Jump to content

APMC metro station

Coordinates: 22°59′52″N 72°32′14″E / 22.99773°N 72.53725°E / 22.99773; 72.53725
From Wikipedia, the free encyclopedia

APMC
Ahmedabad Metro station
General information
LocationGupta Nagar, Vasna, Ahmedabad, Gujarat 380007
Coordinates22°59′52″N 72°32′14″E / 22.99773°N 72.53725°E / 22.99773; 72.53725
Owned byGujarat Metro Rail Corporation Limited
Operated byAhmedabad Metro
Line(s)Red Line
PlatformsSide platform
Platform-1 → Sector-1 / GIFT City
Platform-2 → Train Terminates Here
Tracks2
Construction
Structure typeElevated, Double track
Platform levels2
AccessibleYes Disabled access
Other information
StatusOperational
History
Opened6 October 2022; 2 years ago (6 October 2022)
Electrified750 V DC third rail
Services
Preceding station Ahmedabad Metro Following station
Jivraj Park
towards Sector-1 or GIFT City
Red Line Terminus
Location
Map

APMC is the elevated southern terminal metro station on the North-South Corridor of the Red Line of Ahmedabad Metro in Ahmedabad, India.[1] Around this metro station holds the main Shri Chimanbhai Jivabhai Patel Market which is famous for local groceries in southern Ahmedabad. To the south leads towards the Gyaspur Metro Train Depot which will hold all Red Line metro trains for maintenance purposes. This metro station was inaugurated on 30 September 2022 by Prime Minister Narendra Modi and was opened to the public on 6 October 2022.[2][3][4][5]

Station layout

[edit]
APMC track layout
P1
P2
to Train Terminates Here
Station with two tracks and two side platforms
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform 2
Southbound
Towards → Train Terminates Here
Platform 1
Northbound
Towards ← Sector-1

Next Station: Jivraj Park

Side platform | Doors will open on the left Disabled access
L2

Entry/Exit

[edit]

See also

[edit]

References

[edit]
  1. ^ "Ahmedabad: Metro service on North-South corridor to begin on October 6". The Indian Express. 3 October 2022. Retrieved 12 August 2023.
  2. ^ "Ahmedabad: Metro service on North-South corridor to begin on October 6". The Indian Express. 3 October 2022. Retrieved 12 August 2023.
  3. ^ "Ahmedabad: North-South corridor metro service to be operational from October 6". TimesNow. 5 October 2022. Retrieved 12 August 2023.
  4. ^ "Huge demand on Day 1 of Ahmedabad Metro". The Indian Express. 2 October 2022. Retrieved 4 October 2022.
  5. ^ "Prime Minister Modi inaugurates phase-1 of Ahmedabad Metro rail project". The Economic Times. Retrieved 4 October 2022.
[edit]