Jump to content

Jōban Line

From Wikipedia, the free encyclopedia
(Redirected from Joban Line)
Joban Line
JJ JL
Joban Line Series E531
Overview
Native name常磐線
OwnerLogo of the East Japan Railway Company (JR East) JR East
LocaleTokyo, Chiba, Ibaraki, Fukushima, Miyagi prefectures
Termini
Stations85 on the Joban Line
4 on the Ueno-Tokyo Line
Service
TypeHeavy rail
Operator(s)JR East, JR Freight
History
Opened16 January 1889; 135 years ago (1889-01-16)
Completed1 April 1905; 119 years ago (1905-04-01)
Technical
Track length368.0 km (228.7 mi)
Track gauge1,067 mm (3 ft 6 in)
Electrification1,500 V DC & 20 kV AC 50 Hz (overhead catenary)
Route map
E531 series EMU between Matsudo and Kanamachi stations
(video) Riding in a Jōban Line train as another Jōban Line train passes in the other direction

The Jōban Line (Japanese: 常磐線, Hepburn: Jōban-sen) is a railway line in Japan operated by the East Japan Railway Company (JR East). The line officially begins at Nippori Station in Arakawa, Tokyo before the line officially ends at Iwanuma Station in Iwanuma, Miyagi.[1] However, following the opening of the Ueno–Tokyo Line, Jōban Line train services originate at Shinagawa or Ueno; likewise, Jōban Line trains continue past Iwanuma onto the Tōhoku Main Line tracks to Sendai.[2] The line approximately parallels the Pacific coasts of Chiba, Ibaraki, and Fukushima Prefectures.

The name "Jōban" is derived from the names of the former provinces of Hitachi (Japanese: ), and Iwaki (Japanese: ), which are connected by the line to reach Tokyo.

The section of the Jōban Line between Tomioka and Namie, which extends through the exclusion zone surrounding the Fukushima Daiichi nuclear meltdown, closed in the wake of the 2011 Tōhoku earthquake and tsunami and Fukushima Daiichi nuclear disaster. After some major repairs, the section reopened on 14 March 2020 after 9 years without service.[3]

History

[edit]

The Mito Railway opened the line in sections between 1889 and 1905. The dates of the individual section openings are given below. After the line was nationalised in 1906, a program of double-tracking commenced in 1910, with the 219 km (136 mi) section between Nippori and Yotsukura completed in 1925. The Hirono - Kido and Ono - Futaba sections were double-tracked in 1976.

The first section electrified was Nippori - Matsudo (at 1,500 V DC) in 1936, and extended to Toride in 1949. The Toride - Kusano section was electrified at 20 kV AC between 1961 and 1963, and extended to Iwanuma in 1967.

The 2011 Tōhoku earthquake and tsunami caused severe disruption to the line, with services to Iwaki (209.4 km (130.1 mi) from Nippori) re-established by 17 April, to Yotsukura (a further 9.8 km (6.1 mi)) by 14 May, and to Hirono (another 13.2 km (8.2 mi)) by 10 October 2011. Services on the 8.5 km (5.3 mi) Hirono - Tatsuta section returned on 1 June 2014.

At the northern end, services on the isolated 20.1 km (12.5 mi) Haranomachi - Soma section were restored on 21 December 2011, with services from Iwanuma to Hamayoshida (219 km (136 mi)) restored on 16 March 2013. Services resumed on the 9.4 km (5.8 mi) Haranomachi - Odaka section on 12 July 2016 and the 22.6 km (14.0 mi) Hamayoshida - Soma section was rebuilt at a higher, tsunami-proof level, and reopened on 10 December 2016, re-establishing the connection to Sendai for stations north of Odaka. The line fully reopened on 14 March 2020.[3]

Chronology

[edit]
  • 16 January 1889: Mito Railway (Mito — Oyama) begins operation.
  • 26 November 1890: Mito Railway Freight Line (Mito — Nakagawa) begins operation.
  • 1 March 1892: Mito Railway becomes part of the Nippon Railway.
  • 4 November 1895: Nippon Railway Tsuchiura Line (Tsuchiura — Tomobe) begins operation.
  • 1 December 1895: Hatori Station opens.
  • 25 December 1896: Tsuchiura Line (Tabata — Tsuchiura), Sumidagawa Line (Tabata — Sumidagawa) begin operation.
  • 25 February 1897: Iwaki Line (Mito — Taira [present-day Iwaki]) begins operation.
  • 17 May 1897: Tsuchiura Line Kameari Station opens.
  • 29 August 1897: Iwaki Line (Taira — Kunohama) begins operation.
  • 10 November 1897: Iwaki Line (Nakamura [present-day Sōma] — Iwanuma) begins operation.
  • 27 December 1897: Tsuchiura Line Kanamachi Station opens.
  • January 1898: Kitasenju — Sumidagawa connection opens.
  • 1 April 1898: Ishigami Station opens.
  • 3 April 1898: Iwaki Line (Haranomachi — Nakamura) begins operation.
  • 11 May 1898: Iwaki Line (Odaka — Haranomachi) begins operation.
  • 6 August 1898: Tsuchiura Line Mabashi Station opens.
  • 23 August 1898: Iwaki Line (Kunohama — Odaka) begins operation, connecting Tabata and Iwanuma. Tsuchiura Line and Mito Line (Tomobe — Mito) and Iwaki Line are collectively renamed the Kaigan Line.
  • 1 December 1898: Taka Station is renamed Iwaki-Ōta Station.
  • 4 August 1900: Sanuki Station opens.
  • 22 November 1904: Ōno Station opens.
  • 1 April 1905: With the completion of the Mikawashima — Nippori connection, the present-day route is finished. Nippori and Mikawashima Stations open. Service from Ueno to Tabata and back is abolished.
  • 1 November 1906: Nippon Railway is nationalized.
  • 25 March 1909: Tatsuta Station opens.
  • 12 October 1909: Kaigan Line split and renamed: Jōban Line (Nippori — Iwanuma) and Sumidagawa Line (Tabata — Sumidagawa). Jōban Line also handles freight services.
  • 16 February 1910: Minami-Nakagō Station opens.
  • 18 March 1910: Katsuta and Ogitsu Stations open.
  • 1 May 1911: Kita-Kogane Station opens.
  • 5 May 1911: Sumidagawa Line is merged into the Jōban Line.
  • 1 June 1915: Yoshida Station is renamed Hamayoshida Station.
  • 15 March 1921: Yonomori Station opens.
  • 15 August 1922: Nittaki Station opens.
  • 2 February 1925: Kōen-Shimo Station opens, but only operates during the ume blossom-viewing season.
  • 28 October 28, 1925: Nippori — Taira connection finished (joined with northern tracks in 1965).
  • 11 December 1936: Nippori — Matsudo tracks are electrified.
  • 1 October 1939: Shimomago Station is renamed Hitachi-Taga Station.
  • 20 October 1939: Sukegawa Station is renamed Hitachi Station.
  • 15 February 1944: Momouchi signal box is built between Namie and Odaka.
  • 20 February 1944: Suetsugi signal box is built between Kunohama and Hirono.
  • 1 June 1947: Suetsugi signal box becomes Suetsugi Station.
  • 10 August 1948: Momouchi signal box becomes Momouchi Station.
  • 10 May 1949: Shimoyama Station opens.
  • 1 June 1949: Matsudo — Toride tracks are electrified.
  • 6 July 1949: In what is known as the Shimoyama incident, JNR president at the time, Shimoyama Sadanori, is mysteriously found dead between Kita-Senju and Ayase Stations.
  • 10 May 1950: Sekimoto Station is renamed Ōtsukō Station.
  • 1 May 1952: Kita-Matsudo Station opens.
  • 10 July 1952: Komagamine Station opens.
  • 1 October 1953: Minami-Kashiwa Station opens.
  • 20 December 1956: Tsuzura Station is renamed Uchigō Station.
  • 1 April 1957: Ishigami Station is renamed Tōkai Station.
  • 1 June 1958: Semi-express Tokiwa begins operation.
  • 10 October 1958: The Limited express Hatsukari begins operation (Ueno — Aomori). It stops at Ueno, Mito, Taira, and Sendai Stations when it runs on the Jōban Line tracks.
  • 1 October 1959: Nagatsuka Station is renamed Futaba Station.
  • 1 October 1960: Kanayama signal box is built between Tatsuta and Tomioka. Ōkuma signal box is built between Watari and Iwanuma.
  • 20 March 1961: Nakamura Station is renamed Sōma Station.
  • 1 June 1961: Toride — Katsuta tracks are electrified.
  • 3 May 1962: The Mikawashima rail crash happens between Mikawashima and Minami-Senju when an Iwaki-bound passenger train crashes into the wreckage of a crash between a Ueno-bound passenger train and an Ueno-bound freight train. 160 people die and 296 are injured in the incident.
  • 1 October 1962: Katsuta — Takahagi tracks are electrified.
  • 1 May 1963: Takahagi — Taira tracks are electrified.
  • 20 April 1963: Takahira signal box is built between Haranomachi and Kashima.
  • 30 September 1963: Taira — Kusano tracks are electrified.
  • 5 March 1966: Tokiwa semi-express becomes an express.
  • 1 February 1967: Kōen-Shimo Station is renamed Kairakuen Station.
  • 20 August 1967: With the electrification of the Kusano — Iwanuma tracks, the entire Jōban Line becomes electrified.
  • 1 October 1968: Hatsukari express is rerouted to the Tōhoku Main Line.
  • 1 October 1969: Kairakuen Station becomes a temporary station. Seasonal Hitachi express begins operation.
  • 10 April 1970: Freight line Kita-Kashiwa Station opens.
  • 1 October 1970: Hitachi operates as a regular express.
  • 20 April 1971: Construction of the Kita-Senju — Abiko Joban Local Line is finished and runs through service to the Eidan Subway Chiyoda Line (present-day Tokyo Metro Chiyoda Line). (The Chiyoda Line only ran as far as Kasumigaseki at the time). Tennōdai Station opens and Kita-Kashiwa Station is open to passengers.
  • 1 April 1973: Shin-Matsudo Station opens.
  • 31 March 1978: With the extension of its tracks to Yoyogi-Uehara Station, the Chiyoda Line shares tracks with the Odakyu Odawara Line up to Hon-Atsugi Station. 203 series trains are introduced to run through service to the Chiyoda Line.
  • 15 November 1982: Jōban Line Local Service extended from Abiko — Toride.
  • 1 February 1984: Mito — Nakagawa freight line is closed.
  • 14 March 1985: Bampaku-Chūō Station is temporarily opened (until September 16) for the Tsukuba Expo '85. The Uchigō-System-Ku is abolished. The Tokiwa express is discontinued.
  • 1 April 1987: With the split of JNR, the Joban Line becomes part of JR East.
  • 2 August 1988: Ōkuma signal box becomes Ōkuma Station.
  • 11 March 1989: 651 series Super Hitachi limited-express EMUs enter service.
  • 1 February 1993: Kanayama signal box is abolished.
  • 10 February 1993: Takahira signal box is abolished.
  • 3 December 1994: Taira Station is renamed Iwaki Station.
  • 1 December 1995: E501 series begins service between Ueno and Tsuchiura.
  • 1 October 1997: E653 series Fresh Hitachi limited-express EMUs enter service.
  • 14 March 1998: Hitachino-Ushiku Station opens where Bampaku-Chūō Station used to stand.
  • 7 December 1998: 485 series Hitachi limited-express EMUs are retired.
  • 3 March 2002: New E231 series EMUs introduced on commuter services.
  • 13 March 2004: Kawajiri Station is renamed Jūō Station. Regular trains begin making stops at Mikawashima and Minami-Senju Stations throughout the day.
  • 16 October 2004: Medium-distance trains are called rapid trains for the section between Ueno and Toride.
  • 9 July 2005: New E531 series dual-voltage EMUs enter service on line. Special Rapid Service begins between Ueno — Tsuchiura. Commuter Rapid service from Ueno ends. One Commuter Rapid service still runs from Mito to Ueno.
  • 17 March 2006: All Commuter Rapid Service ends.
  • 15 May 2006: Women-only cars introduced on Joban Local Line trains [7:10 – 9:30 AM measured by the time the trains pass through Ayase station] from Toride running through to Yoyogi-Uehara on the Tokyo Metro Chiyoda Line.
  • 6 January 2007: Double-deck Green cars are phased in on E531 series EMUs running between Ueno and Takahagi. No Green car supplement is required until the start of the new timetable on 2007-03-18.
  • 21 February 2007: E501 series EMUs removed from Ueno – Tsuchiura services.
  • 18 March 2007: Full Green car service commences on E531 series EMUs running between Ueno and Takahagi; E501 series EMUs reassigned to Mito Line and Jōban services north of Tsuchiura become 10-car or 5-car formations only
  • 15 March 2008: Suica use extended to stations between Hitachi and Takahagi
  • 14 March 2009: Suica use extended to Takahagi – Iwaki and Haranomachi – Yamashita sections
  • 9 September 2009: E233 series 10-car EMUs introduced on Chiyoda Line through services
  • 11 March 2011: During the 2011 Tōhoku earthquake and tsunami, a 4-car train on the line was picked up off the tracks by the tsunami surge and overturned at Shinchi and Tomioka stations. All passengers from the train were evacuated before the tsunami came ashore. Tomioka was affected by the Fukushima nuclear disaster and was prohibited entrance without legal permission.
  • 8 January 2014: Thales is selected to design Japan's first communications-based train control system (CBTC) on the line.[4]
  • May 2014: Test-running commenced on the section of the line between Hirono and Tatsuta stations closed since the March 2011 earthquake and tsunami, with the intention of resuming passenger services on this section from 1 June.[5]
  • 1 June 2014: Train operations resumed between Hirono and Tatsuta.[6]
  • 12 July 2016: Train operations were resumed between Odaka and Haranomachi stations in Minami-Soma, Fukushima Prefecture.[7]
  • 20 August 2016: Station numbering introduced with Rapid services being assigned station numbers between JJ01 (Tokyo) and JJ24 (Toride).[8][9] Station numbers were also assigned to local services between Ayase (JL19) and Toride (JL32).
  • 10 December 10, 2016: The 23 km (14 mi) reconstructed section between Soma and Hamayoshida reopened.[3]
  • 1 April 2017: Train services from Odaka south to Namie resumed.[10]
  • 21 October 2017: Train services resumed north from Tatsuta to Tomioka.[11]
  • 14 March 2020: The section between Tomioka and Namie reopens 9 years after the 2011 Tōhoku earthquake and tsunami reconstruction, bringing the full line back to service.[12]
  • 13 March 2021 (planned): Automatic train operation will be activated on the Jōban Line (Local) between Ayase and Toride using the STO (Semi-Automatic) standard.[13][14][needs update]
  • 12 March 2022: The number of direct trains on the Ueno Tokyo Line and Joban Line during the day increases to three per hour. During the daytime hours, the direct train operation between Shinagawa / Ueno and Mito is separated at Tsuchiura Station. Along with this, trains in the direction of Ueno and Mito at Tsuchiura Station will be connected at the same platform.[15]
  • 16 March 2022: Due to the 2022 Fukushima earthquake, a part of the platform was damaged at Nittaki Station in Soma City, and a part of the bridge between Kashima and Haranomachi in Minamisoma City was several tens of centimeters from the base. Confirmed damage such as misalignment. Hirono-Iwanuma will be suspended from driving.[16]
  • 18 March 2022: Yamashita-Resumed operation between Iwanuma.[17]
  • 21 March 2022: Resumed operation between Hirono-Tomioka and Shinchi-Yamashita.[18]
  • 22 March 2022: Resumed operation between Tomioka and Haranomachi.[18]
  • 24 March 2022: Haranomachi-Resumed operation between Shinchi and resumed operation on all lines.[19]

Former connecting lines

[edit]
Tsukuba Railway train at Iwase station
Kashima Light Railway RM3 (see Mito station entry)
Kashima Sangu Railway train
  • Tsuchiura Station: The Tsukura Railway opened a 40 km (25 mi) line to Iwase on the Mito Line in 1918. Freight services ceased in 1981, and the line closed in 1987.
  • Tsuchiura Station: A 5 km (3.1 mi) line to Ami, electrified at 600 VDC, was operated by the Southern Electric Railway Co. between 1926/28 and 1938.
  • Mito Station: The Mito Seashore Electric Railway Co. opened a line eventually extending 21 km (13 mi) between Kamimito and Nakaminato-Cho, electrified at 600 VDC, between 1922 and 1930. It closed in sections between 1953 and 1966. At Onuki station (12 km (7.5 mi) from Mito) on this line, the Kashima Light Railway Co. operated a 17 km (11 mi) 762 mm (2 ft 6 in) gauge line between 1926 and 1930 to Hokota (see Ishioka station entry below).
  • Mito Station: The Mito Electric Railway Co. operated an 11 km (6.8 mi) line to Okunotani (not electrified, despite the company name) between 1929 and 1936.
  • Ishioka Station: The Kashima Sangu Railway opened a 27 km (17 mi) line to Hokota between 1924 and 1929. Freight services ceased in 2002 and the line closed in 2007.
  • Akatsuka Station: A 25 km (16 mi) line to Gozenyama was opened by the Ibaraki Railway Co. in 1926/27. In 1944/45 the first 4 km (2.5 mi) of the line to Minami Hakamatsuka was electrified. The line closed in sections between 1965 and 1971.
  • Tokai Station: The Ibaraki Prefectural Government operated a 4 km (2.5 mi) 762 mm (2 ft 6 in) gauge line to Muramutsu between 1926 and 1933.
  • Omika Station: An 11 km (6.8 mi) line to Johoku Ota (now Hitachi-Ota on the Suigun Line) was opened by the Johoku Electric Railway in 1928/29. In 1944 the company merged with the Hitachi Electric Railway, and a 7 km (4.3 mi) line to Akukawa was opened in 1947. Both lines were electrified at 600 V DC from opening. CTC signalling was commissioned in 1969, and in 1971 the lines became the first electric railway in Japan converted to a one-person operation. Both lines closed in 2005.
  • Izumi Station: The Onahama Horse tram opened a 762 mm (2 ft 6 in) gauge line 5 km (3.1 mi) to its namesake town in 1907, and extended the line a further 5 km (3.1 mi) to Ena in 1916. The Onahama - Ena section closed in 1936, the company renamed itself the Onahama Port Railway in 1939, and converted the line to 1,067 mm (3 ft 6 in) gauge in 1941. The Ena Railway rebuilt the Onahama - Ena section as 1,067 mm (3 ft 6 in) in 1953. In 1965 a typhoon caused the collapse of a retaining wall, and the Onahama - Ena section formally closed in 1967. The passenger service on the Izumi - Onahama section ceased in 1972, the line is now freight-only operated by the Fukushima Rinkai Railway.
  • Yumoto station: The 10 km (6.2 mi) gauge Iwaki Coalmine Railway operated to Onahama between 1905 and 1944.
  • Yumoto station: A 6 km (3.7 mi) 762 mm (2 ft 6 in) line to Nagahashi was operated by the Iwaki City Council between 1914 and 1929.
  • Uchigo station: The Furukawa Co. built a 7 km (4.3 mi) 762 mm (2 ft 6 in) gauge line to the Kita-Yoshima coal mine in 1905. In 1908 the line was rebuilt to 1,067 mm (3 ft 6 in) gauge and shortened by 1 km (0.62 mi). The mine and line closed in 1969.
  • Iwaki station: The Yoshima and Akai local railways connected here, details of these lines are not currently available.

Basic data

[edit]
  • Operators, distances:
    • East Japan Railway Company (JR East) (Services and tracks)
      • Nippori – Haranomachi – Iwanuma: 343.1 km (213.2 mi)
      • Mikawashima – Sumidagawa – Minami-Senju (Sumidagawa freight branch): 5.7 km (3.5 mi)
      • Mikawashima – Tabata (Tabata freight branch): 1.6 km (1.0 mi)
    • Japan Freight Railway Company (JR Freight) (Services)
      • Mikawashima – Haranomachi – Iwanuma: 341.9 km (212.4 mi)
      • Mikawashima – Sumidagawa – Minami-Senju (Sumidagawa freight branch): 5.7 km (3.5 mi)
      • Mikawashima – Tabata (Tabata freight branch): 1.6 km (1.0 mi)
  • Double/quadruple tracking:
    • Quadruple: Ayase – Toride
    • Double: Nippori – Ayase, Toride – Yotsukura, Hirono – Kido, Ōno – Futaba
  • Electrification:
    • 1,500 V DC: Nippori – Toride, Mikawashima – Sumidagawa – Minami-Senju, Mikawashima – Tabata
    • 20 kV AC, 50 Hz: Fujishiro – Iwanuma. This section of the line, along with a nearby section of the Tsukuba Express in Ibaraki Prefecture (Moriya – Tsukuba), uses alternating current in order to minimize interference with the nearby Kakioka Magnetic Observatory in Ishioka.[20]
    • The dead section is located between Toride and Fujishiro
  • Railway signalling:
  • operation control
    • ATOS: Ueno – Hatori, local train track Ayase – Toride
    • CTC: All other sections

Services

[edit]

The Jōban Line connects Tokyo and the Tōhoku region. After the opening of the Tōhoku Shinkansen in 1982, the Jōban Line was split into two parts at Iwaki. South of Iwaki is mainly double track (Ayase - Toride is quad track), and north of Iwaki is predominantly single track. After the Fukushima disaster in 2011, the Jōban Line is further segmented in the Iwaki – Sendai section.

Shinagawa – Ueno – Iwaki

[edit]

This entire section is served by a variety of services, which will be explained below by the sections where they operate in.

Limited express trains operate across the entire section.

Shinagawa – Ueno – Toride

[edit]

This section is mainly served by local, rapid, medium-distance train services serving the Greater Tokyo area.

  • JL Local (各駅停車): These local trains are commonly referred to as the Jōban Line (Local) 常磐線各駅停車. These local trains operate through services to the Tokyo Metro Chiyoda Line to/from Yoyogi-Uehara via Ayase, where the Jōban Line and Chiyoda Line meet; some trains continue through on the Odakyu Odawara Line to/from Hon-Atsugi. Trains usually originate/terminate at Abiko. At rush hours, trains originate/terminate at Toride. Occasionally trains won't go too far, originating/terminating at Matsudo or Kashiwa.
  • JJ Rapid (快速): Rapid trains are commonly referred to as the Jōban Line (Rapid) 常磐線快速. These services run between the southern termini of Ueno or Shinagawa (via Ueno–Tokyo Line) to the northern termini of Toride. Some trains go on to the Narita Line to Narita via Abiko and are referred to as Jōban・Narita Line (常磐・成田線) trains. Rapid trains will skip some stations between Kita-Senju and Abiko, that local services mentioned above would stop.
    •   Local (Medium distance) (普通) : The "local" here refers to medium distance trains that operate north beyond Toride and stop at all stations north of Toride. South of Toride, they operate as rapid services and are referred to as such.
  •   Special rapid (特別快速) : Special Rapid trains operate between Shinagawa and Tsuchiura, during non-rush hours at hourly intervals. These trains skip stations that even rapid trains would stop. This service is created to compete with the neighbouring railway line, the Tsukuba Express.

Shinagawa – Ueno – Mito – Katsuta

[edit]

Trains that run beyond Toride are distinctly referred to as the Jōban Line (常磐線), without the term "Rapid". Trains that are called Jōban Line (Rapid) cannot go beyond Toride, as their rolling stock cannot be powered by alternating current, which is the type of electrification that the section uses.

This section is mainly served by local trains.

  •   Local (普通) : These trains stop at every station north of Toride. Hence the name "local". There are two types of local trains:
    • Medium distance : These medium distance trains, as mentioned above, operate from central Tokyo to the north of Toride and stop at all stations there. They terminate at various stations, namely Tsuchiura, Mito and Katsuta.
      •   Special rapid (特別快速) : Special Rapid trains stop at every station between Toride and Tsuchiura, so they're essentially the same as the medium distance trains, but become a different service once past south of Toride.
    • Mito Line through service : These trains run through services to the Mito Line via Tomobe Station, operating from Oyama to Katsuta.

Mito – Iwaki

[edit]

This section is mainly served by local trains.

  •   Local (普通) : These trains stop at every station, operating between Mito and Takahagi / Iwaki
    • Medium distance / through service: In the early morning and late-night, few medium distance trains and Mito Line through trains operate to as far as Takahagi, which is located about mid-way in this section.

Iwaki – Sendai

[edit]

Before the Fukushima Daiichi nuclear disaster and the 2011 Tōhoku earthquake and tsunami, local trains and limited express trains used to run across the entire section. However, due to the damages caused after the disaster, the section between Tomioka to Harunomachi had to be closed down, and services were suspended. After certain sections of the line were reconstructed, regular services were gradually allowed to resume.

Iwaki – Tomioka

[edit]

This section is served by local service trains. This section was closed due to damage caused by the 2011 Tōhoku earthquake and tsunami, but it has since reopened. (explained below).

Tomioka – Namie

[edit]

This section, which extends through the exclusion zone surrounding the Fukushima Daiichi nuclear meltdown, was suspended after the 2011 disaster. This section re-opened on 14 March 2020.[3] Before this date, services were provided by an interim bus service.

Namie – Sendai

[edit]

This section is served by local service trains which serve the Greater Sendai area.

The section was once partially closed due to the 2011 disaster, but has since reopened in stages. The reconstructed segment between Hamayoshida and Sōma was reopened on 10 December 2016, prior to which services were provided by an interim bus service.[21][22][23] JR East is currently inspecting the segment between Namie and Odaka in preparation for the surrounding areas being cleared for re-settlement.[24] Train services between Namie and Odaka resumed on 1 April 2017.[10] Train services between Tatsuta and Tomioka resumed on 21 October 2017.[25]

Station list

[edit]

  • The above is a diagram indicating Jōban Line service patterns within Greater Tokyo.
  • For more information on limited express services (i.e.Hitachi and Tokiwa), see their respective pages.

Shinagawa – Ueno – Mito – Iwaki

[edit]
Legend
  • Trains stop at stations marked "●" and pass those marked "|"
  • Few trains stop at stations marked "△"
  • Note: Trains going beyond Tsuchiura and listed as ‘15 cars’ on timetables will be reduced to a max to 10 cars past Tsuchiura station due to shorter platform lengths
Official line name Station Japanese Distance (km) Local Rapid

快速

Special Rapid

特別快速

Tokiwa

ときわ号

Hitachi

ひたち号

Transfers Tracks Location Prefecture
Between
stations
Total (from Nippori) Kankō

各駅停車

Futsuu

普通(medium
distance)

Tōkaidō Main Line Shinagawa
SGWJT03
品川 12.6 to/from Tokyo Metro Chiyoda Line, Odakyu Odawara Line and Odakyu Tama Line[* 1] Two Minato Tokyo
Shimbashi
SMBJT02
新橋 4.9 7.7
  • JY Yamanote Line (JY29)
  • JK Keihin-Tōhoku Line (JK24)
  • JO Yokosuka Line (JO18)
  • JT Tokaido Line
  • G Tokyo Metro Ginza Line (G-08)
  • A Toei Asakusa Line (A-10)
  • U Yurikamome (U-01)
Tokyo
TYOJT01JU01
東京 1.9 5.8 Chiyoda
Tōhoku Main Line
Ueno
UENJU02JJ01
上野 3.6 2.2 Taitō
Nippori
NPRJJ02
日暮里 2.2 0.0
Arakawa
Jōban Line
Mikawashima
JJ03
三河島 1.2 1.2  
Minami-Senju
JJ04
南千住 2.2 3.4 H Tokyo Metro Hibiya Line (H-21)
Tsukuba Express (04)
Kita-Senju
JJ05
北千住 1.8 5.2 [* 2] C Tokyo Metro Chiyoda Line (C-18)
H Tokyo Metro Hibiya Line (H-22)
TS Tobu Skytree Line
Tsukuba Express (05)
Adachi
Ayase
JL19
綾瀬 2.5 7.7 C Tokyo Metro Chiyoda Line (C-19) Four
Kameari
JL20
亀有 2.2 9.9   Katsushika
Kanamachi
JL21
金町 1.9 11.8 KS Keisei Kanamachi Line
Matsudo
JJ06 JL22
松戸 3.9 15.7 SL Shin-Keisei Line Matsudo Chiba
Kita-Matsudo
JL23
北松戸 2.1 17.8  
Mabashi
JL24
馬橋 1.3 19.1 Nagareyama Line
Shim-Matsudo
JL25
新松戸 1.6 20.7 JM Musashino Line
Nagareyama Line (Kōya)
Kita-Kogane
JL26
北小金 1.3 22.0  
Minami-Kashiwa
JL27
南柏 2.5 24.5   Kashiwa
Kashiwa
JJ07 JL28
2.4 26.9 TD Tobu Urban Park Line
Kita-Kashiwa
JL29
北柏 2.3 29.2  
Abiko
JJ08 JL30
我孫子 2.2 31.3 [* 3] Narita Line (Abiko Branch Line), some through services for Narita Abiko
Tennōdai
JJ09 JL31
天王台 2.7 34.0 [* 4]  
Toride
JJ10 JL32
取手 3.4 37.4 [* 4] Jōsō Line Toride Ibaraki
End of suburban section, boundary of 1,500V DC (south) and 20kV 50 Hz AC (north) electrification systems
Fujishiro 藤代 6.0 43.4       Two
Ryūgasakishi 龍ケ崎市 2.1 45.5 Ryūgasaki Line (Sanuki) Ryūgasaki
Ushiku 牛久 5.1 50.6   Ushiku
Hitachino-Ushiku ひたち野うしく 3.9 54.5  
Arakawaoki 荒川沖 2.7 57.2   Tsuchiura
Tsuchiura 土浦 6.6 63.8  
Kandatsu 神立 6.1 69.9    
Takahama 高浜 6.5 76.4   Ishioka
Ishioka 石岡 3.6 80.0  
Hatori 羽鳥 6.5 86.5   Omitama
Iwama 岩間 5.4 91.9   Kasama
Tomobe 友部 6.9 98.8 Mito Line (some trains through to Mito)
Uchihara 内原 4.7 103.5   Mito
Akatsuka 赤塚 5.8 109.3  
Kairakuen 偕楽園 4.1 113.4 [* 5]  
Mito 水戸 1.9 115.3 Suigun Line
Kashima Rinkai Railway Ōarai Kashima Line
Katsuta 勝田 5.8 121.1 Minato Line Hitachinaka
Sawa 佐和 4.2 125.3  
Tōkai 東海 4.7 130.0   Tōkai, Naka District
Ōmika 大甕 7.4 137.4   Hitachi
Hitachi-Taga 常陸多賀 4.6 142.0  
Hitachi 日立 4.9 146.9  
Ogitsu 小木津 5.5 152.4  
Jūō 十王 4.2 156.6  
Takahagi 高萩 5.9 162.5   Takahagi
Minami-Nakagō 南中郷 4.5 167.0   Kitaibaraki
Isohara 磯原 4.6 171.6  
Ōtsukō 大津港 7.1 178.7  
Nakoso 勿来 4.5 183.2   Iwaki Fukushima
Ueda 植田 4.6 187.8  
Izumi 7.2 195.0  
Yumoto 湯本 6.5 201.5  
Uchigō 内郷 3.5 205.0  
Iwaki いわき 4.4 209.4 Banetsu East Line
  1. ^ All trains through to/from Yoyogi-Uehara; some trains continue through on the Odakyu Odawara Line to/from Hon-Atsugi and the Odakyu Tama Line to/from Karakida
  2. ^ Local trains to/from the Tokyo Metro Chiyoda Line use the underground Chiyoda Line platforms.
  3. ^ Some rapid trains run between Ueno and Narita via Abiko
  4. ^ a b Only mornings and evenings between Abiko and Toride. From March 2021, services are going to run only on weekday mornings and evenings.
  5. ^ Daytime Mito-bound trains stop here only during the Japanese plum blossom season

Iwaki – Iwanuma – Sendai

[edit]

Legend

  • Trains stop at stations marked "●" and pass those marked "|"
  • Few trains stop at stations marked "△"
  • Stations marked "◇" are located on passing loops and allow trains in opposite directions to pass each other
Official line name Station Japanese Distance (km) Local

普通

Hitachi

ひたち号

Transfers Tracks Location Prefecture
Between
stations
Total (from Nippori)
Jōban Line Iwaki いわき 209.4 Two Iwaki Fukushima
Kusano 草野 5.4 214.8  
Yotsukura 四ツ倉 4.4 219.2  
Hisanohama 久ノ浜 4.8 224.0  
Suetsugi 末続 3.6 227.6  
Hirono 広野 4.8 232.4   Two Hirono, Futaba District
J-Village Jヴィレッジ駅 3.5 235.9   Naraha, Futaba District
Kido 木戸 1.9 237.8  
Tatsuta 竜田 3.1 240.9  
Tomioka 富岡 6.9 247.8   Tomioka, Futaba District
Yonomori 夜ノ森 5.2 253.0  
Ōno 大野 4.9 257.9   One Ōkuma, Futaba District
Futaba 双葉 5.8 263.7   Futaba, Futaba District
Namie 浪江 4.9 268.6   Namie, Futaba District
Momouchi 桃内 4.9 273.5   Minamisōma
Odaka 小高 4.0 277.5  
Iwaki-Ōta 磐城太田 4.9 282.4  
Haranomachi 原ノ町 4.5 286.9  
Kashima 鹿島 7.5 294.4  
Nittaki 日立木 6.7 301.1   Sōma
Sōma 相馬 5.9 307.0  
Komagamine 駒ヶ嶺 4.4 311.4   Shinchi, Sōma District
Shinchi 新地 4.4 315.8  
Sakamoto 坂元 5.4 321.2   One Yamamoto, Watari District Miyagi
Yamashita 山下 4.5 325.7  
Hamayoshida 浜吉田 3.9 329.6   Watari, Watari District
Watari 亘理 5.0 334.6  
Ōkuma 逢隈 3.2 337.8  
Iwanuma 岩沼 5.3 343.1 Tōhoku Main Line (for Fukushima) ^ Iwanuma
Tōhoku Main Line
Tatekoshi 館腰 3.7 346.8   Two Natori
Natori 名取 3.5 350.3 Sendai Airport Line
Minami-Sendai 南仙台 2.7 353.0   Taihaku-ku, Sendai
Taishidō 太子堂 2.2 355.2  
Nagamachi 長町 1.0 356.2 Sendai Subway Namboku Line
Sendai 仙台 4.5 360.7 Tohoku Shinkansen

Akita Shinkansen

Tohoku Main Line (for Ichinoseki and Rifu)

Senzan Line

Senseki Line
Sendai Subway Namboku Line

Sendai Subway Tōzai Line

Aoba-ku, Sendai

Rolling stock

[edit]

Local / Rapid service stock

[edit]

Shinagawa – Ueno – Iwaki

[edit]
A JR East E233-2000 series train
A Tokyo Metro 16000 series train
An Odakyu 4000 series train
A Joban Line E231 series EMU, July 2019
An E531 series EMU, October 2017
An E501 series EMU, April 2019
  • Jōban Line
    • E501 series 10 and 5 car EMUs (Operates only between Tsuchiura and Kusano)
    • E531 series 10 and 5-car EMUs (can run as 15 car configuration as far as Tsuchiura station)

Iwaki – Sendai

[edit]
A JR East 701 series train at Kashima Station, May 2014
A JR East E721 series train at Sendai Station, August 2010

Limited express stock

[edit]

Past

[edit]

See also

[edit]

References

[edit]
  1. ^ "Jōban Line". Japan Visitor.
  2. ^ "JR Jōban Line: Connecting Tokyo with Tohoku Region". Japan RailPass. 24 April 2020.
  3. ^ a b c d "Tsunami-hit railway line partially reopens - News - NHK WORLD - English". .nhk.or.jp. Retrieved 10 December 2016.
  4. ^ Briginshaw, David (8 January 2014). "JR East selects Thales to design first Japanese CBTC". hollandco.com. Holland. Retrieved 9 January 2014.
  5. ^ JR常磐線、広野―竜田で試運転を開始 [Test-running starts on JR Joban Line between Hirono and Tatsuta]. Asahi Shimbun Digital (in Japanese). Japan: The Asahi Shimbun Company. 11 May 2014. Retrieved 12 May 2014.
  6. ^ "Train services resume in evacuation zone". The Japan news. Japan: The Yomiuri Shimbun Company. 1 June 2014. Archived from the original on 6 June 2014. Retrieved 7 June 2014.
  7. ^ "Evacuation order lifted in Minami-Soma after 5 years". The Asahi Shimbun. Japan. 12 July 2016. Retrieved 12 July 2016.
  8. ^ "⾸都圏エリアへ 「駅ナンバリング」を導⼊します" [Introduce “station numbering” to the Tokyo metropolitan area] (PDF). jreast.co.jp (in Japanese). 6 April 2016. Archived from the original (PDF) on 7 December 2022. Retrieved 7 January 2023.
  9. ^ Kusamachi, Yoshikazu (7 April 2016). "JA・JK・JT・AKB…JR東日本、首都圏で駅ナンバリングなど導入へ" [JA, JK, JT, AKB … JR East to introduce station numbering in the Tokyo metropolitan area]. Response Automotive Media (in Japanese). Archived from the original on 6 August 2022. Retrieved 7 January 2023.
  10. ^ a b "Photo Journal: All aboard". Mainichi Daily News. 1 April 2017. Retrieved 21 March 2018.
  11. ^ "JR East partially reopens line halted since 2011 nuclear disaster - The Mainichi". Archived from the original on 21 October 2017.
  12. ^ "What remains undone in the post-3/11 reconstruction". 12 March 2020.
  13. ^ "JR東日本で初めてとなる自動列車運転装置(ATO)の使用開始について" [About the start of the first use of Automatic Train Operation (ATO) in JR East] (PDF) (Press release) (in Japanese). East Japan Railway Company. 16 February 2021. Retrieved 16 February 2021.
  14. ^ "常磐線、自動運転3月から開始へ JR東日本で初めて" [Joban Line automatic train operation to start from March for the first time in JR East]. kahoku.news (in Japanese). Kahoku Shimpō. 16 February 2021. Retrieved 16 February 2021.
  15. ^ "2022年3月ダイヤ改正について" (PDF). JR East. 17 December 2021. Archived from the original (PDF) on 17 December 2021.
  16. ^ "JR常磐線 ホームや橋が損傷 再開の見通し立たず". NHK Fukushima. 17 March 2022. Archived from the original on 17 March 2022.
  17. ^ "生活の足復旧に利用者ら安堵 JR在来線、一部区間除き運転再開". 河北新報オンラインニュース (in Japanese). 18 March 2022. Retrieved 18 May 2022.
  18. ^ a b "地震で運休のJR常磐線、一部再開…24日に全線再開へ". 読売新聞オンライン (in Japanese). 21 March 2022. Retrieved 18 May 2022.
  19. ^ "JR常磐線が全線運転再開 品川―仙台間、5時間~5時間半で直通運転". 河北新報オンラインニュース (in Japanese). 24 March 2022. Retrieved 18 May 2022.
  20. ^ 河尻, 定 (24 April 2015). "座れぬ・行き先?… 乗客の声で検証、上野東京ライン". Nihon Keizai Shimbun. Retrieved 24 April 2015.
  21. ^ JR East press release: "Archived copy" (PDF). Archived from the original (PDF) on 30 January 2012. Retrieved 14 March 2016.{{cite web}}: CS1 maint: archived copy as title (link)
  22. ^ Hongo, Jun, "A year on, Tohoku stuck in limbo", The Japan Times, 11 March 2012, p. 1.
  23. ^ "水戸駅・常磐線|JR東日本旅客鉄道株式会社 水戸支社|東日本大震災による列車影響と運転見込みについて". Jrmito.com. Retrieved 10 December 2016.
  24. ^ http://www.jreast.co.jp/pdf/damage03.pdf [bare URL PDF]
  25. ^ "7-km part of Joban Line reopens in Fukushima". The Japan Times Online. 21 October 2017. Retrieved 21 October 2017.
  26. ^ 203系が営業運転から離脱 [203 series withdrawn from revenue service]. Japan Railfan Magazine Online (in Japanese). Japan: Koyusha Co., Ltd. 28 September 2011. Retrieved 28 September 2011.
[edit]