Jump to content

Category talk:Hydroelectric power stations in Kerala

Page contents not supported in other languages.
From Wikipedia, the free encyclopedia

The Kerala State Electricity Board has 24 hydroelectric projects



Sl. No.


Name of Station

Installed Capacity (MW)

Firm annual Generation Capability

Nos

MW

MU

Hydro Electric Projects (KSEB)


Idukki

6 x 130 MW

780

2398


Sabarigiri

5 x 55MW + 60 MW

335

1338


Idamalayar

2 x 37.5 MW

75

380


Sholayar

3 x 18 MW

54

233


Pallivasal

3 x 4.5 MW + 3 x 8 MW

37.5

284


Kuttiyadi

3 x 25 MW + 3 x 50 MW

225

583


Panniar

2 x 15 MW

30

158


Neriamangalam

3 x 17.55 MW + 25 MW

77.65

295


Lower Periyar

3 x 60 MW

180

493


Poringalkuthu & PLBE

4 x 8 MW +16 MW

48

244


Sengulam

4 x 12 MW

48

182


Kakkad

2 x 25 MW

50

262

Sub Total (HEP)

49 Nos

1940.2

6850

Small Hydro Electric Projects


Kallada

2 x 7.5 MW

15

65.00


Peppara

1 x 3 MW

3

11.50


Malankara

3 x 3.5 MW

10.5

44.00


Madupatty

1 x 2 MW

2

6.40


Malampuzha

1 x 2.5 MW

2.5

5.60


Lower Meenmutty

1 x 0.5 MW +2 x 1.5 MW

3.5

7.63


Chembukadavu - 1

3 x 0.9 MW

2.7

6.59


Chembukadavu - 2

3 x 1.25 MW

3.75

9.03


Urumi -1

3 x 1.25 MW

3.75

9.72


Urumi -2

3 x 0.8 MW

2.4

6.28


Kuttiyadi Tail Race

3 x 1.25 MW

3.75

15.00


Poozhithode SHEP

3 x 1.6 MW

4.8


Sub Total (SHEP)

29 Nos

57.65

186.75

Total (Hydel units)

78 Nos

1998

7036.8 — Preceding unsigned comment added by 117.207.232.147 (talk) 14:30, 5 January 2014 (UTC)[reply]