Jump to content

KRI Banda Aceh

From Wikipedia, the free encyclopedia

KRI Banda Aceh on 7 October 2014
History
Indonesia
NameBanda Aceh
NamesakeBanda Aceh
Ordered28 March 2005
BuilderPT PAL, Surabaya
Laid down7 December 2007
Launched19 March 2010
Commissioned21 March 2011
IdentificationPennant number: 593
StatusActive
General characteristics
Class and typeMakassar-class landing platform dock
Tonnage12,400 tons
Displacement
  • 11,300 tons standard displacement
  • 15,994 tons full displacement
Length122 meters
Beam22 meters
Height56 meters
Draft4.9 meters
Decks(Tank Deck); 6.7 meter,(Truck Deck); 11.3 meter
Propulsion
  • CODAD, 2 shafts
  • 2 × MAN B&W 8L28/32A diesel rated at 2666 BHP/1960 kW@ 775 RPM
Speed
  • Maximum: 16 knots
  • Cruising: 14 knots
  • Economy: 12 knots
Range30 days, up to 10,000 Nm
Endurance+45 days
Boats & landing
craft carried
2 x LCVP
Capacityup to 35 infantry vehicles
Troops354 troops
Complementaccommodations up to 507 persons
Crew126 crew
Armament1 x Bofors 40mm SAK40/L70

2 x 20mm Oerlikon

2 x Mistral Simbad
Aircraft carriedUp to 5 helicopters
Aviation facilities2 helideck spot (Medium-sized helicopters)

KRI Banda Aceh (593) is the fourth ship of the Makassar-class landing platform dock of the Indonesian Navy.

Development and design

[edit]

Indonesia signed a US$150 million contract in December 2004[1] and the first two units were built in Busan, South Korea. The remaining two were built at Indonesia's PT PAL shipyard in Surabaya with assistance from Daesun.The contract for the 3rd and 4th LPD to be built in Indonesia was signed with PT PAL on March 28, 2005.

On 19 October 2006, the first of the two Indonesian-built units, was laid down in a ceremony by Admiral Slamet Subiyanto, Chief of Staff, Indonesian Navy.[2] The 3rd and 4th units had been designed to function as flagships with provisions for a command and control system, 57mm gun and air defence systems.

The 5th ship ordered by Indonesian navy on January 11, 2017.[3] First steel cutting ceremony for said ship was conducted on April 28, 2017.[3] The ship's keel was laid on August 28. 2017.[4]

Construction and career

[edit]

Banda Aceh was laid down 7 December 2007 and launched on 19 March 2010 by PT PAL at Surabaya. She was commissioned on 21 March 2011.

She participated in RIMPAC 2014.

[edit]

References

[edit]
  1. ^ "Daewoo International to Export 4 Warships to Indonesia". Archived from the original on 13 August 2010. Retrieved 9 June 2010.
  2. ^ "PAL Indonesia gaining the ordered for 2 units Landing Platform Dock". Archived from the original on 12 September 2007. Retrieved 9 September 2007.
  3. ^ a b "PT PAL Mulai Garap Kapal LPD Pesanan TNI AL".
  4. ^ "Keel Laying Lebih Awal, Kapal LPD TNI AL Diharapkan Cepat Rampung".