Jump to content

Dongdaqiao station

Coordinates: 39°55′23″N 116°27′06″E / 39.923054°N 116.451657°E / 39.923054; 116.451657
From Wikipedia, the free encyclopedia
Dongdaqiao

东大桥
Beijing Subway
Platform
General information
LocationEast Workers' Stadium Road (工人体育场东路) / Dongdaqiao Road (东大桥路) and Chaoyangmen Outer Street / North Chaoyang Road (朝阳北路)
Chaoyang District, Beijing
China
Operated byBeijing Mass Transit Railway Operation Corporation Limited
Line(s)     Line 6
Platforms2 (1 island platform)
Tracks2
Construction
Structure typeUnderground
AccessibleYes
History
OpenedDecember 30, 2012; 11 years ago (2012-12-30)
Services
Preceding station Beijing Subway Following station
Chaoyangmen
towards Jin'anqiao
Line 6 Hujialou
towards Lucheng
Location
Dongdaqiao is located in Beijing
Dongdaqiao
Dongdaqiao
Location in central Beijing

Dongdaqiao (simplified Chinese: 东大桥站; traditional Chinese: 東大橋站; pinyin: Dōngdàqiáo Zhàn) is a station on Line 6 of the Beijing Subway.[1] This station opened on December 30, 2012.[2][3]

Station layout

[edit]

The station has an underground island platform.

Exits

[edit]

There are 4 exits, lettered A, B, D1, and D2. Exit D1 is accessible.

References

[edit]
  1. ^ "地铁6号线一期沿线站名确定-北京网交通出行". Archived from the original on 2013-12-24. Retrieved 2013-03-19.
  2. ^ "轨道交通6号线预计年底试运营 五项第一彰显北京地铁新奇迹 - 要闻速递 - 北京市交通委员会". Archived from the original on 2012-11-11. Retrieved 2012-12-26.
  3. ^ 北京四地铁线30日开通 首末车时间确定 (in Simplified Chinese). 新京报. Retrieved 26 December 2012.
[edit]

39°55′23″N 116°27′06″E / 39.923054°N 116.451657°E / 39.923054; 116.451657