Jump to content

Jakkur Cross metro station

Coordinates: 13°04′13″N 77°35′36″E / 13.07038°N 77.59347°E / 13.07038; 77.59347
From Wikipedia, the free encyclopedia

Jakkur Cross
Namma Metro station
Under construction of this metro station as of October 2024 under Phase 2B of Blue Line of Namma Metro
General information
LocationJakkuru Layout, Byatarayanapura, Bengaluru, Karnataka 560092
Coordinates13°04′13″N 77°35′36″E / 13.07038°N 77.59347°E / 13.07038; 77.59347
Owned byBangalore Metro Rail Corporation Ltd (BMRCL)
Operated byNamma Metro
Line(s)Blue Line
PlatformsIsland platform (TBC)
Platform-1 → Krishnarajapura / Central Silk Board
Platform-2 → KIAL Terminals
Platform Numbers (TBC)
Tracks2 (TBC)
ConnectionsMainline rail interchange Kodigehalli railway station
Construction
Structure typeElevated, Double track
Platform levels2 (TBC)
Parking(TBC)
Accessible(TBC)
Other information
StatusUnder Construction
Station codeJKRC (TBC)
History
OpeningJune 2026; 18 months' time (June 2026) (TBC)
Electrified(TBC)
Services
Preceding station Namma Metro Following station
Kodigehalli Blue Line
(Future Service and skipping Jakkur Plantation)
Yelahanka
Location
Map

Jakkur Cross is an upcoming elevated metro station on the North-South corridor of the Blue Line[1] of Namma Metro in Bangalore, India. This metro station will consist of the main Phoenix Mall of Asia, Jakkur suburban area, Jakkur Aerodrome followed by many neighbouring areas like Kodigehalli, Jakkur Lake and Gandhi Krishi Vigyana Kendra, a Deemed-to-be-University in North Bengaluru, India. This metro station is slated to be operational around June 2026.[2][3][4][5]

History

[edit]

On November 17 2020, the Bangalore Metro Rail Corporation Limited (BMRCL) invited bids for the construction of the Jakkur Cross metro station, part of the 11.678 km Reach 2B – Package 2 (Hebbala - Bagalur Cross) of the 37.692 km Blue Line of Namma Metro. On September 14 2021, Nagarjuna Construction Company Ltd. (NCC Ltd.) was chosen as the lowest bidder for this segment, with their proposal closely matching the initial cost estimates. [6] As a result, the contract was awarded to the company, which led to the beginning of the construction works of this metro station as per the agreed terms. [7]

Station layout

[edit]

Station Layout - To Be Confirmed

Jakkur Cross track layout
P#
P#
Station with two tracks and one Island platform
* Skipping Jakkur Plantation
** Under Construction
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Ticket/token, shops
L2 Platform #
Southbound
Towards → Krishnarajapura / Central Silk Board
Next Station: Kodigehalli
Island platform | Doors will open on the right Disabled access
Platform #
Northbound
Towards ← KIAL Terminals
Next Station: Yelahanka (Skipping Jakkur Plantation)

Connections

[edit]

Entry/Exit

[edit]

See also

[edit]

References

[edit]
  1. ^ "Bengaluru Metro Blue Line: Explore the City Like Never Before! - TimesProperty". timesproperty.com. Retrieved 14 December 2023.
  2. ^ "L&T bags track contracts worth ₹501 crore for Bangalore Metro Phase 2A & 2B | Metro Rail Today". Metro Rail Today: Gateway to Rail & Metro Industry. Retrieved 14 December 2023.
  3. ^ "Metro line to Bengaluru Airport to be ready by June 2026: D K Shivakumar". The Indian Express. 6 June 2023. Retrieved 14 December 2023.
  4. ^ "Bengaluru Airport Metro Line from KIA to Devanahalli Set for Completion by June 2026". TimesNow. 7 June 2023. Retrieved 14 December 2023.
  5. ^ "Metro's ORR, Airport line to be ready by Sept 2026, will benefit IT industry hugely: BMRCL". The New Indian Express. Retrieved 14 December 2023.
  6. ^ "NCC Wins Bangalore Metro Airport Line's Construction Work". The Metro Rail Guy. 14 September 2021. Retrieved 24 October 2024.
  7. ^ Service, Express News (16 September 2021). "Nagarjuna Construction Company wins bid to build Namma Metro's Airport Line". The New Indian Express. Retrieved 24 October 2024.
[edit]