Jump to content

Alveo Financial Tower

Coordinates: 14°33′32″N 121°1′0″E / 14.55889°N 121.01667°E / 14.55889; 121.01667
From Wikipedia, the free encyclopedia

14°33′32″N 121°1′0″E / 14.55889°N 121.01667°E / 14.55889; 121.01667

Alveo Financial Tower
Alveo Financial Tower as seen from Ayala Avenue.
Map
General information
StatusTopped Off
TypeOffice
Location6794 Ayala Avenue, Makati, Philippines
Construction started1996
Completed2020
OwnerJAKA Group of Companies (1990s–?)
Enrile family
(until 2014)
Ayala Land Inc. (2014–present)
Height
Roof188 m (616.80 ft)
Technical details
Floor count49
Design and construction
Architecture firmHellmuth, Obata and Kassabaum
(under JAKA)
DeveloperJAKA Property Group (until 2014)
Ayala Land (2014–present)
References
[1][2]

The Alveo Financial Tower, formerly known as the JAKA Tower, is an office skyscraper under construction in Makati, Philippines.[3] The construction of the tower formerly owned by the JAKA Group of the family of Senator Juan Ponce Enrile commenced in 1996 but was halted in 1998. In 2014 it was acquired by Ayala Land which later through its unit Alveo Land relaunched the tower as the Alveo Financial Tower in 2015.

Construction

[edit]
The tower as the JAKA Tower in 2015.

As the JAKA Tower

[edit]

Alveo Financial Tower was originally named as the JAKA Tower. The tower's construction commenced in 1996 and was planned to be completed in 1999.[4][5]

Construction was already in its 21st floor when the tower then named as the JAKA Tower was halted, due to the negative financial effects brought upon by the 1997 Asian Financial Crisis.[6] The JAKA Group was forced to surrender its property to lenders.[7] It was planned for works to resume in 2005 or 2006, but it did not push through. The only activity in the past 10 years was the application of protective coating on the exposed structural reinforcement bars of the building.

The building was designed by the architectural firm Hellmuth, Obata and Kassabaum, and was to be the first highrise project of Senator Juan Ponce Enrile's JAKA Property Group.[2][6]

It was originally designed to rise 49 stories high, with a height of 185.9 meters (609.91 ft) to its roof. Its design was to have cladded finishing on its podium, and external curtain glass walls on the rest of the building. When finished, it was supposed to be one of the Philippines' tallest buildings at that time.[2][5]

Acquisition by Ayala Land

[edit]

In December 2012, Jack Enrile announced that his father, Juan Ponce Enrile has decided to sell the property due to lack of time and resources to finish the building. This is after Enrile's family bought back the property.[7]

In September 2014, developer Ayala Land acquired the JAKA Tower, previously owned by Juan Ponce Enrile's family and plans to integrate the property in its City Gate development project. Ayala said that it would not demolish the existing building which is still structurally sound even after almost 15 years of abandonment.[6] Ayala Land planned to commence the buildings redevelopment sometime in 2015 and estimates the building's completion within three or four years. The company intends the JAKA Tower to be an office building. However, it also disclosed that the building may not be built to its originally intended height.[5]

Relaunch as the Alveo Financial Tower

[edit]

On September 29, 2015, Ayala Land through its unit Alveo Land, relaunched the JAKA Tower as the Alveo Financial Tower. The building will still have 49 stories[8] (48 floors with a roof deck[4]). The Alveo Financial Tower will be an office building with plans for retail areas on its first three floors as well as a "business activity area" on the 5th and 17th floors. The tower will host 363 office units. It is reported that the office building will stand on a 2,400 square meters (26,000 sq ft) parcel of land and will have a gross floor area of 63,739 square meters (686,080 sq ft). The tower's turnover date is scheduled for 2020. Tupaz of the Alveo's Project Development Group said that they have "minimum disturbance plan" for the resumption of the tower's construction.[8]

Alveo tasked foreign structural and civil engineering firm Magnusson Klemencic Associates and local engineering firm Sysquared + Associates to conduct a structural integrity assessment on the unfinished structure which took three months to complete. The two firms concluded that the building is structurally sound and suitable for use. Architectural firm William V. Coscolluela & Associates consulted on the original structure.[9]

See also

[edit]

References

[edit]
  1. ^ Emporis Buildings JAKA Tower, Makati[usurped]
  2. ^ a b c Skyscraperpage.com Jaka Tower
  3. ^ Savills, K. M. C. "Alveo Financial Tower". kmcmaggroup.com. Retrieved 2021-04-26.
  4. ^ a b Reyes, Rizal Raoul (6 October 2015). "Alveo develops a new power address". BusinessMirror. Retrieved 1 January 2017.
  5. ^ a b c Mercurio, Richmond (14 January 2015). "ALI to relaunch JAKA Tower redev't". The Philippine Star. Retrieved 14 January 2015.
  6. ^ a b c Austria, Jenniffer (28 September 2014). "Ayala seals Jaka Tower buyout". Manila Standard Today. Retrieved 14 January 2015.
  7. ^ a b Cabacungan, Gil (2012-12-05). "Enrile gives up monument to self, now an eyesore on Ayala Avenue". The Philippine Daily Inquirer. Retrieved 2013-04-30.
  8. ^ a b Dela Paz, Chrise (29 September 2015). "Ayala Land unit sees over P10B revenue from new prime office". Rappler. Retrieved 31 December 2016.
  9. ^ Mangawang, Cesar (27 October 2015). "49-story HQ-type condo dev't on Ayala Avenue". Philippine Daily Inquirer. Retrieved 1 January 2017.