Jump to content

Central Spine Road

From Wikipedia, the free encyclopedia
Federal Route 34 shield}}
Federal Route 34
Kuala Krai–Kuala Pilah Highway, Central Spine Road
Lebuhraya Kuala Krai–Kuala Pilah, Jalan Utama Tengah
Route information
Length340 km (210 mi)
Existed2012–present
HistoryExpected to be completed in 2026
Major junctions
North endKuala Krai, Kelantan
Major intersections FT 34 Kota Bharu–Kuala Krai Expressway
FT 8 Federal Route 8
FT 185 Simpang Pulai–Kuala Berang Highway
East Coast Expressway FT 2 AH141 Kuala Lumpur–Karak Expressway
FT 2 Federal Route 2
FT 9 Federal Route 9
South endSimpang Pelangai, Pahang / Kuala Pilah, Negeri Sembilan
Location
CountryMalaysia
Primary
destinations
Gua Musang
Sungai Yu
Chegar Perah
Kampung Relong
Kuala Lipis
Raub / Sungai Ruan
Bentong
Karak
Mempaga
Kuala Pilah
Bahau
Seremban
Highway system
CSR at Raub Utara
A completed section of the CSR near Raub, Pahang.

Lingkaran Tengah Utama Expressway, previously known as Central Spine Road (CSR) or Kuala Krai–Kuala Pilah Highway, Federal Route 34, is a new toll-free highway under construction in the center of Peninsular Malaysia. The 325 km (201 miles) highway is built to eventually replace the former two-lane Malaysia Federal Route 8 (Gua Musang Highway) and Malaysia Federal Route 9 (Karak–Tampin highway). Construction of CSR starts at Package 3 which is from Merapoh to Kampung Relong. It commences at Package 3 as the Gua Musang Highway passes through Chegar Perah which is prone to roadkill. The highway has a long eco-viaduct built in this section. Package 5 which is from north Raub to Karak will be built next, which will connect it to E8 Kuala Lumpur–Karak Expressway bypassing Bentong and Mempaga. This will help detour traffic from the steep mountainous grade between Raub and Bentong. It was formerly known as Central Spine Expressway.

History

[edit]
  • Phase 1 is a 51 km stretch from Kuala Krai to Jambatan Sungai Lakit in Kelantan.
  • Phase 2 spans 63 km from Jambatan Sungai Lakit to Gua Musang in Kelantan
  • Phase 3 covers 107 km from Gua Musang to Kampung Relong in Pahang.
  • Phase 4 comprises 56 km from Kampung Relong to Raub in Pahang
  • Phase 5, 54 km from Raub to Bentong
  • Phase 6, is 47 km and connects Bentong and Simpang Pelangai. (this section is deferred)

On 15 December 2016, section 3H (Kg. Kechur to Kg. Sbrg. Jelai) was opened to traffic. As of July 2024, Package One from Kuala Krai to the Sungai Lakit Bridge is 11.59% complete; Package Two from the Sungai Lakit Bridge to Gua Musang is 22.40% complete. Package Three from Gua Musang to Kampung Relong is 84.25% complete; Package Four from Kampung Relong to Raub is 63.69% complete.

Users can now access Package Five from Raub to Bentong, and Package Six from Bentong to the LPT Junction is 30.07% complete.

Features

[edit]
The CSR/LTU near Merapoh.
  • Four lanes, two on each side[1]
  • A long eco-viaduct for wild animals crossing
  • Some sections are concrete paved
  • Kilometre markers along the road

In most sections, it is built under JKR R5 road standards, allowing maximum speed limit of up to 90 km/h.

From Kampung Sungai Yu to Chegar Perah and from Chegar Perah to Bukit Tujuh, it overlaps Federal Route 8 Merapoh Highway.

There are no sections with motorcycle lanes.

List of interchanges

[edit]
State District Km Exit Name Destination Notes
Through to FT 34 Kota Bharu–Kuala Krai Expressway
Kelantan Kuala Krai Kuala Krai
FT 34 Lingkaran Tengah Utama Expressway
Package 1
Start/End of highway
Under construction
FT 34 Lingkaran Tengah Utama Expressway
Package 1
Under construction
Gua Musang Sungai Lakit Bridge
FT 34 Lingkaran Tengah Utama Expressway
Package 2
Under construction
FT 34 Lingkaran Tengah Utama Expressway
Package 2
Under construction
Gua Musang
FT 34 Lingkaran Tengah Utama Expressway
Package 3
Under construction
Mentara
Kelantan Darul Naim
Gua Musang district border
Kelantan–Pahang border
Pahang Pahang Darul Makmur
Lipis district border
FT 34 Lingkaran Tengah Utama Expressway
Under construction
FT 34 Lingkaran Tengah Utama Expressway
Package 3
(Gua Musang–Kampung Relong)
Section 3F
JKR border limit
Lipis -- Kubang Rusa Interchange FT 8 Merapoh Highway

West
Kampung Kubang Rusa
Merapoh
Gua Musang
Kuala Krai
Kota Bharu
FT 185 Simpang Pulai–Kuala Berang Highway
Cameron Highland
Ipoh
Tasik Kenyir
Kuala Terengganu

East
Kampung Sungai Yu
Pusat Rekreasi Sungai Yu
Parclo B-2 interchange
Sungai Yu Eco-Viaduct
Eco-Viaduct
-- Sungai Yu Interchange FT 8 Merapoh Highway

West
Kampung Sungai Yu
Pusat Rekreasi Sungai Yu
Merapoh
Trumpet interchange
-- Chegar Perah FT 8 Merapoh Highway

West
Chegar Perah
LILO Kuala Krai bound
-- Chegar Perah FT 8 Merapoh Highway

West
Chegar Perah
LILO Kuala Krai bound
U-Turn FT 8 Lingkaran Tengah Utama Expressway

U-Turn
Chegar Perah
Sungai Yu
Kubang Rusa
Mentara
Gua Musang
Kuala Krai
Kota Bharu
U-Turn south bound
Under Construction
FT 34 Lingkaran Tengah Utama Expressway
Package 3
(Gua Musang–Kampung Relong)
Section 3F
JKR border limit
FT 34 Lingkaran Tengah Utama Expressway
Under construction
FELDA Telang
Kampung Kechur
FT 34 Lingkaran Tengah Utama Expressway
Package 3
(Gua Musang–Kampung Relong)
Section 3H
JKR border limit
Kampung Seberang Jelai
FT 34 Lingkaran Tengah Utama Expressway
Package 3
(Gua Musang–Kampung Relong)
Section 3H
JKR border limit
FT 34 Lingkaran Tengah Utama Expressway
Package 3J
Under construction
Kampung Relong
FT 34 Lingkaran Tengah Utama Expressway
Package 3
Under construction
FT 34 Lingkaran Tengah Utama Expressway
Package 4
Under construction
Lipis–Raub district border
FT 34 Lingkaran Tengah Utama Expressway
Package 5
Under construction
Raub JKREXIT9 Raub (U) Interchange FT 8 Federal Route 8
Raub

Sungai Ruan

Diamond interchange
Raub–Bentong district border
Bentong JKREXIT8 Raub (S) Interchange West

FT 1502
Raub Universiti Teknologi MARA (UiTM) Raub Campus

FT 218
Bukit Fraser East FT 1502
FELDA Krau

Half diamond interchange
JKREXIT7 Bentong (U) Interchange East

FT 1498 Kampung Lebu Northwest FT 8 FELDA Lurah Bilut

Diamond interchange
JKREXIT6 Mempaga Interchange East

FT 1498 FELDA Mempaga Southwest East Coast Expressway FT 2 AH141 Kuala Lumpur–Karak Expressway

Kuala Lumpur Kuantan Genting Highlands

Roundabout interchange
6A Bentong (S) Interchange North

FT 8 Bentong

Half diamond interchange
809 KLK Interchange West

East Coast Expressway FT 2 AH141 Kuala Lumpur–Karak Expressway
Kuala Lumpur
Genting Highlands

Trumpet interchange, entry only westbound
FT 34 Lingkaran Tengah Utama Expressway
Under construction
Kampung Telemong
Mancis
FT 34Lingkaran Tengah Utama Expressway
Start/End of highway
Under construction
-- Simpang Pelangai Northwest
FT 9 Karak
FT 9 Mancis

Southeast
FT 34 Kuala Klawang
FT 9 Kuala Pilah
FT 51 Seremban
T-junctions

References

[edit]
[edit]