Line 17 (Chengdu Metro)
Chengdu Metro Line 17 | |
---|---|
17 | |
Overview | |
Status | Operational |
Owner | City of Chengdu |
Locale | Chengdu, Sichuan |
Termini | |
Stations | 3 |
Service | |
Type | Rapid transit |
System | Chengdu Metro |
Operator(s) | Chengdu Metro Corporation |
Depot(s) | Wutongmiao Depot (五桐庙停车场) |
History | |
Opened | 18 December 2020[1] |
Technical | |
Line length | 5.486 km (3.4 mi) (in operation) |
Number of tracks | 2 |
Character | underground |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge |
Electrification | Overhead line, 25 kV 50 Hz AC |
Operating speed | 140 km/h[2] |
Line 17 of the Chengdu Metro is a metro line in Chengdu. The whole line will be 30.286 km when Phase 2 opens. The line uses 8-car Type-A trains operating up to 140 km/h speed powered by 25kV AC overhead lines.[3]
Phase 1 runs from Jinxing station in Wenjiang District to Jitouqiao station in Wuhou District. Phase 1 is 26.145 km long with 5.5 km running elevated and 20.6 km running underground. There are 9 stations with 2 elevated stations and 7 underground stations.[4][5]
Phase 2, currently under construction, will extend the line west across central Chengdu to Gaohong station. It will be 24.8 km long, all underground with 18 additional stations.[6]
Progress
[edit]- On February 23, 2017, Sichuan Development and Reform Commission approved Line 17 Phase 1.[7]
- On February 27, 2017, Line 17 Phase 1 started construction.[8][9]
- On Nov 11 2017, the first tunnel boring machine started digging section between Jiujiang North and Baifoqiao Stations.[10]
- On March 24, 2019, Line 17 phase 1 elevated section was completed.
- On April 9, 2019, Huangshi-Chengdu Fifth People's Hospital, Mingguang-#1 Vent Tunnel sections are completed.
- On August 5, 2019, main structures of all stations on Line 17 was completed.[11]
- On Jan 7 2020, Line 17 Phase 2's Beimenqiao Station started excavation, marking the start of station construction for Phase 2.
- On March 25, 2020, Line 17 Phase 1 finished track-laying.[12]
- On June 19, 2020, Chengdu Metro started 3-month trial operation for Line 17.[13]
- On June 24, 2020, Construction finished for Wutongmiao Depot (五桐庙停车场) for Line 17.[14]
- On December 18, 2020, Line 17 from Jinxing station to Jitouqiao station was opened.
- On Oct 20 2022, 16:40, Line 17 Phase 2's Longzhuayan - Qingshuihedaqiao section finished both tunnel construction. This section is 369.602m long.[15]
- On 12 Feb 2023, Line 19 Phase 2 is officially powered on.[16]
- On 21 Feb 2023, Line 19 Phase 2 signal and communication system started operational testing in Xinmiao Control Centre (新苗控制中心), and Phase 2 signal now synchronizes with Phase 1.[17]
- On 22 Feb 2023, Line 17 Phase 2 finished Jinxing station's main power centre's land clearance.[18]
- On 20 March 2023, Line 19's Changshuncun Depot (长顺村停车场) is handover to operation.[19]
- On 28 March 2023, Line 19 Phase 2 finished 160 km/h high-speed train testing, entering 1–2 months of systematic testing.[20]
- On 28 March 2023, Chengdu Rail Transit 2023 Annal Media Gala was held in Wenjiashan Station of Line 19.[21]
- On 30 March 2023, Line 19 Phase 2 finished construction and handover to operation team for operational testing.[22]
- On 26 May 2023, all 45 trains of Line 19 Phase 2 are delivered.[23]
- On 6 September 2023, Chengdu Metro debuted Train Maintenance Bots (车辆巡检机器人), AI-Railway Maintenance Bots (轨道智能巡检机器人), and Power-line Surveillance AI (弓网在线监测装置) on Line 19. This is the first AI-Maintenance Robot & System in the world. Chengdu Metro will implement full AI-Operation by 2025.[24]
- On September 17, 2023, original Line 17 Phase 1: (Jinxing - Jitouqiao) splits into Line 19 Phase 1: (Jinxing - Jiujiang North) and new Line 17: (Jiujiang North - Jitouqiao), and 4-Car A-Train starts operation on Line 17. All passengers must transfer at the same platform at Jiujiang North between line 17 and line 19.[25][26]
- On September 26, 2023, Line 18 and Line 19 starts co-operational testing.[27]
- On September 30, 2023, Line 17 Phase 2's People's Park station finished structure construction.[28]
- On Oct 3, 2023, Line 17 Phase 2's Qingshuihedaqiao station to Huanhhali station finished both tunnel construction.[29]
Operation
[edit]Opening - 2023 September
[edit]Line 17 Phase 1 and Line 19 Phase 1 were running in connection as one route.
September 2023 - Now
[edit]Original Line 17 Phase 1: (Jinxing - Jitouqiao) split into Line 19 Phase 1: (Jinxing - Jiujiang North) and new Line 17: (Jiujiang North - Jitouqiao), and 4-Car A-Train starts operation on Line 17. All passengers must transfer at the same platform at Jiujiang North between line 17 and line 19.[30][31]
Future
[edit]When Line 17 Phase 2 and Line 19 Phase 2 are finished, the operation plan will be:[32]
Line 17 Section:Jiujiang North - Baifoqiao - Jitouqiao
Line 19 Section:Jinxing - Huangshi - Chengdu Fifth People's Hospital- Fengxihe - Wenquan Avenue - Mingguang - Jiujiang North
Stations
[edit]Station
№ |
Station name | Transfer | Distance km |
Borough | ||
---|---|---|---|---|---|---|
English | Chinese | |||||
17 01 | Gaohong | 高洪 | Chenghua | |||
17 02 | Weiling | 威灵 | ||||
17 03 | Hangtian Road | 航天路 | ||||
17 04 | Renmintang | 人民塘 | 8 (OSI: Shengdeng Park) | |||
17 05 | Jichechang | 机车厂 | ||||
17 06 | Erxianqiao | 二仙桥 | 7 | |||
17 07 | Tashuiqiao | 踏水桥 | ||||
17 08 | Jianshe North Road | 建设北路 | 6 | |||
17 09 | Hongxing Bridge | 红星桥 | 3 | Jinniu | ||
17 10 | Chenghuangmiao | 城隍庙 | ||||
17 11 | Xidajie | 西大街 | Qingyang | |||
17 12 | People's Park | 人民公园 | 2 10 | |||
17 13 | Xiaonan Street | 小南街 | 13 | |||
17 14 | Provincial Orthopaedics Hospital | 省骨科医院 | 5 | |||
17 15 | Huanhuali | 浣花里 | Wuhou | |||
17 16 | Qingshuihedaqiao | 清水河大桥 | ||||
17 17 | Longzhuayan | 龙爪堰 | 7 | |||
17 18 | Yanggongqiao | 阳公桥 | ||||
17 19 | Jitouqiao | 机投桥 | 9 | —— | 0.000 | |
17 20 | Baifoqiao | 白佛桥 | 1.468 | 1.468 | ||
17 21 | Jiujiang North | 九江北 | 19 | 4.179 | 5.647 | Shuangliu |
References
[edit]- ^ "12月18日五线齐发,成都轨道交通运营里程突破500公里!".
- ^ "成都轨道交通17号线二期工程可行性研究及勘察设计总承包招标公告" (in Chinese). 四川日报. 2017-08-01. Retrieved 2017-08-01.
- ^ "成都轨道交通17号线二期工程可行性研究及勘察设计总承包招标公告" (in Chinese). 四川日报. 2017-08-01. Retrieved 2017-08-01.
- ^ "地铁19号线一期" (in Chinese). 成都地铁. 2017-10-16. Retrieved 2017-10-16.
- ^ "轨道交通17号线一期". Retrieved 2018-04-04.
- ^ "成都轨道交通17号线二期工程可行性研究及勘察设计总承包招标公告" (in Chinese). 四川日报. 2017-08-01. Retrieved 2017-08-01.
- ^ "成都轨道交通11号线一期、17号线一期工程可研报告获批" (in Chinese). 四川新闻网. 2017-02-23. Retrieved 2017-02-23.
- ^ 成都地铁17号线一期开建 预计2020年通车_网易新闻. news.163.com. Retrieved 2018-08-19.
- ^ "成都地铁17号线一期开建 预计2020年通车" (in Chinese). 网易. 2017-02-28. Archived from the original on 2018-05-08. Retrieved 2017-02-28.
- ^ "串联温江、武侯和双流 成都地铁17号线开始"打洞"" (in Chinese). 四川在线. 2017-11-29. Retrieved 2017-11-29.
- ^ "成都地铁17号线一期全线车站封顶" (in Chinese). 成都市温江区人民政府. 2019-08-07.
- ^ "成都轨道交通17号线一期"长轨通" 温江将迎双地铁时代".
- ^ "即将开启空载调试、空载试运行 成都地铁9号线、17号线离开通也近了!".
- ^ "成都地铁17号线列车有家啦!五桐庙停车场主体工程完工".
- ^ "成都地铁17号线二期龙~清区间双线顺利贯通". crcc 24. 2022-10-24. Retrieved 2023-10-09.
- ^ "195座车站封顶、23个TOD实施 成都轨道集团迎来一季度"开门红"" (in Chinese).
- ^ "地铁19号线二期年内试运营!成都轨交建设最新进展" (in Chinese). 2022-12-21.
- ^ "地铁19号线二期年内试运营!成都轨交建设最新进展" (in Chinese). 2022-12-21.
- ^ "195座车站封顶、23个TOD实施 成都轨道集团迎来一季度"开门红"" (in Chinese).
- ^ "热滑完成!成都地铁19号线二期提前通车有望".
- ^ "成都轨道交通19号线二期举办"开门评风"媒体交流活动".
- ^ "成都轨道交通19号线二期轨行区正式移交运营".
- ^ "成都轨道交通19号线二期45列电客车全数交付". Sohu (in Chinese).
- ^ "成都:创新引领科技赋能轨道交通高质量发展".
- ^ "地铁17号线"一拆为二" 来看看会有哪些变化" (in Chinese).
- ^ "成都地铁19号线二期开通在即 17号线将在九江北站"分家"" (in Chinese).
- ^ "离开通再近一步!成都地铁19号线二期最新消息" (in Chinese).
- ^ 中铁广州工程局城建公司 (2023-09-29). "中铁广州局重点项目之成都地铁10号线项目". 中铁广州工程局城建公司. Retrieved 2023-10-09.
- ^ "【e周发声】第247期-成都轨道交通17号线清水河大桥站~浣花里站区间双线贯通". 2023-10-09. Retrieved 2023-10-09.
- ^ "地铁17号线"一拆为二" 来看看会有哪些变化" (in Chinese).
- ^ "成都地铁19号线二期开通在即 17号线将在九江北站"分家"" (in Chinese).
- ^ "成都地铁17号线"最难建段"开始掘洞" (in Chinese). 四川在线. 2018-03-29. Retrieved 2018-03-29.