Yaek Rom Klao MRT station
Appearance
Yaek Rom Klao MRT station | ||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
MRT | ||||||||||||||||
General information | ||||||||||||||||
Location | Min Buri, Bangkok, Thailand | |||||||||||||||
Owned by | Mass Rapid Transit Authority of Thailand (MRTA) | |||||||||||||||
Operated by | Bangkok Expressway and Metro Public Company Limited (BEM) | |||||||||||||||
Line(s) | MRT MRT Orange Line | |||||||||||||||
History | ||||||||||||||||
Opening | 2030 | |||||||||||||||
Services | ||||||||||||||||
|
Yaek Rom Klao station (Thai: สถานีแยกร่มเกล้า) is an under construction Bangkok MRT station and eastern terminus of the Orange Line.[1][2][3][4] As of August 2024, the structure of the station was 93.48% complete.[1]
References
[edit]- ^ a b "The MRT Orange Line (East Section)". mrta-orangelineeast.com. Retrieved 2024-11-17.
- ^ "Progress report on new city rail links". Bangkok Post. Retrieved 2024-11-17.
- ^ "เปิด "เส้นทางรถไฟฟ้าสายสีส้ม" มีสถานีไหนบ้าง คาดปี 2568 มาแน่". posttoday (in Thai). 2024-02-13. Retrieved 2024-11-17.
- ^ "Green light given to new names for some electric train stations". nationthailand. 2021-09-08. Retrieved 2024-11-17.