Zhangiztobe Solar Plant | |
---|---|
Country | Kazakhstan |
Location | Zhangiztobe, East Kazakhstan Region |
Coordinates | 49°12′32″N 81°12′50″E / 49.20889°N 81.21389°E |
Status | Completed in August 2019 |
Construction began | 2018 |
Commission date | 2019 |
Construction cost | US$16.7 million |
Owner | Universal Energy |
Solar farm | |
Type | Flat-panel PV |
Power generation | |
Nameplate capacity | 30MW |
Annual net output | 38.9 GWh/yr |
Zhangiztobe Solar Plant is a photovoltaic power station with a total capacity of 30MW which corresponds to an annual production of approximately 38.9 GW. It is located in Zhangiztobe (East Kazakhstan Region). The plant reduces carbon emissions in the country by 31,650 tonnes per year.[1]