Jump to content

Wisconsin Highway 15

Route map:
From Wikipedia, the free encyclopedia

State Trunk Highway 15 marker
State Trunk Highway 15
Map
WIS-15 highlighted in red
Route information
Maintained by WisDOT
Length14.8 mi[1] (23.8 km)
Major junctions
West end US 45 southeast of New London
Major intersections WIS 76 in Greenville
East end I-41 / US 41 / CTH-OO northwest of Appleton
Location
CountryUnited States
StateWisconsin
CountiesOutagamie
Highway system
WIS 14 WIS 16

State Trunk Highway 15 (STH-15, commonly known as Highway 15 or WIS 15) is a 14.8-mile (23.8 km)state highway in Outagamie County in the US state of Wisconsin that runs east–west and provides a shortcut to Appleton from U.S. Highway 45 (US 45) for travelers inbound from points north and west. Most of WIS 15 was once part of US 45, which was redirected south of New London to bypass Appleton and provide direct access to Oshkosh and points south.

Route description

[edit]
Looking west along WIS 15 (and CTH-T) from its eastern terminus, immediately southeast of Appleton, August 2006

WIS 15 begins at the junction of US 45 and County Trunk Highway T (CTH-T) in the Town of Hortonia (just southeast of New London) as a two-lane road and heads southeast to Hortonville. The route then continues southeast into Greenville where it becomes a multilane expressway just northwest of the unincorporated community. The highway intersects WIS 76 in Greenville then continues southeast for one mile (one point six kilometres) before turning east at the junction with CTH-CB. WIS 15 then junctions with US 41 where it ends and Northland Avenue and CTH-OO begins in the Town of Grand Chute, just northwest of Appleton. The route between US 45 and Industrial Park Avenue west of Hortonville and from Greendale Road east of Hortonville to Julius Drive west of Greenville now has centerline rumble strips.[2] WIS 15 provides access to Neuroscience Group Field at Fox Cities Stadium.[3]

History

[edit]
Looking southeasterly along WIS 15 from its eastern terminus, immediately northwest of Appleton, February 2013

This is the third iteration of the route number. The first iteration followed present day US 41 from the Illinois border to Marinette via Milwaukee, Fond du Lac, Appleton and Green Bay. The second is the more well-known alignment following the present day Interstate 43 (I-43) from the Hale Interchange in Milwaukee to I-90 in Beloit as the Rock Freeway. From the Hale Interchange, this iteration followed I-894 northward then turned east onto National Avenue and ending in downtown Milwaukee.[1]

Previously, the current WIS 15 route was US 45, which turned south at its intersection with WIS 76. The later highway continued straight on to intersect with Wisconsin Avenue (then US 10) at the north entrance road to the Fox River Mall in Appleton. The road was realigned as part of a large project that realigned US 10 and US 45. Essentially, the road south of Greenville became an extension of WIS 76 and WIS 15 is now the sole route number on the current stretch.[1]

Future

[edit]

Since 2022, the Wisconsin Department of Transportation (WisDOT) has been working on an expansion and reconstruction project between US 45 in New London to WIS 76 in Greenville. The entire length of WIS 15 will be converted into a four-lane divided expressway as part of the project.[4] Also included was the construction of a bypass section of Hortonville which completed in 2023.[5]

Between 2024 and 2025, the highway's interchange with I-41 in Grand Chute will also be reconstructed as part of the wider Appleton area I-41/US 41 expansion project.[6]

Major intersections

[edit]

The entire route is in Outagamie County.

LocationmikmDestinationsNotes
Town of Hortonia0.000.00 US 45 – Appleton, Clintonville, Marion, Antigo, Oshkosh

Bus. US 45 / CTH-T – Appleton
Western end of CTH-T concurrency; roadway continues as Bus. US 45/CTH-T
3.185.12
CTH-T south (Givens Road) – Dale

CTH-JJ east (West Main Street) – Hortonville
Eastern end of CTH-T concurrency
Hortonville5.168.30 CTH-M (Dash Street) – Medina, WinchesterConverted to overpass
Town of Greenville7.2311.64 CTH-JJ (West Broadway Drive)
Community of Greenville10.9817.67 WIS 76 (Municipal Drive) – Oshkosh, Shiocton
Town of Greenville12.7520.52 CTH-CB (Greenville Drive) – Appleton International Airport
Town of Grand Chute14.823.8 I-41 / US 41 – Milwaukee, Green Bay

CTH-OO east (West Northland Avenue) – Appleton, Little Chute
Roadway continues as CTH-OO
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
  •       Closed/former
  •       Concurrency terminus

See also

[edit]

References

[edit]
  1. ^ a b c Bessert, Chris (January 20, 2007). "Highways 10–19". Wisconsin Highways. Retrieved March 20, 2007.[self-published source]
  2. ^ Wisconsin Department of Transportation (January 2006). Outagamie Co. (PDF) (Map). 1:100,000. Madison: Wisconsin Department of Transportation. Archived from the original (PDF) on April 13, 2007. Retrieved December 29, 2007.
  3. ^ "Time Warner Cable Field at Fox Cities Stadium, Appleton" (Map). Google Maps. Retrieved December 29, 2007.
  4. ^ "WIS 15: Outagamie County". Wisconsin Department of Transportation. Retrieved July 28, 2024.
  5. ^ "WIS 15 Expansion Study". Wisconsin Department of Transportation. Retrieved July 28, 2024.
  6. ^ "I-41 Project Summary". Wisconsin Department of Transportation. Retrieved July 28, 2024.
[edit]
KML is not from Wikidata