Jump to content

Koeberg Nuclear Power Station

Coordinates: 33°40′35.2″S 18°25′55.37″E / 33.676444°S 18.4320472°E / -33.676444; 18.4320472
From Wikipedia, the free encyclopedia
(Redirected from Koeberg nuclear power plant)

Koeberg Nuclear Power Station
Koeburg Nuclear Power Station and its two pressurised light-water nuclear reactors
Map
CountrySouth Africa
LocationWestern Cape
Coordinates33°40′35.2″S 18°25′55.37″E / 33.676444°S 18.4320472°E / -33.676444; 18.4320472
StatusOperational
Construction began1976
Commission date1984
OwnerEskom
OperatorEskom
Nuclear power station
Reactor typePWR
Reactor supplierFramatome
Power generation
Units operational2 x 970 MW
Nameplate capacity1,940 MW
Capacity factor80.4%
Annual net output13,668 GW·h
External links
Websitewww.eskom.co.za/eskom-divisions/gx/nuclear/
CommonsRelated media on Commons
Koeberg in red with the other potential nuclear sites in blue

Koeberg Nuclear Power Station is a nuclear power station in South Africa and the only one on the African continent. It is located 30 km north of Cape Town, near Melkbosstrand on the west coast. It is owned and operated by the country's state-owned electricity public utility, Eskom.

Design

[edit]

Koeberg contains two pressurised water reactors based on a design by Framatome of France. Framatome has a 51% shareholding in local South African company Lesedi Nuclear Services which performs upgrade and maintenance projects at Koeberg.[1] Koeberg supplies power to the national grid so that over-capacity can be redistributed to the rest of the country on an as-needed basis. Fuel stock used within the reactor is enriched uranium dioxide pellets containing gadolinium, contained in fuel rods.[2] Koeberg is rated at 1,860 MW, its average annual production is 13,668 GWh and it has two turbine generators.&.[3][4]

Each reactor delivers 970 MW (gross) and is capable of delivering 930 MW (net) to the grid.[5]

The power station was constructed near Cape Town to be the sole provider of power in the Western Cape after fossil-fuel power stations were deemed too small and too expensive to be viable. Nuclear power was considered because it was more economical than transporting coal to the existing fossil-fuel power stations, and construction of new fossil-fuel power-stations, which would have required 300 m tall chimneys to comply with clean-air legislation.[citation needed] Athlone Power Station in the city was too small to provide Cape Town's needs, and the Paarden Island power station (also too small) has been demolished.

Koeberg was one of the first nuclear power stations designed to be resistant to earthquakes. The reactors at the Koeberg nuclear power station are built on an aseismic raft designed – on the basis of a mid-1970s hazard study - to withstand a magnitude 7 earthquake at a focal distance of about 10 km, 0.3g zero period ground acceleration (ZPGA). The largest recorded earthquake in the Cape Town area has been 6.5 magnitude at Jan Biesjes Kraal in 1809.[6][7][8]

The reactor at Koeberg is cooled by cold water from the Atlantic Ocean pumped through an isolated circuit at 80 tons a second.[9] Low and intermediate level waste from Koeberg is transported by road in steel and concrete containers to a rural disposal site at Vaalputs, 600 km away in the Kalahari Desert.

The power station was originally located outside the metropolitan area, but urban growth has exceeded expectations in the intervening years, so that the power station is now close to suburban housing. The administration enforces maximum housing density regulations in case of evacuation, which precludes the construction of high rise buildings. The buffer zone around the nuclear power station forms the 22 km2 Koeberg Nature Reserve, open to the public and containing more than 210 species of birds and a number of mammal species including zebra, eland and springbok.[10]

History

[edit]

Construction of the power station began in 1976, and Unit 1 was synchronized to the grid on 4 April 1984. Unit 2 followed on 25 July 1985.

On 17 December 1982, Umkhonto we Sizwe, the armed wing of the ANC attacked Koeberg while it was still under construction.[11] Damage was estimated at R 500 million and the commissioning of the power station was put back by 18 months.[12] The bomber was Rodney Wilkinson, who had previously represented South Africa in international fencing tournaments.[13][14][15]

In August 2002 twelve Greenpeace activists obtained access to the station. Six of them scaled the wall to hang up an anti-nuclear protest banner. The twelve were arrested and fined.[16]

At the end of 2005, Koeberg started experiencing numerous technical difficulties. On 11 November 2005, a fault on a transmission busbar caused the reactor to go into safe mode, cutting supply to most of the Western Cape for about two hours. On 16 November a fire under a 400 kV transmission line caused the line to trip, causing severe voltage dips which resulted in Koeberg once again shutting down. Parts of the Cape were left without electricity for hours at a time. On the evening of 23 November, a routine inspection of the backup safety system revealed a below-spec concentration of an important chemical, resulting in a controlled shutdown of the reactor. Due to the sufficiency of backup supply, major power cuts were not experienced until Friday 25 November, when the backup capacity began running out. At this point, rotational load shedding was employed, with customers being switched off in stages for most of the day. Koeberg was re-synchronised to the national grid on Saturday 26 November.

On Sunday 25 December 2005, the generator of Unit 1 was damaged. While the generator was being powered up after scheduled refuelling and maintenance, a loose bolt, which was left inside the generator caused severe damage, forcing it to be shut down. Subsequent to the unexpected unavailability of Unit 1, Unit 2 was also brought down for scheduled refuelling, resulting in a severe shortage of supply to the Western Cape. This resulted in widespread load shedding in order to maintain the stability of the network. A replacement rotor for Unit 1 was shipped in from France and the unit was brought back into operation in May 2006.

On 18 and 19 February 2007 large parts of the Western Cape again experienced blackouts due to a controlled shutdown of Koeberg. According to Eskom and the City of Cape Town, power cuts were to continue until 26 February 2007, however power supply problems continued beyond this date.

The estimated economic losses due to the power cuts was over R 500 M as at February 2007, and was estimated to rise to possibly as high as R 2 billion.

On 12 September 2010, 91 members of staff were contaminated with cobalt-58 dust in an incident that appeared confined to the station.[17]

The government's agreed 2019 Integrated Resource Plan (IRP) plans a 20-year life-extension for Koeberg to 2044, and a delayed nuclear new build programme with a scenario that may build new capacity after 2030.[18]

On 10 September 2020, Eskom announced it will replace six steam generators.[19] The design, manufacture and install contract with Areva was for ZAR 4.4 billion ($240 million), with manufacture subcontracted to the Shanghai Electric Power. Installation was delayed to 2023 and 2024 because of concerns about possible power shortages.[20] Koeberg 1's outage began on 10 December 2022 and it came back synchronised with the grid on 18 November 2023, taking much longer than the expected six months. Koeberg 2 will begin its outage once Koeberg 1's recommissioning tests are complete.[21]

In 2022, the Daily Maverick reported that Eskom's then Chief Nuclear Officer, Riedewaan Bakardien had left the utility, also noting an Eskom estimated loss of between 250 and 300 "skilled persons" in 2022, putting at risk the planned R20 billion life extension.[22]

Production Koeberg 1/2 1984-2017 (TWh/yr)

[edit]

Source:[23]

Post Fukushima stress tests

[edit]

After the Fukushima Daiichi nuclear disaster, seismic safety at Koeberg was reevaluated in conjunction with the IAEA. Although Koeberg was designed for 0.3g zero period ground acceleration (ZPGA), a magnitude 7 earthquake, stress tests evaluated Koeberg against a 0.5g ZPGA. Overall Koeberg was found to be seismically robust and well designed, with some areas for attention and improvement that were highlighted.[24]

New build

[edit]

Duynefontein next door on the northern side of Koeberg is a proposed site for a new nuclear power station.[25]

Opposition to Koeberg

[edit]

South Africa's nuclear industry has seen opposition, chiefly from environmentalists concerned about safety issues such as radioactive waste, and anti-war activists concerned about nuclear proliferation and use of atomic weapons. Current campaigns against nuclear energy are being run by Earthlife Africa and Koeberg Alert. [26][27] [28]

See also

[edit]

Notes

[edit]
  1. ^ "About Lesedi Interactive Presentation" (PDF).
  2. ^ "U.S. Nuclear Regulatory Commission Application for NRC Export or import License Amendment, Renewal, or Consent Request(s)" (PDF). U.S. Nuclear Regulatory Commission. 6 December 2013.
  3. ^ "Koeberg Nuclear Power Station". Eskom. Retrieved 14 May 2007.
  4. ^ "Fact sheets with additional information" (PDF). 15 January 2021.
  5. ^ "PRIS - Country Details". www.iaea.org. Retrieved 18 January 2016.
  6. ^ "CAPE TOWN EARTHQUAKES: REVIEW OF THE HISTORICAL RECORD" (PDF). Conferences of the Institute. DISASTER MANAGEMENT INSTITUTE OF SOUTHERN AFRICA (DMISA). Retrieved 7 January 2015.
  7. ^ "SEISMIC STRESS TEST OF KOEBERG NPP". CKTI-Vibroseism Ltd. Retrieved 7 January 2015.
  8. ^ "Koeberg can withstand quake, tsunami". News24. Media24. Retrieved 7 January 2015.
  9. ^ "Generating Electricity at a Nuclear Power Station". Eskom. Archived from the original on 23 October 2007.
  10. ^ "Koeberg Nature Reserve". Eskom. Retrieved 13 February 2020.
  11. ^ "History of MK". African National Congress. Archived from the original on 4 April 2007. Retrieved 14 May 2007.
  12. ^ Helen Bamford (11 March 2006). "Koeberg: SA's ill-starred nuclear power plant". Cape Argus. Retrieved 14 May 2007.
  13. ^ Beresford, David (2010). Truth is a Strange Fruit: A Personal Journey Through the Apartheid War. Jacana. ISBN 978-1-77009-902-9.
  14. ^ Davis, Rebecca (31 October 2020). "The man who blew up Koeberg". Daily Maverick. Retrieved 29 October 2021.
  15. ^ "How we blew up Koeberg... and escaped on a bicycle". 15 December 1995.
  16. ^ Jo-Anne Smetherham (25 August 2002). "Greenpeace in the dock over Koeberg raid". Cape Times. Archived from the original on 6 July 2007. Retrieved 14 May 2007.
  17. ^ SAPA (20 September 2010). "Koeberg workers contaminated". News24. Retrieved 22 September 2010.
  18. ^ "Nuclear remains in South Africa's energy plans". World Nuclear News. 18 October 2019. Retrieved 22 October 2019.
  19. ^ "UPDATE 1-S.Africa's Eskom expects 2021 replacement of generators at nuclear plant". Reuters. 10 September 2020. Retrieved 10 September 2020.
  20. ^ "Eskom reports progress in Koeberg NPP upgrades". Nuclear Engineering International. 22 August 2023. Retrieved 23 August 2023.
  21. ^ "Koeberg 1 back online after milestone outage". World Nuclear News. 20 November 2023. Retrieved 20 November 2023.
  22. ^ Calls for Eskom to lift veil of silence on R20bn plan to extend Koeberg’s lifespan
  23. ^ "Country Statistics - South Africa". IAEA PRIS - International Atomic Energy Agency, Power Reactor Information System. Retrieved 28 December 2018.
  24. ^ Darryn McCormick; Alexey Berkovsky; Thaabit Rylands (18 August 2013). "Seismic Stress Test of Koeberg NPP". {{cite journal}}: Cite journal requires |journal= (help)
  25. ^ "Revised Draft Environmental Impact Report". Retrieved 24 June 2015.
  26. ^ "Nuclear Energy". Earthlife Africa. Archived from the original on 14 March 2016. Retrieved 29 February 2016.
  27. ^ "NATIONAL COALITION TO OPPOSE NUCLEAR EXPANSION IN SOUTH AFRICA". Coalition Against Nuclear Energy. Retrieved 29 February 2016.
  28. ^ "Nuclear Waste". Koeberg Alert. 18 May 2011. Retrieved 29 February 2016.

References

[edit]
  1. Koeberg on the Eskom-Website
  2. Nuclear Tourist. Includes a picture.
  3. Koeberg details
  4. Evacuation modelling for Koeberg
  5. Google Map Satellite Image
  6. January 2006 Eskom media release on Koeberg's problems.