Line 21 (Shanghai Metro)
Appearance
(Redirected from Line 21, Shanghai Metro)
Line 21 | |
---|---|
21 | |
Overview | |
Other name(s) | Line 24 (between 2014 and 2016) |
Native name | 上海地铁21号线 |
Status | Under construction |
Locale | Pudong, Shanghai |
Termini |
|
Connecting lines | 2 6 9 11 12 13 14 |
Stations | 28 |
Website | www |
Service | |
Type | Rapid transit |
System | Shanghai Metro |
Operator(s) | Shanghai Maglev Development Co., Ltd. |
Depot(s) | Liuchen Road Depot |
Rolling stock | Class A 6-car trains |
History | |
Commenced | January 4, 2022 |
Planned opening | 2026 |
Technical | |
Track length | 48 km (30 mi) |
Number of tracks | 2 |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Electrification | Overhead lines (1500 volts) |
Operating speed | 100 km/h (62 mph) |
Line 21 will be a future subway line on the Shanghai Metro. It will run in a north–south direction through Pudong, connecting Gaohang in Waigaoqiao to the Disney Resort. The first phase will be about 28 km (17 mi) long with 10 stations.[1] Stations will have passing loops to allow for express and local stopping patterns.[1]
The line was announced by the Municipal government in 2016.[2][3] Previous plans in 2014 designated the Disney Resort — Guanglan Road section as Line 24.
History
[edit]Shanghai metro line 21 opening history | ||||||
---|---|---|---|---|---|---|
Segment | Commenced | Opened | Length | Station(s) | Name | Investment |
Dongjing Road - Tanghuang Road | 4 Jan 2022 | exp 2026 | 27.964 km (17.4 mi) | 17 | Phase 1 | 36.956 billion yuan |
Tanghuang Road - Shanghai East Railway Station | end-2023 | exp 2027 | 14 km (8.7 mi) | 5 | Phase 2 | |
Shanghai East Railway Station - Pudong Airport T3 Terminal | exp 2028 | 2 km (1.2 mi) | 1 | Phase 2 | ||
Dongjing Road - Wusongkou International Cruise Terminal | planned | 9 | Phase 3 | |||
Stations
[edit]Service routes
[edit]Important stations
[edit]The line will interchange with various lines in Pudong at the following stations:
- Dongjing Road (Line 6)
- North Yanggao Road (Line 12)
- Guanglan Road (Line 2)
- Zhangjiang Road (Line 13)
- Disney Resort (Line 11)
References
[edit]- ^ a b "上海轨道交通21号线(一期)环评报批前公示-基础工程网". www.jcgcw.com. Retrieved 2022-01-17.
- ^ "Shanghai Municipal Government: City mulls plan for nine more Metro projects". publicnow.com. 20 April 2016. Retrieved 24 April 2016.
- ^ 上海市轨道交通近期建设规划(2017-2025)出炉 规划有9条线路 (in Chinese). Shanghai Municipal Government. 19 April 2016. Retrieved 24 April 2016.