07-20.
  23. ^ "总投资102亿元!甘孜州巴塘水电站开工建设,预计2022年投产!_工作". www.sohu.com. Retrieved 2019-07-07.
  24. ^ "金沙江上游最大水电工程实现重大目标,大坝浇筑破100米". news.cctv.com (in Chinese (China)). Retrieved 2024-07-19.
  25. ^ "关于金沙江上游波罗水电站环境影响报告书的批复". www.mee.gov.cn. Retrieved 2024-10-10.
  26. ^ "二滩水电开发有限责任公司 | 二滩电厂". Archived from the original on 2011-07-07. Retrieved 2010-09-29.
  27. ^ "雅砻江孟底沟水电站正式开工 - 北极星水力发电网". news.bjx.com.cn. Retrieved 2021-10-03.
  28. ^ "国投电力:牙根一级水电站获得核准-北极星电力新闻网". m.bjx.com.cn. Retrieved 2024-07-19.
  29. ^ "四川开工全球最大混合式抽水蓄能项目 ,提升电力供应韧性_能见度_澎湃新闻-The Paper". m.thepaper.cn. Retrieved 2024-09-11.
  30. ^ "大渡河安谷水电站开工建设_商务_东莞时间网". Archived from the original on 2014-02-19. Retrieved 2012-04-01.
  31. ^ "新浪博客".
  32. ^ "大渡河沙坪一级进入一期主体工程施工阶段 - 北极星水力发电网". news.bjx.com.cn. Retrieved 2021-11-07.
  33. ^ "四川省大渡河老鹰岩一级水电站环评审查公示-北极星电力新闻网". m.bjx.com.cn. Retrieved 2024-07-19.
  34. ^ "大渡河老鹰岩二级水电站开工建设-北极星水力发电网". news.bjx.com.cn. Retrieved 2024-10-10.
  35. ^ "硬梁包水电站大坝填筑到顶-北极星电力新闻网". m.bjx.com.cn. Retrieved 2024-07-19.
  36. ^ "四川大唐黄金坪水电站1号机组正式投产-新闻-能源资讯-中国能源网". www.china5e.com. Retrieved 2024-07-19.