Alltwalis Wind Farm
Appearance
Alltwalis Wind Farm | |
---|---|
Official name | Blaengwen Wind farm |
Country | Wales, United Kingdom |
Location | near Brechfa Forest, Carmarthenshire |
Coordinates | 51°58′24″N 04°15′03″W / 51.97333°N 4.25083°W |
Status | Operational |
Construction began | November 2008 |
Commission date | December 2009 |
Owner | Statkraft |
Power generation | |
Units operational | 10 x Siemens 2.3 MW |
Make and model | Siemens Wind Power |
Nameplate capacity | 23 MW |
The Alltwalis Wind Farm is a wind farm near Brechfa Forest located to the north of the town of Carmarthen in Wales.
The facility is composed of 10 wind turbines with a combined installed capacity of 23 megawatts. The expected annual production of electricity is around 65 gigawatt hours (GWh).[1] The farm was built by Statkraft. Construction began in November 2008, and was completed in December 2009.
Noise pollution
[edit]Residents of the area have reported severe problems with noise pollution from the wind farm leading to health problems for people living in the area.[2] Criticism has been levelled at Statkraft for not taking the residents' concerns seriously.[3]
References
[edit]- ^ "Alltwalis Wind Farm". Archived from the original on 3 September 2011. Retrieved 4 December 2009.
- ^ "'We should not have to take drugs'". Carmarthen Journal. 7 March 2012. Retrieved 31 March 2015.
- ^ "Calls for Alltwalis Wind Farm to be shut down". Jonathan Edwards. 7 July 2010. Archived from the original on 2 April 2015. Retrieved 31 March 2015.
External links
[edit]- Alltwalis Wind Farm website Archived 3 September 2011 at the Wayback Machine