Line 3 (Pune Metro)

From Wikipedia, the free encyclopedia
(Redirected from Wakad Chowk metro station)

Puneri Metro (Line 3)
Overview
StatusUnder Construction
OwnerPune Metropolitan Region Development Authority (PMRDA)
Line number3
LocalePune Metropolitan Region
Termini
Stations23
Websitepunerimetro.in
Service
TypeRapid Transit
SystemPune Metro
Depot(s)Maan, Hinjawadi
Rolling stockAlstom Metropolis[1]
History
Planned openingMarch 2025; 4 months' time (2025-03)[2]
Technical
Line length23.3 km (14.5 mi)
Number of tracks2
CharacterGrade separated, Elevated
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification750V DC Third rail
Operating speed80 km/h (50 mph)Top Speed: 80 kmph; Average Speed: 34 kmph
SignallingCommunications-based train control (CBTC)
Route map

Megapolis Circle
Quadron
Dohler
Infosys Phase II
Wipro Technologies
Pall India
Shivaji Chowk (Hinjewadi)
Hinjewadi
Wakad Chowk
Balewadi Stadium
NICMAR
Ramnagar
Laxmi Nagar
Balewadi Phata
Baner Gaon
Baner
Indian Agricultural Research Institute
Sakal Nagar
Savitribai Phule Pune University
Reserve Bank of India
Agriculture College
Shivaji Nagar Bus interchangeMainline rail interchange  Purple 
Civil Court  Purple   Aqua 

Puneri Metro Line 3 of the Pune Metro is the third line of the city of Pune's under-construction mass transit network. It will run from District Court, Pune to Megapolis Pune in Hinjawadi. The 23.3 km (14.5 mi) line will be completely elevated and will have 23 stations and will align with the MahaMetro lines at the District Court interchange station.[3][4] The construction will be taken up in two phases, the section between Hinjawadi and Balewadi is expected to be taken up first, followed by the section between Balewadi and District Court, Shivaji Nagar. A metro car shed will be built in Hinjawadi. The MIDC will provide 55 acres of land in Hinjawadi for setting up a Metro rail depot.[5][6][7] On 3 August 2018, Pune Metropolitan Region Development Authority (PMRDA) announced the final bidder for the project — the joint venture Tata Realty-Siemens.[8]Pune IT City Metro Rail Limited On 3 October 2018, Tata Realty-Siemens were awarded the contract to execute the project on a design, build, finance, operate and transfer model.[9][10][11] The formal concession agreement was signed in September 2019 [12] with the construction expected to begin in March 2020.[13] The project is set to be completed in March 2025.[14]

Route

[edit]

Metropolitan Line will run from Civil Court, Pune to Megapolis Pune in Hinjawadi. The 23.3 km (14.5 mi) line will be completely elevated and will have 23 stations and will align with the MahaMetro lines at the Civil Court interchange station. Depot will be located at Maan village. It will be spread across 20 hectares (49 acres).[15]

List of stations

[edit]

Following is a list of stations on this route:

Line 3
# Station Name Status Connections Layout
English Marathi
1 Megapolis Circle मेगापॉलिस सर्कल Under Construction None Elevated
2 Quadron क्वॉड्रन
3 Döhler डोह्लर
4 Infosys Phase II इंफोसिस फेस २
5 Wipro Technologies विप्रो तंत्रज्ञान
6 Pall India पॉल इंडिया
7 Shivaji Chowk शिवाजी चौक
8 Hinjawadi हिंजवडी
9 Wakad Chowk वाकड चौक
10 Balewadi Stadium बालेवाडी स्टेडियम
11 NICMAR रा.बां.व्य.सं.सं
12 Ramnagar रामनगर
13 Laxmi Nagar लक्ष्मी नगर
14 Balewadi Phata बालेवाडी फाटा
15 Baner Gaon बाणेर गाव
16 Baner बाणेर
17 Indian Agricultural Research Institute/IISER Pune भा. कृ. सं. सं / भा. वि. शि. सं. सं. पुणे
18 Sakal Nagar सकाळ नगर
19 Savitribai Phule Pune University सावित्रीबाई फुले पुणे विद्यापीठ
20 Reserve Bank of India भारतीय रिझर्व्ह बँक
21 Agriculture College कृषी महाविद्यालय
22 Shivaji Nagar शिवाजीनगर Interchange for Purple Line
23 Civil Court दिवाणी न्यायालय Interchange for Purple Line &
Aqua Line

Construction

[edit]

Contract for conducting geotechnical investigation was awarded to Soiltech India Private Limited.[16] Geotechnical investigation commenced on 19 June 2019.[17] However, due to COVID-19 pandemic and subsequent nationwide lockdown, work on several projects had been delayed, including Line 3. Following a gap of nearly 11 months, piling works resumed at multiple locations near Hinjawadi in May 2020.[17]

Extension

[edit]

PMRDA proposed an extension of Line 3 from Civil Court station towards Hadapsar.[18] In-principle approval for DPR was given by the then CM and PMRDA head Devendra Fadnavis in December 2018. DPR for extension is being prepared by Delhi Metro Rail Corporation under supervision of PMRDA.[19] As per draft DPR submitted by PMRDA, proposed stations for extension will be Railway Colony, Collector's Office, MG Road, Fashion Street, Mhammadevi Chowk, Race Course, Kaluba Chowk, Vaiduwadi, Hadapsar Phata, Hadapsar Gadital bus stand, Civil Aviation Ground, Phursungi IT Park and Sulabh Garden.[20]

In December 2020, DMRC announced bid to conduct geotechnical investigation works for DPR preparation for Hadapsar-Loni Kalbhor extension.[21] The second extension is expected to increase line 3's length by 8.5 km (5.3 mi) with 4-5 new stations at various locations.[citation needed]

References

[edit]
  1. ^ "Alstom successfully delivers the first train for Pune Metro Line 3". Alstom. 3 June 2024. Retrieved 19 September 2024. As a part of this contract, Alstom is manufacturing 22 Metropolis trainsets of three cars each that can carry 1,000 passengers per train.
  2. ^ "Pune Metro Line 3 to be operational by March 2025". Hindustan Times. 29 August 2022. Retrieved 8 September 2023.
  3. ^ "Central government approves Shivajinagar-Hinjawadi Metro corridor on PPP basis". hindustantimes.com/. 7 March 2018. Retrieved 8 March 2018.
  4. ^ "Tech companies keen to stamp their names on Metro stations - Times of India". The Times of India. Retrieved 10 March 2018.
  5. ^ pune-metro-full-presentation. Slideshare.net (29 April 2010).
  6. ^ "Pune: Metro route III, from Hinjawadi to Shivajinagar, on fast track". The Indian Express. 5 March 2017. Retrieved 4 May 2018.
  7. ^ "Hinjawadi to Shivajinagar Metro line gets state nod - Times of India". The Times of India. Retrieved 4 May 2018.
  8. ^ "Tata Realty". Archived from the original on 20 August 2019. Retrieved 15 November 2018.
  9. ^ Pillay, Amritha (4 October 2018). "Tata-Siemens to develop Pune Metro Line-3, construction to start in June". Business Standard India. Retrieved 5 October 2018.
  10. ^ "Shivajinagar-Hinjewadi Metro project in Pune on fast track as Tata-Siemens consortium bags contract". Hindustan Times. 4 October 2018. Retrieved 5 October 2018.
  11. ^ "Tata-Siemens consortium wins bid for Rs 8k-cr Pune Metro line". The Financial Express. 4 October 2018. Retrieved 5 October 2018.
  12. ^ "PMRDA inks agreement for third Pune Metro corridor". The Times of India. 21 September 2019. Retrieved 23 January 2020.
  13. ^ "Shaping transportation in India". Official website of Siemens Financial Services GmbH. Retrieved 23 January 2020.
  14. ^ "Pune Metro Line 3 to be operational by March 2025". Hindustan Times. 29 August 2022. Retrieved 8 September 2023.
  15. ^ "Pune Metro Line-3 – Information, Route Map, Fares, Tenders & Updates".
  16. ^ "Geotechnical Work Resumes for Pune Metro's Line-3 at Hinjawadi". 20 May 2020.
  17. ^ a b "Tata-Siemens Begins Piling for Pune Metro's Line-3". 19 November 2020.
  18. ^ Shah, Narendra (20 January 2020). "Pune Metro Extensions approves on all route under PPP model".
  19. ^ "PMRDA proposes to extend Metro line till Hadapsar | Pune News - Times of India". The Times of India.
  20. ^ "State approval for Pune metro civil court-Hadapsar corridor expected by Jan 2018". Hindustan Times. 3 November 2018.
  21. ^ "Pune Metro update: Bids invited for Geo-Technical Investigation work for two new Metro corridors". 3 December 2020.