Jump to content

Wasigny–Renneville/Berlise railway

Coordinates: 49°37′25″N 4°20′54″E / 49.62361°N 4.34826°E / 49.62361; 4.34826 (Wasigny train station)
From Wikipedia, the free encyclopedia
Wasigny–Renneville/Berlise
Berlise


Timetable, May 1914
Technical
Line length25 km (16 mi)
Track gauge1,000 mm (3 ft 3+38 in)
Route map

km
from Amagne
0
Wasigny
4
Doumely
7
Adon
10
Chaumont-Porcien
15
Rocquigny
16
La Hardoye
18
Rubigny/Wadimont
21
Fraillicourt
from Asfeld
25
Renneville/Berlise

The Wasigny–Renneville/Berlise railway was a 25 kilometres (16 miles) long metre gauge railway in the north of France, which was commissioned in 1909 and operated until 1948.[1]

History

[edit]

The secondary railway line of the Chemins de fer départementaux des Ardennes ran from Wasigny to Renneville/Berlise with a gauge of 1000 mm. A 1 km section of the line was in the département of Aisne.[2] The railway was opened in 1909 and operated until 1948.

Stations

[edit]

References

[edit]

49°37′25″N 4°20′54″E / 49.62361°N 4.34826°E / 49.62361; 4.34826 (Wasigny train station)