Zhongchuan–Majiaping railway
Appearance
This article has multiple issues. Please help improve it or discuss these issues on the talk page. (Learn how and when to remove these messages)
|
Zhongchuan–Majiaping railway | |
---|---|
Overview | |
Status | Operating |
Termini | 30 December 2013 |
Service | |
Operator(s) | China Railway High-speed |
Technical | |
Line length | 30.8 km (19 mi) |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Operating speed | 160 km/h (99 mph) |
The Zhongchuan–Majiaping railway is a single-track railway line in Yongdeng County, Lanzhou, Gansu, China. It is 30.8 kilometres (19.1 mi) long and has a maximum speed of 160 kilometres per hour (99 mph).[1] It is used exclusively for freight. At its western terminus, the line connects to the Lanzhou–Xinjiang railway. At its eastern end, the line continues east as the Zhujiayao–Zhongchuan railway.[2]
References
[edit]- ^ "中川至马家坪铁路昨日调试通车" (in Chinese). Sina. 31 December 2013. Retrieved 22 September 2021.
- ^ "甘肃省列重大项目—朱中铁路完成静态验收" (in Chinese). Sohu. 17 November 2020. Retrieved 22 September 2021.