Xingye Donglu station
Chinese name | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Simplified Chinese | 兴业东路站 | ||||||||||
Traditional Chinese | 興業東路站 | ||||||||||
| |||||||||||
General information | |||||||||||
Location | East Xingye Road (兴业东路), Shishan Nanhai District, Foshan, Guangdong China | ||||||||||
Coordinates | 23°05′33″N 113°01′22″E / 23.09245°N 113.022789°E | ||||||||||
Operated by | Foshan Metro Operation Co., Ltd. | ||||||||||
Line(s) | Line 3 North section | ||||||||||
Platforms | 2 (1 island platform) | ||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Structure type | Underground | ||||||||||
Accessible | Yes | ||||||||||
Other information | |||||||||||
Station code | F334 | ||||||||||
History | |||||||||||
Opened | 23 August 2024 | ||||||||||
Services | |||||||||||
|
Xingye Donglu station (simplified Chinese: 兴业东路站; traditional Chinese: 興業東路站; pinyin: Xīngyè Dōnglù Zhàn; Jyutping: Hing1yip6 Dung1lou6 Zaam6) is a station on Line 3 of Foshan Metro, located in Foshan's Nanhai District.[1] It opened on August 23, 2024.[2][3]
History
[edit]When Line 3 was approved in 2012, this station was not included.[4] In 2015, the planning of Line 3 was changed, and this station was added to the line, known then as Xingye Lu.[5] In 2022 the station name was adjusted to Xingye Donglu.
The station officially started construction on December 17, 2016,[6] completed the pouring of the first base plate on April 30, 2019,[7] and the main structure was capped on April 27, 2021.[8]
Station layout
[edit]The station has an island platform under East Xingye Road.[1]
G | - | Exits A, C & D |
L1 Concourse |
Lobby | Ticket Machines, Customer Service, Shops, Police Station, Safety Facilities |
L2 | - | Station Equipment |
L3 Platforms |
Platform 1 | 3 towards Foshan University (Kesheng Lu) |
Island platform, doors will open on the left | ||
Platform 2 | 3 towards Lianhe (Foshan West Railway Station) |
Exits
[edit]There are 3 entrances/exits, lettered A, C and D, which are located on the north and south sides of East Xingye Road.[9]
Exit letter | Exit location | |
---|---|---|
A | Xingye Road | |
C | Xingye Road | |
D | Xingye Road |
References
[edit]- ^ a b 梁焯贤 (2019-12-28). "佛山地铁3号线、2号线一期站点详细位置公布!最新进展" [The detailed locations of Foshan Metro Line 3 and Line 2 Phase 1 stations have been announced! Latest progress]. Foshan News Network (in Simplified Chinese). Archived from the original on 2022-06-26. Retrieved 2024-08-22 – via Foshan Municipal People's Government.
- ^ 李传智 (2024-08-20). "官宣!佛山地铁3号线在建段将于本周五开通" [Official announcement! The under-construction section of Foshan Metro Line 3 will open this Friday]. Guangzhou Daily (in Simplified Chinese). Archived from the original on 2024-08-20. Retrieved 2024-08-22.
- ^ 刘佳伦 (2024-08-23). "佛山3号线开通首日,人气如何?南方+记者带你现场直击" [How popular is Foshan Line 3 on its first day of operation? Nanfang+ reporter takes you to the scene]. Nanfang Daily (in Simplified Chinese). Archived from the original on 2024-08-23. Retrieved 2024-08-24.
- ^ 李传智 (2013-06-07). "地铁三号线工程环评第二次公告发布:三号线将与7条地铁线换乘" [The second environmental impact assessment announcement for Metro Line 3 was released: Line 3 will transfer with 7 metro lines]. Guangzhou Daily (in Simplified Chinese). Archived from the original on 2022-07-25. Retrieved 2024-08-22 – via Sina Corporation.
- ^ 李传智; 何超 (2015-07-22). "最长地铁线串起14条轨道线" [The longest subway line connects 14 rail lines]. Guangzhou Daily (in Simplified Chinese). Archived from the original on 2022-07-29. Retrieved 2024-08-21 – via Foshan Municipal People's Government.
- ^ "【地铁3号线】荔村站、兴业路站施工,请注意绕行" [[Metro Line 3] Licun Station and Xingye Road Station are under construction, please take detours]. Foshan Railway Investment and Construction Group (in Simplified Chinese). 2016-12-21. Archived from the original on 2022-07-29. Retrieved 2024-08-22 – via Official WeChat Account of Foshan Metro.
- ^ "三号线|兴业路站首块底板顺利浇筑完成" [Line 3 - The first base slab of Xingye Road Station was successfully poured]. Foshan Railway Investment and Construction Group (in Simplified Chinese). 2019-04-30. Archived from the original on 2022-07-29. Retrieved 2024-08-22 – via Official WeChat Account of Foshan Metro.
- ^ "三号线|实现第二十座车站主体结构封顶" [Line 3 - The main structure of the 20th station has been capped]. Official WeChat Account of Foshan Metro (in Simplified Chinese). 2019-12-26. Archived from the original on 2022-07-29. Retrieved 2024-08-22.
- ^ "定了!佛山地铁3号线在建段8月23日开通运营,票价公布→" [It's settled! The under-construction section of Foshan Metro Line 3 will open on August 23, and the ticket prices will be announced →]. Zhujiang Times (in Simplified Chinese). 2024-08-20. Archived from the original on 2024-08-20. Retrieved 2024-08-22 – via Official NetEase account.
- ^ "兴业东路". Foshan Metro (in Simplified Chinese). Foshan Metro.
External links
[edit]- Station information: 兴业东路