Doordarshan Kendra metro station
Appearance
The topic of this article may not meet Wikipedia's general notability guideline. (January 2024) |
Doordarshan Kendra | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Ahmedabad Metro station | |||||||||||
General information | |||||||||||
Location | Sunrise Park, Gurukul, Ahmedabad, Gujarat 380052 | ||||||||||
Coordinates | 23°02′53″N 72°31′28″E / 23.04817°N 72.52447°E | ||||||||||
Owned by | Gujarat Metro Rail Corporation Limited | ||||||||||
Operated by | Ahmedabad Metro | ||||||||||
Line(s) | Blue Line | ||||||||||
Platforms | Side platform Platform-1 → Vastral Gam Platform-2 → Thaltej | ||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Structure type | Elevated, Double track | ||||||||||
Platform levels | 2 | ||||||||||
Accessible | Yes | ||||||||||
Other information | |||||||||||
Status | Operational | ||||||||||
History | |||||||||||
Opening | 30 September 2022 | ||||||||||
Electrified | 750 V DC third rail | ||||||||||
Services | |||||||||||
| |||||||||||
|
Doordarshan Kendra is an elevated metro station on the East-West Corridor of the Blue Line of Ahmedabad Metro in Ahmedabad, India. This metro station consists of the main Doordarshan Kendra (Ahmedabad) along with its adjacent Ahmedabad Education Society Ground and SKUM College of Physiotherapy. This phase of the metro system was opened to the public on 30 September 2022.[1][2][3][4]
Station layout
[edit]Doordarshan Kendra track layout | ||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||||||||||||||||||||||||||||||||||
Station with two tracks and two side platforms
|
G | Street level | Exit/Entrance |
L1 | Mezzanine | Fare control, station agent, Metro Card vending machines, crossover |
L2 | Side platform | Doors will open on the left | |
Platform 1 Eastbound |
Towards → Vastram Gam Next Station: Gurukul Road | |
Platform 2 Westbound |
Towards ← Thaltej | |
Side platform | Doors will open on the left | ||
L2 |
Entry/Exit
[edit]This section is empty. You can help by adding to it. (August 2023) |
See also
[edit]References
[edit]- ^ "PM Modi inaugurates Ahmedabad Metro first phase, takes a ride". Economic Times India Times. Retrieved 3 January 2022.
- ^ www.ETRealty.com. "Prime minister inaugurates phase-1 of Ahmedabad Metro rail project - ET RealEstate". ETRealty.com. Retrieved 4 October 2022.
- ^ "Huge demand on Day 1 of Ahmedabad Metro". The Indian Express. 2 October 2022. Retrieved 4 October 2022.
- ^ "Prime Minister Modi inaugurates phase-1 of Ahmedabad Metro rail project". The Economic Times. Retrieved 4 October 2022.